Question

Managerial Accounting: Creating Value in a Dynamic Business Environment (11th Edition) Ch. 5 prob 52 parts...

Managerial Accounting: Creating Value in a Dynamic Business Environment (11th Edition)

Ch. 5 prob 52 parts 1, 2, and 3

I think I understand what to do, but I'd like to check my answers to be sure.

My answers are bold.

1) Activity cost pool Budgeted Overhead Cost Cost driver Budgeted Level Rate Needed per 1,000 boxes Activity Cost Pool
Machine setups $          250,000 No. of setups 125 $    2,000 5 $                          10,000
Material handeling $            75,000 Weight of material 37500 $             2 10000 $                          20,000
Hazardous waste control $            25,000 Weight of haz chem 5000 $             5 2000 $                          10,000
Quality control $            75,000 No. of inspections 1000 $          75 10 $                                750
Other $          200,000 Machine hours 20000 $          10 500 $                            5,000
Total $          625,000 $                          45,750
2) Activity Cost pool $            45,750
No. of boxes 1000
Overhead cost per unit $               45.75
3) Budgeted Overhead $          625,000
Machine hours 20000
Predetermined overhead rate (per hr.) $               31.25
Total overhead for job $            45,750
Machine hours needed for job 500
Adjusted predetermined rate (per hr.) $               91.50
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Hi, Friend...

Hope you are also doing well. if you have any doubts, please do mention in the comment section. I'll definitely respond in early possible time.

Ans:

Yes, your answering approach is absolutely correct. For being on the safer side, please upload the question. So, I can reconcile the answer. Otherwise, everything is perfect.

Thanks, Dear... Have a Wonderful Day.

Add a comment
Know the answer?
Add Answer to:
Managerial Accounting: Creating Value in a Dynamic Business Environment (11th Edition) Ch. 5 prob 52 parts...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost drivers....

    The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost drivers. Activity Cost Pool Budgeted Overhead Cost Cost Driver Budgeted Level for Cost Driver Pool Rate Machine setups $ 250,000 Number of setups 125 $ 2,000 per setup Material handling 75,000 Weight of raw material 37,500 lb. $ 2 per pound Hazardous waste control 25,000 Weight of hazardous chemicals used 5,000 lb. $ 5 per pound Quality control 75,000 Number of inspections 1,000 $...

  • The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost...

    The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost drivers. Activity Cost Pool Budgeted Overhead Cost Cost Driver Budgeted Level for Cost Driver Pool Rate Machine setups $ 300,000 Number of setups 100 $ 3,000 per setup Material handling 90,000 Weight of raw material 30,000 lb. $ 3 per pound Hazardous waste control 30,000 Weight of hazardous chemicals used 6,000 lb. $ 5 per pound Quality control 150,000 Number of inspections 2,000 $...

  • Problem 2 The controller for the XZY Company has established the following overhead pools and cost...

    Problem 2 The controller for the XZY Company has established the following overhead pools and cost drivers: Overhead Cost Pool Budgeted Overhead Cost Cost Driver Machine setups $100,000 Number of setups Material Handling $50,000 Units of Raw Material Quality control inspections $37,500 Number of Inspections Other overhead costs $100,000 Machine Hours Overhead Cost Pool Budgeted Level for Cost Driver Pool Overhead Rate Machine setups 100 setups $1,000 per setup Material Handling 50,000 units $1 per unit Quality control inspections 1,000...

  • The accountant for Snappy Photograph Enterprise (SPE) has estimated the following activity cost pools and activity...

    The accountant for Snappy Photograph Enterprise (SPE) has estimated the following activity cost pools and activity drivers for the coming year: Activity Budgeted overhead Activity driver Activity level cost (RM) Machine set ups 300,000 No. of set ups 100 set ups Material handling 150,000 Weight of raw 50,000 kg material Hazardous waste 75,000 Weight of hazardous 10,000 kg control chemicals used Quality control No. of inspection 1,000 inspections Other overhead cost 300,000 Machine hours 20,000 hours Total 937,000 112,500 An...

  • 3. The controller for Mitchell Supply Company has established the following overhead cost pools and cost...

    3. The controller for Mitchell Supply Company has established the following overhead cost pools and cost drivers: Overhead Cost Pool Machine setup Material handling Budgeted Overhead Cost $150,000 52,500 Cost Driver Number of setups Units of raw material Number of inspections Machine hours Quality control inspectiorn Other overhead costs Total 37,500 90,000 330000 Requirements of Order no.610 5 setup 10,000 per unit Budgeted Level For Cost Driver Overhead Cost Pool Machine setup Material handling Quality control Other overhead 100 setups...

  • The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost...

    The controller for Tulsa Medical Supply Company has established the following activity cost pools and cost drivers. Activity cost Pool Rachine setups Material handling Hazardous waste control Quality control Other overhead costs Budgeted Overhead Cost Cost Driver $250,00 Number of setups 75,eee weight of raw material 25,00 Weight of hazardous chemicals used 75, ce Number of inspections 200,00 Machine hours $625. Budgeted Level for Cost Driver 125 37.500 lb. 5.000 lb. 1.000 20.000 5 Pool Rate $2,000 per setup 2...

  • Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on...

    Lupo Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on machine-hours. The company based its predetermined overhead rate for the current year on the following data: Total machine-hours 30,000 Total fixed manufacturing overhead cost $ 252,000 Variable manufacturing overhead per machine-hour $ 2.10 Recently, Job T687 was completed with the following characteristics: Number of units in the job 10 Total machine-hours 30 Direct materials $ 675 Direct labor cost $ 1,050 The estimated total...

  • XYZ 4 You have been recently hired by this company to review the costing of chemicals and reaize that maybe a predetermined overhead rate does not give an accurate cost picture 5 You remember di...

    XYZ 4 You have been recently hired by this company to review the costing of chemicals and reaize that maybe a predetermined overhead rate does not give an accurate cost picture 5 You remember discussing overhead cost issues in MBA641 and want to implement ABC, so you have done some research and come up with the following activity cost pools and cost drivers Budgeted Overhead CostCost driver Budgeted Level Activity for cost DriverPool Rate 30,000 Activity cost Pool 30,000 of...

  • Thomlin Company forecasts that total overhead for the current year will be $11,070,000 with 175,000 total...

    Thomlin Company forecasts that total overhead for the current year will be $11,070,000 with 175,000 total machine hours. Year to date, the actual overhead is $7,860,000 and the actual machine hours are 81,000 hours. The predetermined overhead rate based on machine hours is Round the factory overhead rate to the nearest dollar before multiplying by the number of hours. a. $45 per machine hour b. $63 per machine hour c. $137 per machine hour d. $97 per machine hour -----------------...

  • Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components...

    Shaker Stairs Co. designs and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, hand rails) permit installation of stairways of varying lengths and widths. All are of white oak wood. Budgeted manufacturing overhead costs for the year 2020 are as follows. Overhead Cost Pools Purchasing Handling materials Production (cutting, milling, finishing) Setting up machines Inspecting Inventory control (raw materials and finished goods) Utilities Total budgeted overhead costs Amount $75,000 82,000 220,000 100,000 120,000 126,000...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT