How do you calculate allocated manufacturing overhead to a certain job?
By multiplying the total estimated manufacturing overhead by the total estimated allocation base to be used = A |
||
By multiplying the predetermined manufacturing overhead rate by the estimated allocation base to be used by the job = B |
||
By multiplying the predetermined manufacturing overhead rate by the actual allocation base used by the job = C |
||
By multiplying the estimated manufacturing overhead rate by the actual allocation base used by the job = D |
Option C is the answer | ||
Allocated manufacturing overhead = Predetermined overhead rate * Actual allocation base used by the job. Comment if you face any issues |
How do you calculate allocated manufacturing overhead to a certain job? By multiplying the total estimated...
How do you calculate the predetermined manufacturing overhead rate used to allocate manufacturing overhead costs? A.By dividing the total estimated manufacturing overhead costs by the total estimated amount of the allocation base B.By dividing the total estimated amount of the allocation base by the total estimated manufacturing overhead costs C.By dividing the total estimated manufacturing overhead costs by the total actual amount of the allocation base D.By multiplying the total estimated manufacturing overhead costs by the total estimated amount of...
Estimated total machine-hours (MHS) Estimated total fixed manufacturing overhead cost Estimated variable manufacturing overhead cost per MH Forming Customizing 6,000 4, een $16,800 $9,200 $ 2.00 $ 4.00 Total 10,000 $26, eee During the period, the company started and completed two jobs--Job C and Job L. Data concerning those two jobs follow: Direct materials Direct labor cost Forming machine-hours Customizing machine-hours Job C Job L $14,700 $ 8,400 $21,600 $ 8,400 2,7ee 3,380 400 3,689 Required: a. Assume that the...
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour 2,500 $10,000 $ 1.40 1,500 $15,000 $ 2.20 4,000 $25,000 Job P $13,000 $21,080 Job $8,000 $7,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 1,700 600 2,380 800 900 1,700 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the...
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication Total 2,500 1,500 4,000 $13,250 $16,95€ $30, 200 $ 2.70 $ 3.50 Job P $26,000 $31,400 Job O $14,500 $12,700 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 3,000 1,900 4,900 2,100 2,200 4,300 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead...
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication Total 2,500 1,500 4,000 $10,000 $15,000 $25,000 $ 1.40 $ 2.20 Job Job P $13,000 $21,000 $8,000 $7,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 1,700 600 2,300 800 900 1,700 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with...
CH 2 KB. The predetermined manufacturing overhead rate is calculated by multiplying the actual allocation base factor by the estimated annual MOH multiplying the predetermined MOH rate by the actually allocation base factor dividing the annual estimated MOH by the annual estimated MOH allocation base multiplying the predetermined MOH rate by the actual allocation base
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication Total 2,500 1,500 4,000 $13,250 $16.950 $30,200 $ 2.70 $ 3.5e 15 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total Job P Job o $26,200 $14,500 $31,400 $12,700 3, eee 2,100 1,900 2,200 4,300 4,900 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined...
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication Total 2,500 1,500 $10,000 $15,000 $25,000 $ 1.40 $ 2.20 Job P $13,000 $21,000 Job O $8,000 $7,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 1,700 600 809 900 1,700 2,300 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with...
Data Allocation base Machine-hours Estimated manufacturing overhead cost $300,000 Estimated total amount of the allocation base 75,000 machine-hours Actual manufacturing overhead cost $290,000 Actual total amount of the allocation base 68,000 machine-hours Computation of the predetermined overhead rate Estimated manufacturing overhead cost ? Estimated total amount of the allocation base ? machine-hours Predetermined overhead rate ? per machine-hour Computation of underapplied or overapplied manufacturing overhead Actual manufacturing overhead cost ? Manufacturing overhead cost applied to Work in Process during the...
Estimated total machine-hours used Estimated total fixed manufacturing overhead Estimated variable manufacturing overhead per machine-hour Molding Fabrication Total 2,500 1,500 4,000 $10,000 $15,000 $25,000 $ 1.40 $ 2.20 Job P $13,000 $21,000 Job 9 $8,000 $7,500 Direct materials Direct labor cost Actual machine-hours used: Molding Fabrication Total 1,700 600 2,300 BOG 969 1,789 Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month. Required: For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate...