Production Cost per Bolt for Deluxe:
Particular | Amount | Amount |
Waving: Material | 800000 | |
Labour | 80000 | |
Dying: Material | 18000 | |
Labour | 55000 | |
Mfr Overhead | 526500 | |
Total Exp | 1479500 | |
Production Cost per Bolt= 1479500/2000= 739.75
Ok The Fabric Plant produces three types of fabric: Standard, Deluxe and Luxury. Each fabric is...
Remington Textiles has a mill that produces three types of fabrics on a make-to-order basis. The mill operates on a 24/7 basis. The key decision facing the plant manager is about the type of loom needed to process each fabric during the coming 12 weeks to meet demands for the three fabrics and not exceed the capacity of the looms in the mill. Two types of looms are used: Jaquard and Northrop. Jaquard looms can be used to make all...
During May, Joliet Fabrics Corporation manufactured 560 units of a special multilayer fabric with the trade name Stylex. The following information from the Stylex production department also pertains to May. Direct material purchased: 18,600 yards at $1.44 per yard Direct material used: 10,100 yards at $1.44 per yard Direct labor: 2,700 hours at $9.21 per hour $ 26,784 14,544 24,867 The standard prime costs for one unit of Stylex are as follows: Direct material: 20 yards at $1.41 per yard...
During May, Joliet Fabrics Corporation manufactured 570 units of a special multilayer fabric with the trade name Stylex. The following information from the Stylex production department also pertains to May. Direct material purchased: 18,700 yards at $1.45 per yard Direct material used: 10,200 yards at $1.45 per yard Direct labor: 2,800 hours at $9.22 per hour $ 27,115 14,790 25,816 The standard prime costs for one unit of Stylex are as follows: Direct material: 20 yards at $1.42 per yard...
During May, Joliet Fabrics Corporation manufactured 600 units of a special multilayer fabric with the trade name Stylex. The following information from the Stylex production department also pertains to May. Direct material purchased: 19,000 yards at $1.48 per yard Direct material used: 10,500 yards at $1.48 per yard Direct labor: 3,100 hours at $9.25 per hour $ 28,120 15,540 28,675 The standard prime costs for one unit of Stylex are as follows Direct material: 20 yards at $1.45 per yard...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 5.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 440 backpacks were...
Variance Computations and Explanations Outdoor Company manufactures camping tents from a lightweight synthetic fabric. Each tent has a standard materials cost of $20, consisting of 4 yards of fabric at $5 per yard. The standards call for 2 hours of assembly at $11 per hour. The following data were recorded for October, the first month of operations: Fabric purchased 9,000 yards * $4.70 per yard Fabric used in production of 1,600 tents 7,000 yards Direct labor used 3,300 hours *...
Question Help A company produces regular and deluxe ice cream at three plants. Per hour of operation, Plant A produces 20 gallons of regular ice cream and 10 gallons of deluxe ice cream. Plant H produces 10 gallons of regular ice cream and 20 gallons of deluxe ice cream, and Plant M produces 20 gallons of regular and 20 gallons of deluxe. It costs $70 per hour to operate Plant A, $78 per hour to operate Plant H, and $110...
Flandro Company uses a standard cost system and sets its predetermined overhead rate on the basis of direct labor-hours. The following data are taken from the company’s planning budget for the current year: Denominator activity (direct labor-hours) 16,000 Variable manufacturing overhead cost $ 55,200 Fixed manufacturing overhead cost $ 146,400 The standard cost card for the company’s only product is given below: Inputs (1) Standard Quantity or Hours (2) Standard Price or Rate Standard Cost (1) × (2) Direct materials...
During May, Joliet Fabrics Corporation manufactured 650 units of a special multilayer fabric with the trade name Stylex. The following information from the Stylex production department also pertains to May. Direct material purchased: 19,500 yards at $1.53 per yard $ 29,835 Direct material used: 11,000 yards at $1.53 per yard 16,830 Direct labor: 3,600 hours at $9.30 per hour 33,480 The standard prime costs for one unit of Stylex are as follows: Direct material: 20 yards at $1.50 per yard...
Deluxe, Inc. produced 1,000 units of the company's product in 2018. The standard quantity of direct materials was three yards of cloth per unit at a standard cost of $1.10 per yard. The accounting records showed that 2,800 yards of cloth were used and the company paid $1.15 per yard. Standard time was two direct labor hours per unit at a standard rate of $11.25 perc as two direct labor hours per unit at a standard rate of $11.25 per...