Question

Q Search this cours er 13 Assignment Four different paints are advertised as having the same drying time. To check the manufa
0 0
Add a comment Improve this question Transcribed image text
Answer #1

For the given data using Anova single factor in Excel we get output as

Anova: Single Factor
SUMMARY
Groups Count Sum Average Variance
paint 1 5 665 133 47.5
paint 2 5 695 139 50
paint 3 5 680 136 21
paint 4 5 720 144 54.5
ANOVA
Source of Variation SS df MS F P-value F crit
Between Groups 330 3 110 2.543353 0.092764 3.238872
Within Groups 692 16 43.25
Total 1022 19

। from the above alput * Sum of squares, Treatment = 330 * Sum of squares, Eroor 692 & Mean squares, Treatment 110 * Mean squ

Add a comment
Know the answer?
Add Answer to:
Q Search this cours er 13 Assignment Four different paints are advertised as having the same...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Four different paints are advertised as having the same drying time. To check the manufacturer's claims,...

    Four different paints are advertised as having the same drying time. To check the manufacturer's claims, five samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. The following data were obtained. Click on the datafile logo to reference the data DATA file Paint 1 Paint 2 144 133 142 146 130 Paint 3 128 137 135 124 141 133 143 137 136...

  • eBook Four different paints are advertised as having the same drying time. To check the manufacturer's...

    eBook Four different paints are advertised as having the same drying time. To check the manufacturer's claims, five samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. The following data were obtained. Excel users: The data set is available in file named Paint. All data sets can be found on the premium online datasite. Click on the datafile logo to reference the...

  • Four different paints are advertised as having the same drying time. To check the manufacturer's claims,...

    Four different paints are advertised as having the same drying time. To check the manufacturer's claims, five samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. The following data were obtained. Click on the datafile logo to reference the data. At the  = .05 level of significance, test to see whether the mean drying time is the same for each type of paint....

  • Four different paints are advertised as having the same dryingtime. To check the manufacturer's claims, five...

    Four different paints are advertised as having the same dryingtime. To check the manufacturer's claims, five samples were testedfor each of the paints. The time in minutes until the paint was dryenough for a second coat to be applied was recorded. The followingdata were obtained. Excel or Minitab users: The data set is available in file namedPaint. All data sets can be found in your eBook or on your StudentCD. Atthe = .05 level of significance, test to see whether...

  • 5. Four different paints are advertised to have the same drying times. To verify the manufacturer's...

    5. Four different paints are advertised to have the same drying times. To verify the manufacturer's claim, seven samples were tested for each of the paints. The time in minutes untl the paint was dry enough for a second coat to be applied was recorded. Below are the results which may be imported into MSExcel for anatysls: (Assume the populations are normally distributed, the populations are independent and the population varlances are equal) Paint 1 Paint 2 Paint 3 Paint...

  • Four different paints are advertised to have the same drying times. Use the Kruskal Wallis Test...

    Four different paints are advertised to have the same drying times. Use the Kruskal Wallis Test – Analysis of Variance by Ranks, to verify the manufacturer’s claim.  Remember that seven samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded.  Below are the results.     Paint 1 Rank Paint 2 Rank Paint 3 Rank Paint 4 Rank 114 112 126 115 117 118 127 117 120...

  • Please label and show each step Four different paints are advertised to have the same drying...

    Please label and show each step Four different paints are advertised to have the same drying times. Use the Kruskal Wallis Test – Analysis of Variance by Ranks, to verify the manufacturer’s claim. Remember that seven samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. Below are the results.    Paint 1 Rank Paint 2 Rank Paint 3 Rank Paint 4 Rank...

  • Please label and show each step. Four different paints are advertised to have the same drying...

    Please label and show each step. Four different paints are advertised to have the same drying times. To verify the manufacturer’s claim, seven samples were tested for each of the paints. The time in minutes until the paint was dry enough for a second coat to be applied was recorded. Below are the results which may be imported into MSExcel for analysis: (Assume the populations are normally distributed, the populations are independent and the population variances are equal) Paint 1...

  • #6 please complete whole question Chapter 13 Assignment (C13 Asgmt Search this course ) 으 ASHLE...

    #6 please complete whole question Chapter 13 Assignment (C13 Asgmt Search this course ) 으 ASHLE ● Totest whether the mean time needed to mix a batch of matenal is the same nor med i es prodeed by three na usamene see satan sonases on sa edad (in minutes) needed to mix the material. 10 20 26 24 15 37 17 14, ● a.Use these data to test rthe poolation--for miing batch of mater-d er for three mar hd res...

  • To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturer...

    To test whether the mean time needed to mix a batch of material is the same for machines produced by three manufacturers, the Jacobs Chemical Company obtained the following data on the time (in minutes) needed to mix the material Manufacturer 2 3 27 21 21 25 19 a. Use these data to test whether the population mean times for mixing a batch of material differ for the three manufacturers. Use α = .05 the values below (to 2 decimals,...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT