a) Given number of defects and various sample sizes so we have to use U chart to detect under control of the process or not.
From the given data,
Size (ni) | Number of defects (ui) | ||||
Cookie No. | ui = ci/ni | LCL | UCL | ||
1 | 9 | 1 | 0.1111 | -0.22855 | 0.478553 |
2 | 9 | 0 | 0 | -0.22855 | 0.478553 |
3 | 18 | 3 | 0.1667 | -0.125 | 0.375 |
4 | 27 | 5 | 0.1852 | -0.07912 | 0.329124 |
5 | 9 | 0 | 0 | -0.22855 | 0.478553 |
6 | 18 | 2 | 0.1111 | -0.125 | 0.375 |
7 | 9 | 1 | 0.1111 | -0.22855 | 0.478553 |
8 | 27 | 4 | 0.1481 | -0.07912 | 0.329124 |
9 | 9 | 2 | 0.2222 | -0.22855 | 0.478553 |
10 | 9 | 0 | 0 | -0.22855 | 0.478553 |
Total : | 144 | 18 |
The LCL and UCL values are calculated by using the above formulae.
b) U-Chart:
Here all points are lies between LCL and UCL so the process is under control
(b) Does the process producing the cookies appear to be in control? What actions would you...
(0) Des the prcess producing the cookies appear to be in control? What ctions would you ssk based on the inspection results 4 (10 points) The quality of a cookie production job has been examined, and the results are shown below. The same definition of defect used in Problem 3 is also used here. Cookie No 1O 9918 27918 92799 0 Size (in) Number of defects 0 0 2 (a) Using an appropriate control chart, to construct the control limits...
130 poin) The quality of a cookie production job has been examined, and the results ars hown below A defs is defined having a broken heart-shaped sprinkle. The cookies are dentical in sine which is equal to9n Cookie No 1234S678910 Number of defects 1023 2142 (a)Construct the control limits using an appropriate.sontrel shart of your choice to monitor this process. You do not need to sketch the chart, but you need to show the center line and the control limits...
A Procter and Gamble factory process fills boxes with detergent. Construct an appropriate set of control charts to monitor the process. Historical data for fill weight (in ounces) of eight samples is presented below. A sample size of six was used. Sample Sample Mean Sample Range 1 15.80 0.42 2 16.10 0.38 3 16.02 0.08 4 15.95 0.15 5 16.12 0.42 6 16.18 0.23 7 15.87 0.36 8 16.20 0.40 a. Compute the limits for both an R-chart and x-bar...
Do the following problems: The following are quality control data for a manufacturing process at Kensprt Chemical Company. The data show the temperature in degrees centigrade at five points in time during the manufacturing cycle. The company is interested in using quality control charts in monitoring the temperature of its manufacturing cycle. Construct an X bar and R chart and indicate what its tells you about the process. Sample X bar R 1 95.72 1.0 2 95.24 .9 3 95.38 ...
can you please answer all question Attribute Control Charts Q1. The results of an inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 Defectives 7 6 6 9 5 6 0 8 9 10 1 a) Construct a 3-sigma p-chart using this information. What are the 3 sigma control limits? b) Using the control chart in part (a), and finding that the...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.9 4 95.48 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 1.0 8 95.44 0.3 9 95.08 0.2 9 10 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.5 15 95.04...
1st*variability is: in control/out of control 2nd*no samples fall/one/two/more 3rd* in control/out of control The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. X Sample R 1 95.72 1.0 95.24 2 0.9 0.9 95.18 95.42 0.4 4 5 95.46 0.5 95.32 1.1 6 7 95.40 0.9 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12...
A large certified public accounting firm has been monitoring the accuracy of its employees and wishes to get the number of accounts with errors under statistical control. It has sampled 100 accounts for each of the last 30 days and has examined them for errors, with the results shown in the accompanying data. Complete parts a through c below. Click the icon to view the counts for accounts with errors. a. Construct a p-chart for the account process. Choose the...
What is a control chart? What are its main features and how is it used? I included the definition of a control chart so there isn't any confusion. Please include an explantion in your own words. Control Chart Assuming production engineers have gotten everything to work such that the process conforms to specifications (the average of the process is close to the target value and the variability [standard deviation] is very small), after that they have to ensure that the...
Calculate p-chart three-sigma control limits to asses whether the capping process is in statistical control. SHOW ALL WORK 17. Management at Webster, in Problem 16, is now concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 144. Several boxes are inspected, and the following numbers of leaking tubes are found: Sample Tubes...