Martock Corp. is also considering the recommendation of an industrial engineer firm to optimize its production...

Martock Corp. is also considering the recommendation of an industrial engineer firm to optimize its production facility.(discount rate of 10.7%) Management estimate that the changes to the facility will result in annual reductions in cash outflows (i.e., will result in cost savings) as follows:

• Savings in Years 1 through 4 of $6.25 mln annually

• Starting in Year 5, these savings will decline by 8% year-over-year up to and including Year 13

• Savings in Years 14 and 15 will then decline by 50% year-over-year

• Project savings will terminate at the end of Year 15

a. One alternative for undertaking this optimization is for MC to pay a one-time fee today.

i. If the cost today is $40 mln, should MC proceed with the project?

ii. What is the maximum amount that MC could spend on the project today and it still be viable?

b. A second alternative for MC is for the engineering firm to fund the initial cost of the project and for MC to make annual payments to this firm over the project’s 15-year life.

i. If the annual payments to the engineering firm are $4.75 mln, should MC undertake the project?

ii. What is the implied interest rate that the engineering firm is charging to MC under this arrangement?

iii. What is the maximum amount that MC could pay each year for the project to be viable, assuming the firm makes equal annual payments to the engineering firm?

iv. Assume that the annual payments to the engineering firm increase by 2% annually to offset inflation. What would be the value of the maximum payments in Years 1 and 15 to the engineering firm, assuming the project is viable?

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer:- * According to data- Page 1 i since, the required rate of return is not given here, we will assume it to be 8% annuapage-2 (f 13 = $2.95 mn CFR = $1.48 mn cfig = $0.74mn. with a discount rate of 8%, we get the present values of all future caPage-3 The present value of all these payments with a discount rate of 8% is= $40.65 mn. since, it is greater than the pr of

Add a comment
Know the answer?
Add Answer to:
Martock Corp. is also considering the recommendation of an industrial engineer firm to optimize its production...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Martock Corp. is considering one of the following four mutually exclusive projects(WACC of 10.7%): Project Aphrodite:...

    Martock Corp. is considering one of the following four mutually exclusive projects(WACC of 10.7%): Project Aphrodite: Requires an initial investment of $15 mln, payable today. Annual cash inflows from the project will be $2.25 mln for 20 years. Project Apollo: Requires an initial investment of $17 mln payable today. Cash inflows in Year 1 will be 3 mln. Cash inflows will then grow by 7% per year until the project ends in Year 9. Project Demeter: Requires an initial investment...

  • Atlantic Tires is considering an investment in a new production facility. For the next five years,...

    Atlantic Tires is considering an investment in a new production facility. For the next five years, the company expects to achieve an annual cash flow of $3,500,000 if the project is successful and $1,000,000 if the project is a failure. Projects of this nature are successful 60% of the time. The initial investment required is $9,500,000, and the relevant discount rate is 10%. Assume the production facility will be obsolete five years from now (i) What is the base-case NPV?...

  • A company is considering building a new and improved production facility for one of its existing...

    A company is considering building a new and improved production facility for one of its existing products. It would be built on a piece of vacant land that the firm owns. This land was acquired four years ago at a cost of $500,000; it has a current market value of $800,000. The building can be erected for $600,000. Machinery (equipment) worth $120,000 needs to be bought. The company will finance the construction of the building and the purchase of the...

  • "A firm is considering purchasing a computer system. -Cost of system is $194,000. The firm will...

    "A firm is considering purchasing a computer system. -Cost of system is $194,000. The firm will pay for the computer system in year 0. -Project life: 4 years -Salvage value in year 0 (constant) dollars: $15,000 -Depreciation method: five-years MACRS -Marginal income tax rate = 37% (remains constant over time) -Annual revenue = $152,000 (year-0 constant dollars) -Annual expenses (not including depreciation) = $86,000 (year-o constant dollars) -The general inflation rate is 3.6% during the project period (which will affect...

  • We have the opportunity to building a new manufacturing facility which will reduce our annual cost...

    We have the opportunity to building a new manufacturing facility which will reduce our annual cost of production for 50 million pounds of fertilizer from $1.00/lb. to $.70/lb. The life of the new plant will be 20 years. The engineering firm we have hired estimates the cost to build the plant at $80 million, all to be spent in the current year. The contract with the plant construction company limits the maximum cost to the engineering firm estimate plus 10%....

  • "A firm is considering purchasing a computer system. -Cost of system is $107,000. The firm will...

    "A firm is considering purchasing a computer system. -Cost of system is $107,000. The firm will pay for the computer system in year 0. -Project life: 6 years -Salvage value in year 0 (constant) dollars: $25,000 -Depreciation method: five-years MACRS -Marginal income-tax rate = 39% (remains constant over time) -Annual revenue = $126,000 (year-0 constant dollars) -Annual expenses (not including depreciation) = $98,000 (year-0 constant dollars) If the general inflation rate is 5.9% during the project period (which will affect...

  • You are considering a project that will supply an automobile production facility with 35,000 tonnes of...

    You are considering a project that will supply an automobile production facility with 35,000 tonnes of machine screws annually for five years. To get the project started, you will need an initial investment of $1,500,000 in threading equipment. The project will last for five years. The accounting department estimates that annual fixed costs will be $300,000 and that variable costs should be $200 per tonne. The CCA rate for threading equipment is 20%. Accounting estimates a salvage value of $500,000...

  • 3) A Firm is considering adopting a new technology to improve its production process. The implementation...

    3) A Firm is considering adopting a new technology to improve its production process. The implementation cost would be $ 300,000. The initial annual operating cost of $ 40,000 will increase by $5,000 per year after the first year. The new technology would produce yearly savings of $ 100,000. The time span before the technology becomes obsolete and needs to be replaced is estimated in 10 years. At the time of replacement, the salvage value of the obsolete equipment is...

  • a firm is considering adopting a new technology to improve its production process. the implementation cost...

    a firm is considering adopting a new technology to improve its production process. the implementation cost would be $300,000. The initial annual operating cost of $40,000 will increase by $5,000 per year after the first year. The new technology would produce yearly savings of $100,000. The time span before the technology becomes obsolete and needs to be replaced is estimated in 10 years. at the time of replacements, the salvage value of the obsolete equipment is estimated to be $...

  • Boyertown Industrial Tools is considering a three-year project to improve its production efficiency. Buying a new...

    Boyertown Industrial Tools is considering a three-year project to improve its production efficiency. Buying a new machine press for $578,000 is estimated to result in $184,000 in annual pretax cost savings. The press falls in the MACRS five-year class, which has percentage rates starting with Year 1, of 20, 32, 19.20. 11.52, 11.52, and 5.76. The salvage value at the end of the project of $162,000. The press also requires an initial investment in spare parts inventory of $19,000, along...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT