Please give positive ratings so I can keep answering. It would help me a lot. Please comment if you have any query. Thanks! |
Piccolo Inc. | |||
It is mentioned that overhead rate are calculated on the basis of direct labor hours: | |||
Answer a | Note | ||
Budgeted Variable overhead | 34,200.00 | A | |
Budgeted Production units | 22,800.00 | B | |
Variable overhead per unit | 1.50 | C=A/B | |
Actual Production units | 24,400.00 | D | |
Variable overhead per unit | 1.50 | See C | |
Flexed Variable overhead Budget | 36,600.00 | E=D*C | |
Flexed Fixed overhead Budget | 40,470.00 | ||
Note: Fixed overhead does not change with units so it will be same as budgeted for any level of units. | |||
Answer b | |||
Budgeted Production units | 22,800.00 | See A | |
Standard Direct Labor Hours | 5,700.00 | F | |
Standard Direct Labor Hours per unit | 0.25 | G=F/A | |
Actual Production units | 24,400.00 | See D | |
Standard Direct Labor Hours per unit | 0.25 | See G | |
Standard Direct Labor Hours for Actual Production units | 6,100.00 | H=D*G | |
Actual Direct Labor Hours | 6,900.00 | I | |
Direct Labor Efficiency Variance | 800.00 | Unfavorable | J=I-H |
Answer c | Variable | Fixed | |
Budgeted costs | 34,200.00 | 40,470.00 | K |
Standard Direct Labor Hours | 5,700.00 | 5,700.00 | See F |
Calculation of predetermined overhead rate | 6.00 | 7.10 | L=K/F |
Answer d | Variable | Fixed | |
Standard Direct Labor Hours for Actual Production units | 6,100.00 | 6,100.00 | See H |
Predetermined overhead rate | 6.00 | 7.10 | See L |
Overhead applied | 36,600.00 | 43,310.00 | M=H*L |
Answer e | |||
Actual Fixed cost | 42,500.00 | N | |
Standard Fixed cost | 40,470.00 | See K | |
Fixed Overhead Budget Variance | 2,030.00 | Unfavorable | O= N-K |
Fixed Overhead Volume Variance | |||
Standard Fixed cost | 40,470.00 | See K | |
Overhead applied | 43,310.00 | See M | |
Fixed Overhead Volume Variance | 2,840.00 | Favorable | P=M-K |
Answer F | |||
Actual Fixed cost | 42,500.00 | Q | |
Overhead applied | 43,310.00 | See M | |
Overhead Over applied | 810.00 | R=M-Q | |
Presented here are the original overhead budget and the actual costs incurred during April for Piccole,...
Crystal Glassware Company has the following standards and flexible-budget data. Standard variable-overhead rate Standard quantity of direct labor Budgeted fixed overhead Budgeted output $ 19 per direct - labor hour 2.2 hours per unit of output $400, eee 30,units Actual results for April are as follows: Actual output Actual variable overhead Actual fixed overhead Actual direct labor 19,808 units $1,025, 150 $ 341,800 50, 500 hours Required: Use the following diagrams below (similar to Exhibit 11-6 and Exhibit 11-8 to...
Acme Company's production budget for August is 19,000 units and includes the following component unit costs: direct materials, $8.00; direct labor, $11.60; variable overhead, $5.60. Budgeted fixed overhead is $47,000. Actual production in August was 20,445 units. Actual unit component costs incurred during August include direct materials, $9.80; direct labor, $10.00; variable overhead, $6.40. Actual fixed overhead was $50,000. Required: Prepare a performance report, including each cost component. (Indicate the effect of each variance by selecting "F" for favorable, "U"...
Crystal Glassware Company has the following standards and flexible-budget data. Standard variable-overhead rate Standard quantity of direct labor Budgeted fixed overhead Budgeted output $ 6.00 per direct-labor hour 2 hours per unit of output $144,000 24,000 units Actual results for April are as follows: 1 + Actual output Actual variable overhead Actual fixed overhead Actual direct labor 17,000 units $306,000 $141,000 50,000 hours Required: Use the variance formulas to compute the following variances. (Indicate the effect of each variance by...
Acme Company's production budget for August is 18,000 units and includes the following component unit costs: direct materials, $8.00; direct labor, $11.20; variable overhead, $6.00. Budgeted fixed overhead is $44,000. Actual production in August was 18,400 units. Actual unit component costs incurred during August include direct materials, $9.40; direct labor, $10.00; variable overhead, $6.60. Actual fixed overhead was $46,700 Required: Prepare a performance report, including each cost component. (Indicate the effect of each variance by selecting "F" for favorable, "U"...
Acme Company’s production budget for August is 18,300 units and includes the following component unit costs: direct materials, $6.30; direct labor, $10.80; variable overhead, $6.50. Budgeted fixed overhead is $40,000. Actual production in August was 19,110 units. Actual unit component costs incurred during August include direct materials, $9.00; direct labor, $10.20; variable overhead, $7.60. Actual fixed overhead was $42,300. Required: Prepare a performance report, including each cost component. (Indicate the effect of each variance by selecting "F" for favorable, "U"...
Acme Company's production budget for August is 18,000 units and includes the following component unit costs: direct materials. 58.0 direct labor, 510.5, variable overhead, $6.4. Budgeted fixed overhead is $37,000. Actual production in August was 19.950 units. Actual unit component costs incurred during August include direct materials, $8.70; direct labor, $9.90: variable overhead, 5730. Actual fixed overhead was $39.000. The standard variable overhead rate per unit consists of $6.4 per machine hour and each unit is allowed a standard of...
Factory Overhead Cost Variances Blumen Textiles Corporation began April with a budget for 23,000 hours of production in the Weaving Department. The department has a full capacity of 31,000 hours under normal business conditions. The budgeted overhead at the planned volumes at the beginning of April was as follows: Variable overhead $80,500 Fixed overhead 55,800 Total $136,300 The actual factory overhead was $137,900 for April. The actual fixed factory overhead was as budgeted. During April, the Weaving Department had standard...
The following information relates to Tallman, Inc.'s overhead costs for the month: (Click the icon to view the information.) Requirements 1. Compute the overhead variances for the month: variable overhead cost variance, variable overhead efficiency variance, fixed overhead cost variance, and fixed overhead volume variance. 2. Explain why the variances are favorable or unfavorable. Requirement 1. Compute the overhead variances for the month: variable overhead cost variance, variable overhead efficiency variance, fixed overhead cost variance, and fixed overhead volume variance....
Lane Company manufactures a single product that requires a great deal of hand labor. Overhead cost is applied on the basis of standard direct labor-hours. The budgeted variable manufacturing overhead is $5.60 per direct labor-hour and the budgeted fixed manufacturing overhead is $2,880,000 per year. The standard quantity of materials is 4 pounds per unit and the standard cost is $12.00 per pound. The standard direct labor-hours per unit is 1.5 hours and the standard labor rate is $13.80 per...
Lane Company manufactures a single product that requires a great deal of hand labor. Overhead cost is applied on the basis of standard direct labor-hours. The budgeted variable manufacturing overhead is $5.00 per direct labor-hour and the budgeted fixed manufacturing overhead is $2,295,000 per year. The standard quantity of materials is 4 pounds per unit and the standard cost is $10.50 per pound. The standard direct labor-hours per unit is 1.5 hours and the standard labor rate is $13.50 per...