5. (20 pts) A simulation model of a job shop was developed to investigate different scheduling...
An industrial engineer created a simulation model of a workshop, to examine the impact of different scheduling rules. He observed the behavior of the system with the currently used scheduling rule to test the validity of the model. According to the records kept in previous years, the average number of jobs released from the system in one day is 22.5. The industrial engineer made 7 replications (repeats) for 30 days and found the average output amount as a result of...