Solution:
Flexible budget | Flexible budget at | |||
Particulars | Variable amount per unit | Total fixed costs | 122000 units | 116000 units |
Fixed costs | $125,000.00 | $125,000.00 | $125,000.00 | |
Variable costs | $1.40 | $170,800.00 | $162,400.00 | |
Total flexible budget | $295,800.00 | $287,400.00 | ||
Controllable overhead variance | ||||
Total actual overhead costs | $253,800.00 | |||
Total flexible budget amount | $287,400.00 | |||
Controllable overhead variance | $33,600.00 | Favorable |
QS 8-13 Controllable overhead variance LO P3 Fogel Co. expects to produce 122.000 units for the...
QS 23-13 Controllable overhead variance LO P3 Fogel Co expects to produce 109.000 units for the year. The company's flexible budget for 109,000 units of production shows variable overhead costs of $152,600 and fixed overhead costs of $125,000 For the year, the company incurred actual overhead costs of $261,800 while producing 103,000 units Compute the controllable overhead variance and classify it as favorable or unfavorable. (Round cost per unit to 2 decimal places.) Flexible Budget. Flexible Budget at Variable Amount...
QS 23-13 Controllable overhead variance LO P3 Fogel Co. expects to produce 109,000 units for the year. The company's flexible budget for 109,000 units of production shows variable overhead costs of $152.600 and fixed overhead costs of $125.000. For the year, the company incurred actual overhead costs of $261.800 while producing 103.000 units Compute the controllable overhead variance and classify it as favorable or unfavorable (Round cost per unit to 2 decimal places.) ...Flexible Budget at - ----Flexible Budget... Variable...
QS 21-13 Controllable overhead variance LO P3 Fogel Co. expects to produce 102.000 units for the year. The company's flexible budget for 102.000 units of production shows variable overhead costs of $142,800 and fixed overhead costs of $127,000. For the year, the company incurred actual overhead costs of $260,800 while producing 96,000 units. Compute the controllable overhead variance and classify it as favorable or unfavorable. (Round cost per unit to 2 decimal places.) ------Flexible Budget at ----- ------Flexible Budget------ Variable...
QS 21-13 Controllable overhead variance LO P3 Fogel Co. expects to produce 102,000 units for the year. The company's flexible budget for 102.000 units of production shows variable overhead costs of $142,800 and fixed overhead costs of $127,000. For the year, the company incurred actual overhead costs of $260,800 while producing 96,000 units. Compute the controllable overhead variance and classify it as favorable or unfavorable. (Round cost per unit to 2 decimal places.) ------Flexible Budget at ------ ------Flexible Budget----- Variable...
Exercise 21-21 Overhead controllable and volume variances; overhead variance report LO P4 James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels 80% 10,000 25,000 Overhead Budget Production in units Standard direct labor hours Budgeted overhead Variable overhead costs Indirect materials Indirect labor Power Maintenance Total variable costs Fixed overhead costs...
I already inputted all the word values, i just need the numbers Exercise 21-21 Overhead controllable and volume variances; overhead variance report LO P3 James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels Overhead Budget Production in units 808 10,000 Standard direct 1abor hours 27,000 Budgeted overhead Variable overhead costs...
World Company expects to operate at 80% of its productive capacity of 50,000 units per month. At this planned level, the company expects to use 24,400 standard hours of direct labor. Overhead is allocated to products using a predetermined standard rate of 0.610 direct labor hour per unit. At the 80% capacity level, the total budgeted cost includes $53,680 fixed overhead cost and $273,280 variable overhead cost. In the current month, the company incurred $320,000 actual overhead and 21,400 actual...
James Corp. applies overhead on the basis of direct labor hours. For the month of May, the company planned production of 10,000 units (80% of its production capacity of 12,500 units) and prepared the following overhead budget: Operating Levels Overhead Budget 80% Production in units 10,000 Standard direct labor hours 25,000 Budgeted overhead Variable overhead costs Indirect materials $ 18,000 Indirect labor 25,000 Power 5,000 Maintenance 2,000 Total variable costs 50,000 Fixed overhead costs Rent of factory building 18,000 Depreciation—Machinery...
World Company expects to operate at 80% of its productive capacity of 72,500 units per month. At this planned level, the company expects to use 31,900 standard hours of direct labor. Overhead is allocated to products using a predetermined standard rate of 0.550 direct labor hour per unit. At the 80% capacity level, the total budgeted cost includes $79,750 fixed overhead cost and $414,700 variable overhead cost. In the current month, the company incurred $488,000 actual overhead and 28,900 actual...
World Company expects to operate at 80% of its productive capacity of 68,750 units per month. At this planned level, the company expects to use 31,900 standard hours of direct labor. Overhead is allocated to products using a predetermined standard rate of 0.580 direct labor hour per unit. At the 80% capacity level, the total budgeted cost includes $70,180 fixed overhead cost and $405,130 variable overhead cost. In the current month, the company incurred $473,000 actual overhead and 28,900 actual...