Solution : ( a )
Number of selections result in all 4 workers coming from the day shift
-------------------------------------------------------------------------------------------------
Solution : ( b )
Probability that all 4 selected workers will be from the same shift
-----------------------------------------------------------------------------------------------
Solution : ( c )
Probability at least 2 different shifts will be represented among the selected workers
= 1- ( Probability that all 4 selected workers will be from the same shift )
------------------------------------------------------------------------------------------------------------------------
Solution : ( d )
Probability that at least 1 of the shifts will be unrepresented in the sample of workers
A production facility ernploys 10 workers on he day shift, 8 workers on the swing shift,...
A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and 6 workers on the graveyard shift. A quality control consultant is to select 4 of these workers for in-depth interviews. Suppose the selection is made in such a way that any particular group of 4 workers has the same chance of being selected as does any other group (drawing 4 slips without replacement from among 24) (a) How many selections result in all...
A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and 6 workers on the graveyard shift. A quality control consultant is to select 3 of these workers for in-depth interviews. Suppose the selection is made in such a way that any particular group of 3 workers has the same chance of being selected as does any other group (drawing 3slips without replacement from among 24). A)How many selections result in all 3 workers...
ant is to select 3 of A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and these workers for in-depth interviews. Suppose the selection is made in such a way that any particular group of 3 workers has the same other 6 workers on the graveyard shift. A quality control chance of being selected as does any group (drawing 3 slips without replacement from among 24) (a) How many selections result in all...
The answer is NOT 0.0723 or .9632 A production facility employs 10 workers on the day shift, 8 workers on the swing shift, and 6 workers on the graveyard shift.A uality control consultant is to select of these workers for in-depth interviews Suppose the selection is made in such a way that any particular group of 4 workers has the same chance of being selected as does any other group (drawing 4 slips without replacement from among 24). (a) How...
0.12/0.18 points Pravious Answers DavoreStar9 2E.036. A production acility omplo s 10 workers on the day shif 8 workers on the swing shift, and 6 workers on the grave a shift A qualty control consultant is to select 4 ofthese workers for in-depth interva s Suppose the selection is made n such particular group of 4 workers has the same chance of beling selected as does any other group (drawing 4 slips without replacement from among 24) My Notes Ask...
Problem #6: A production facility employs 16 workers on the day shift, 12 workers on the swing shift, and 9 workers on the graveyard shift. A quality control consultant is to randomly select 6 of these workers for in-depth interviews. (a) What is the probability that all 6 selected workers will be from the same shift? (b) What is the probability that at least two different shifts will be represented among the selected workers? () What is the probability that...
Factory workers are constantly encouraged to practice zero tolerance when it comes to accidents in factories. Accidents can occur because the working environment or conditions themselves are unsafe. On the other hand, accidents can occur due to carelessness of so-called human error. In addition, the worker's shift, 700 AM 10 300 PM day shift), 300 PM to 1100 PM (evening shift), or 11:00 PM to 7:00 AM graveyard shift), may be a factor During the last year, 400 accidents have...
The production manager of MPS Audio Systems Inc. is concerned about the idle time of workers. In particular, he would like to know if there is a difference in the idle minutes for workers on the day shift and the evening shift. The information below is the number of idle minutes yesterday for the five day-shift workers and the six evening-shift workers. Day Evening Shift Shift 98 99 119 118 118 31 105 State the decision rule. Use the 0.10...
Chapin Manufacturing Company operates 24 hours a day, five days a week. The workers rotate shifts each week. Management is interested in whether there is a difference in the number of units produced when the employees work on various shifts. A sample of five workers is selected and their output recorded on each shift. At the 0.01 significance level, can we conclude there is a difference in the mean production rate by shift or by employee? Day 39 Units Produced...
Q.4.The forming Department of the ABC Company employs six workers on an 8-hour shift at $12.50 per hour. Factory overhead is $120 per hour. Production for the second week of June shows, Monday, 460 units, Tuesday, 475 units, Wednesday, 492units, Thursday, 500 units and Friday, 510 units. The company has recently installed a group 100-percent bonus system with a standard production for the group of 60 units per hour. The bonus is computed for each day. The controller asks that...