Question
answer them ASAP please
StthacS Practice Question 24 In order to achieve the most accurate costing, the cost driver chosen for a given activity must
What is the primary benefit of activity-based costing? The cost of implementation O Arbitrary allocations of overhead costs O
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer

24.

Option B is correct as it requires High Degree of Correlation.

25.

Option B is correct, Arbitrary allocation of Overhead Cost

Dear Student, if u have any query please feel free to reach me.

Add a comment
Know the answer?
Add Answer to:
answer them ASAP please StthacS Practice Question 24 In order to achieve the most accurate costing,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Practice Question 13 Ford Company has two process departments, cutting and shaping, that produce products. At...

    Practice Question 13 Ford Company has two process departments, cutting and shaping, that produce products. At what point can direct materials be added to product costs? At the point the materials are acquired from the supplier. At the point the products are completed and transferred to Finished Goods. At the point production begins in the cutting department. At the point the materials are used in production during either the cutting or shaping Departments. Qnen Show Work Click if you would...

  • READ THIS BEFORE ATTEMPTING TO ANSWER. IF YOU ARE NOT ABLE TO ANSWER THEM ALL, PLEASE...

    READ THIS BEFORE ATTEMPTING TO ANSWER. IF YOU ARE NOT ABLE TO ANSWER THEM ALL, PLEASE SKIP!!! TRUE OR FALSE STATEMENTS Equivalent units of production is the sum of units completed and transferred out plus equivalent units of beginning work in process. When equivalent units of production are different for materials and conversion costs, unit costs are computed for materials, conversion, and total manufacturing. In continuous process manufacturing, generally once the production begins, it continues until the finished product emerges....

  • Question 33 2 pts The first step for implementing activity-based costing is Calculate activity rates Assign...

    Question 33 2 pts The first step for implementing activity-based costing is Calculate activity rates Assign overhead costs to activity cost pools Define activities, activity cost pools, and activity measures Assign overhead costs to cost objects Question 34 2 pts The differences between ABC and Traditional Product Costs include the following except: Traditional cost systems create a more favorable net operating income (loss) Traditional cost systems allocate manufacturing overhead costs using a volume-related allocation base Traditional cost systems allocate all...

  • (Ch4) The first step in activity-based costing is to Select one: O a. assign manufacturing overhead...

    (Ch4) The first step in activity-based costing is to Select one: O a. assign manufacturing overhead costs for each activity cost pool to products. O b. identify and classify the major activities involved in the manufacture of specific products. O c. calculate the activity-based overhead rate per cost driver. O d. identify the cost driver that has a strong correlation to the activity cost pool. (Ch4) Activity-based costing Select one: O a. uses direct labor as its primary cost driver....

  • Practice Question 03 Which one of the following statements is correct? Process costing systems use periodic...

    Practice Question 03 Which one of the following statements is correct? Process costing systems use periodic inventory systems. Process costing systems assign costs to departments or processes for a time period. Companies that produce many different products or services are more likely to use process costing systems. O Production is continuous when a job-order costing is used to ensure that adequate quantities are on hand. Click if you would like to Show Work for this question: Open Show Work Practice...

  • please help with both parts asap! Thanks This is a cost allocation problem for a merchandising...

    please help with both parts asap! Thanks This is a cost allocation problem for a merchandising firm. Since merchandising firms do not have overhead, you must allocate "operating costs" instead of "overhead costs." Also, the allocations in this problem are to a department, not to a product or job. Nonetheless, the allocation process is the same. Just follow the three steps used in the lectures: 1. Read the problem and question carefully to determine the cost driver. 2. Compute the...

  • Do It! Review 4-1 Indicate whether the following statements are true or false. (a) The reasoning...

    Do It! Review 4-1 Indicate whether the following statements are true or false. (a) The reasoning behind ABC cost allocation is that products consume activities and activities consume resources. (b) Activity-based costing is an approach for allocating direct labor to products. (c) In today's increasingly automated environment, direct labor is never an appropriate basis for allocating costs to products. (d) A cost driver is any factor or activity that has a direct cause-effect relationship with resources consumed. (e) Activity-based costing...

  • answer them ASAP please Practice Question 02 Which of the following companies would most likely use process costing...

    answer them ASAP please Practice Question 02 Which of the following companies would most likely use process costing for the product or service it produces? Jason's Printers - wedding invitations. O Friskies Cat Food - cans of tuna flavored food. Dr. Spillert, Plastic Surgery - tummy tucks and liposuction Ernst & Young, CPAS, LLP - audit clients. Practice Question 13 Ford Company has two process departments, cutting and shaping, that produce products. At what point can direct materials be added...

  • The job costing system at Shelby's Custom Framing has five indirect cost pools (purchasing, material handling,...

    The job costing system at Shelby's Custom Framing has five indirect cost pools (purchasing, material handling, machine maintenance, product inspection, and packaging). The company is in the process of bidding on two jobs; Job 215, an order of 16 intricate personalized frames, and Job 325, an order of 4 standard personalized frames. The controller wants you to compare overhead alocated under the current simple job-costing system and a newly designed activity-based job-costing system. Total budgeted costs in each indirect cost...

  • answer them ASAP please SES Practice Question 16 Marco Company has two processing departments and uses...

    answer them ASAP please SES Practice Question 16 Marco Company has two processing departments and uses a process costing system, which account is debited when the company assigns factory labor costs to production? Manufacturing Overhead is debited. Work in Process is debited. Factory Labor is debited. Cost of Goods Sold is debited. Insight Box Concept Check 5 What might explain why so many companies say that ideally they would use ABC, but they haven't adopted it yet? An ABC system...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT