Question

1. You are planning to create a portfolio from Lockheed Martin Corp. and Intel Corp., but first need to determine the required (expected) return for each stock. After completing a bit of research you determine that the 10 Year U.S. Treasury yield is 3% and the expected return on the S&P 500 is 9%. You calculated the betas and found a beta for Lockheed of .8 and 1.3 for Intel. Calculate the required/expected returns for Lockheed and Intel using the SML. 2. Lockheed has a standard deviation of 7% and Intel has a standard deviation of 1 1%. The correlation (p) between Lockheed and Intel is 0 a. Complete the following table and develop a graph of the investment opportunity (feasible) set of these two assets. Show your work and make a precise (to scale) graph. Note: If using Excel to graph, the scale on both axes must be the same or the graph will be incorrect. % of Portfolio In Lockheed 100 75 50 25 % of Portfolio in Intel Expected Return Portfolio Standard on Portfolico Deviation 25 50 75 100 b. Now add to the graph the capital market line (CML). No calculations are required. c. Explain the difference between the CML and the SML (security market line) i. CML uses standard deviation to measure risk, while SML uses the beta. d. Draw a set of indifference curves somewhere to the right of the tangency point between the CML and the curve of attainable portfolios. There should be indifference curves both above and below CML line and curve. Explain how you, as a rational investor, will choose a utility maximizing portfolio i. In the absence of capital markets (i.e. no CML) ii. With capital markets (includes the opportunity to borrow and lend at the risk free rate)

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
1. You are planning to create a portfolio from Lockheed Martin Corp. and Intel Corp., but...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • 2. Lockheed has a standard deviation of 13% and Intel has a standard deviation of 9%....

    2. Lockheed has a standard deviation of 13% and Intel has a standard deviation of 9%. The correlation (p) between Lockheed and Intel is 0. a. Complete the following table and develop a graph of the investment opportunity (feasible) set of these two assets. Show your work and make a precise (to scale) graph. Note: If using Excel to graph, the scale on both axes must be the same or the graph will be incorrect. 75 % of Portfolio %...

  • In the following table, indicate whether each statement refers to the Capital Market Line (CML) or...

    In the following table, indicate whether each statement refers to the Capital Market Line (CML) or to the Security Market Line (SML). Capital Market Line (CML) Security Market Line (SML) Statement This line defines the linear relationship between the expected return on an efficient portfolio and its standard deviation The slope of this line, th risk. - TRP/OM, reflects the investors' aggregated, or market-level, expected premium for This line describes the return on an individual security as the sum of...

  • 5. The Capital Market Line and the Security Market Line Aa Aa E In the following...

    5. The Capital Market Line and the Security Market Line Aa Aa E In the following table, indicate whether each statement refers to the Capital Market Line (CML) or to the Security Market Line (SML). Capital Market Line (CML) Security Market Line (SML) Statement This line defines the linear relationship between the expected return on an efficient portfolio and its standard deviation. The slope of this line, TM - PRF) / OM, reflects the investors' aggregated, or market-level, expected premium...

  • 5. The Capital Market Line and the Security Market Line In the following table, check whether...

    5. The Capital Market Line and the Security Market Line In the following table, check whether each statement refers to the Capital Market Line (CML) or to the Security Market Line (SML). Statement Capital Market Line (CML) Security Market Line (SML) This line defines the linear relationship between the expected return on an efficient portfolio and its standard deviation. The slope of this line, (r̂Mr̂M – rRFrRF)/σMσM, reflects the investors’ aggregated, or market-level, expected premium for risk. This line describes...

  • 4. Investor equilibrium The following graph shows the set of portfolio opportunities for a multiasset case....

    4. Investor equilibrium The following graph shows the set of portfolio opportunities for a multiasset case. The point Pre corresponds to a risk-free asset, the red curve BME is the efficient frontier, the shaded area under the efficient frontier represents the feasible set of portfolios of risky assets, and the yellow curves 11 and 12 are indifference curves for a particular investor. EXPECTED RATE OF RETURN (Percent) 10 RISK (Portfolio's standard deviation) Point A, where the line PRF MZ is...

  • A. Capital Allocation Lines The optimal CAL is found as the ray from the risk free...

    A. Capital Allocation Lines The optimal CAL is found as the ray from the risk free rate that is tangent to the _____________ and is called the ________________. efficient frontier; CML minimum variance portfolio; high range CAL indifference curve; SML lower half of the investment opportunity set; CAPM B. Capital Allocation Portfolio 1 has a standard deviation of 35% and a Sharpe ratio of 0.48. Portfolio 2 has a standard deviation of 29% and a Sharpe ratio of 0.44. Portfolio...

  • 9. The Capital Asset Pricing Model and the security market line Keith holds a portfolio that...

    9. The Capital Asset Pricing Model and the security market line Keith holds a portfolio that is invested equally in three stocks (WD = WA = WI = 1/3). Each stock is described in the following table: Stock Beta Standard Deviation Expected Return DET 0.7 25% 8.0% AIL 1.0 38% 10.0% INO 1.6 13.5% 34% An analyst has used market- and firm-specific information to make expected return estimates for each stock. The analyst's expected return estimates may or may not...

  • The efficient set of portfolios The following graph represents the relationship between the efficient set of...

    The efficient set of portfolios The following graph represents the relationship between the efficient set of possible portfolios and various investors. Assuming that the black line represents the efficient frontier, which of the following best describes portfolios that lie to the left of this line? ___Indifferent ___Unattainable ___Efficient ___Inefficient On the preceding graph, the green and blue lines represent the indifference curves of two investors, investor Green and investor Blue. Which of these investors is more risk averse? ___Not enough...

  • 7. The Capital Asset Pricing Model and the security market line Wilson holds a portfolio that...

    7. The Capital Asset Pricing Model and the security market line Wilson holds a portfolio that invests equally in three stocks (WA = W3 = Wc = 1/3). Each stock is described in the following table: Stock Beta Standard Deviation Expected Return A 0.5 23% 7.5% B 1.0 38% 12.0% с 2.0 45% 14.0% An analyst has used market- and firm-specific information to generate expected return estimates for each stock. The analyst's expected return estimates may or may not equal...

  • Wilson holds a portfolio that invests equally in three stocks (WAWBWc following table: 1/3). Each...

    Wilson holds a portfolio that invests equally in three stocks (WAWBWc following table: 1/3). Each stock is described in the Stock Beta Standard Deviation Expected Return A 0.5 23% 38% 45% 7.5% 12.0% 14.0% C 2.0 An analyst has used market- and firm-specific information to generate expected return estimates for each stock. The analyst's expected return estimates may or may not equal the stocks' required returns. You've also determined that the risk-free rate [Rr] is 4%, and the market risk...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT