Question

In an amusement park ride, a roller coaster car carries screaming patrons down a steep incline. On the way, they go through an artificial thunderstorm that involves sprinklers Youre the technical consultant, and your boss gives you the parameters the ride must fit into. She wants customers to be subjected to the rain for only 0.2 seconds; furthermore, the length of the water spraying device is fixed, providing a set distance along the tracks during which the spray comes down. How far above the water sprayer should the roller coaster car start? If you have not collected the necessary data by the end of the lab session, simply describe the process you would take to solve this problem KINEMATIC EQUATIONS: V -Vo +(-9.8m/s) V2-Vo 2-2(-9.8m/s2)(y-Yo)

I'm a bit unsure on how I would go about solving this. The incline made a 25-degree angle under the thunderstorm area, and the rest of the measurements can be seen in the image, but I don't think I collected enough information. Any suggestions on how to solve a problem like this (even if there isn't an answer available) would be appreciated. Will rate.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Cro he to he (aver n o sec Let gpeedat Paint Ys Requin d Speed 8 S 1.36 co 6. Hence. She win tt yon Pont-P r36cm away om poimt-B

Add a comment
Know the answer?
Add Answer to:
I'm a bit unsure on how I would go about solving this. The incline made a...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Because of your physics background, you have been hired by an amusement park as the technical...

    Because of your physics background, you have been hired by an amusement park as the technical consultant for a new ride that is being developed. Patrons get into a roller coaster car that accelerates down a steep incline. On the way down, they go through an artificial “thunderstorm” that involves sprinklers. Your boss wants customers to be subjected to the “rain” for only a short amount of time (0.3 seconds). In addition, the water spraying apparatus has already been built...

  • How would I go about solving this? A car tire is filled with air at pressure...

    How would I go about solving this? A car tire is filled with air at pressure 325000 Pa at 283 K. If the tire warms up to 302 K, what is the new pressure of the tire? (Hint: n and V are constant.) (Unit= Pa) opyright 0- l Rights Resered

  • I am unsure how to go about solving the problem I'v tried several times to solve...

    I am unsure how to go about solving the problem I'v tried several times to solve it Crane Company is a multidivisional company. Its managers have full responsibility for profits and complete autonomy to accept or reject transfers from other divisions. Division A produces a subassembly part for which there is a competitive market. Division B currently uses this subassembly for a final product that is sold outside at $2,440. Division A charges Division B market price for the part,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT