Ratios, Activity Rates, <xercise 5-49 Product-Costing Accuracy, Consumption Ratios, Activih Activity Costing ers: infantry and spe...
Tristar Manufacturing produces two types of battery-operated toy soldiers: infantry and special forces. The soldiers are produced by using one continuous process. Four activities have been identified: machining, setups, receiving, and packing. Resource drivers have been used to assign costs to each activity. The overhead activities, their costs, and the other related data are as follows: Product Machine Hours Setups Receiving Orders Packing Orders Infantry 19,000 330 810 1,680 Special Forces 19,000 110 YU 840 Costs $68,400 $26,664 $16,020 $30,744...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 130,000 390,000 — Prime costs $9,880,000 $42,120,000 $52,000,000 Machine hours 130,000 650,000 780,000 Engineering hours 500 4,500 5,000 Receiving orders 500 1,500 2,000 Inspection hours 1,000 2,000 3,000 Overhead costs: Machining $8,580,000 Engineering 3,000,000 Receiving 440,000 Inspecting products 360,000 Required: 1. Calculate the...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 90,000 270,000 — Prime costs $6,480,000 $30,240,000 $36,720,000 Machine hours 90,000 450,000 540,000 Engineering hours 400 3,600 4,000 Receiving orders 500 1,500 2,000 Inspection hours ...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Advanced Total Basic 150,000 $12,900,000 450,000 $51,300,000 $64,200,000 150,000 750,000 900,000 Units produced Prime costs Machine hours Engineering hours Receiving orders Inspection hours 300 2,700 3,000 400 1,200 1,600 900 1,800 2,700 $7,200,000 Overhead costs: Machining Engineering Receiving Inspecting products 1,290,000 624,000 405,000 Required: per machine hour 1....
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 140,000 420,000 ------ Prime costs $9,800,000 $44,520,000 $54,320,000 Machine hours 140,000 700,000 840,000 Engineering hours 400 3,600 4,000 Receiving orders 400 1,200 1,600 Inspection hours ...
eBook Calculator Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 150,000 450,000 Prime costs $12,600,000 $45,000,000 $57,600,000 900,000 Machine hours 150,000 750,000 500 4,500 5,000 Engineering hours Receiving orders Inspection hours 200 600 800 800 1,600 2,400 Overhead costs: Machining Engineering $9,000,000 2,100,000 320,000 Receiving Inspecting products 480,000 Required: 1. Calculate...
eBook Calculator Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 300,000 100,000 $8,000,000 Prime costs $30,000,000 $38,000,000 Machine hours 100,000 500,000 600,000 Engineering hours 400 3,600 4,000 Receiving orders 400 1,200 1,600 Inspection hours 800 1,600 2,400 Overhead costs: Machining Engineering Receiving Inspecting products $6,000,000 2,000,000 560,000 360,000 Required: 1. Calculate...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving and inspection Information on these activities and their drivers is given below. Basic Advanced Total Units produced 150,000 450,000 Prime costs $10,500,000 $45,000,000 $55,500,000 Machine hours 150,000 750,000 900,000 Engineering hours 200 1,800 2,000 Receiving orders 300 900 Inspection hours 900 1,800 2,700 1.200 $9,900,000 Overhead costs: Machining Engineering Receiving Inspecting products 980,000 300,000 513,000 2. Calculate the unit costs...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 140,000 420,000 Prime costs $11,760,000 $50,400,000 $62,160,000 Machine hours 140,000 700,000 840,000 Engineering hours 3,600 4,000 Receiving orders 300 1,200 Inspection hours 1,800 2,700 400 900 900 Overhead costs: Machining $9,240,000 2,240,000 Engineering Receiving 240,000 Inspecting products 297,000 Required: 1. Calculate the four...
Activity-Based Product Costing Roberts Company produces two weed eaters: basic and advanced. The company has four activities: machining, engineering, receiving, and inspection. Information on these activities and their drivers is given below. Basic Advanced Total Units produced 150,000 450,000 $46,800,000 Prime costs $10,800,000 Machine hours 150,000 750,000 $57,600,000 900,000 2,000 200 1,800 Engineering hours Receiving orders Inspection hours 300 900 1,200 800 1,600 2,400 Overhead costs: Machining Engineering $9,000,000 860,000 468,000 Receiving Inspecting products 480,000 Required: 2. Calculate the unit...