Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data.
  

Rounded Edge Squared Edge Total
Direct materials $ 9,600 $ 21,400 $ 31,000
Direct labor 6,000 11,800 17,800
Overhead (300% of direct labor cost) 18,000 35,400 53,400
Total cost $ 33,600 $ 68,600 $ 102,200
Quantity produced 10,400 ft. 14,200 ft.
Average cost per ft. (rounded) $ 3.23 $ 4.83

  
Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $53,400 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information.

Overhead Cost Category
(Activity Cost Pool)
Cost
Supervision $ 2,136
Depreciation of machinery 28,520
Assembly line preparation 22,744
Total overhead $ 53,400

  
She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.)

Usage
Overhead Cost Category
(Activity Cost Pool)
Driver Rounded Edge Squared Edge Total
Supervision Direct labor cost ($) $ 6,000 $ 11,800 $ 17,800
Depreciation of machinery Machine hours 200 hours 700 hours 900 hours
Assembly line preparation Setups (number) 31 times 94 times 125 times
1. Assign these three overhead cost pools to each of the two products using ABC.
Activity Overhead Cost Activity Drivers Activity Rate
Supervision Direct labor cost %
Depreciation of machinery Machine hours
Assembly line preparation Setups
Rounded edge Activity rate Activity driver incurred Overhead assigned
Supervision % 0
Depreciation of machinery 0
Assembly line preparation 0
Squared edge Activity rate Activity driver incurred Overhead assigned
Components
Supervision % 0
Depreciation of machinery 0
Assembly line preparation 0
2. Determine average cost per foot for each of the two products using ABC.
Rounded edge Squared edge
0 0
Add a comment Improve this question Transcribed image text
Answer #1
1. Assign these three overhead cost pools to each of the two products using ABC.
Activity Overhead Cost Divided by Activity Drivers Activity Rate
Supervision 2,136 /   $        17,800 Direct labor cost 12.00%
Depreciation of machinery 28,520 /   900 Machine hours 31.69
Assembly line preparation 22,744 /   125 Setups 181.95
Rounded edge Activity rate Multiply: Activity driver incurred Overhead assigned
Supervision 12.00% x $        6,000 Direct labor cost $              720
Depreciation of machinery         31.69 x                200 Machine hours $          6,338
Assembly line preparation      181.95 x                  31 Setups $          5,640
Total overhead cost assigned to Rounded edge $        12,698
Squared edge Activity rate Multiply: Activity driver incurred Overhead assigned
Supervision 12.00% x $     11,800 Direct labor cost $          1,416
Depreciation of machinery         31.69 x                700 Machine hours $        22,183
Assembly line preparation      181.95 x                  94 Setups $        17,103
Total overhead cost assigned to Rounded edge $        40,702
2. Determine average cost per foot for each of the two products using ABC.
Rounded edge Squared edge
Direct materials $          9,600 $     21,400
Direct labor $          6,000 $     11,800
Overhead assigned $        12,698 $     40,702
Total cost $        28,298 $     73,902
Divided by: Quantity produced            10,400          14,200
Average cost per foot (rounded) $             2.72 $          5.20
Add a comment
Know the answer?
Add Answer to:
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge Total Direct materials $ 9,300 $ 21,700 $ 31,000 Direct labor 6,000 11,800 17,800 Overhead (300% of direct labor cost) 18,000 35,400 53,400 Total cost $ 33,300 $ 68,900 $ 102,200 Quantity produced 10,300 ft. 14,200 ft. Average cost per ft. (rounded) $ 3.23 $ 4.85 Glassworks's controller...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge $ 9,300 6.200 Direct materials Direct labor Overhead (300 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) 18,600 $34,100 10,600 ft. Squared Edge Total $21.500 11.00 18.000 35,400 $103,100 14,100 ft. Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $54,000 of...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (3008 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9, 700 6.100 18,300 $34,100 10,300 ft. $ 3.31 Squared Edge Total $21,700 $ 31,400 11.900 18.000 35,700 54,000 $69,300 $103,400 14,000 ft. S 4.95 Glassworks's controller wishes to apply...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,600 6,200 18.600 $34,400 10,500 ft. $ 3.28 Squared Edge Total $21,500 $ 31,100 11,900 18,100 35,700 54,300 $69,100 $103,500 14,200 ft. $ 4.87 Glassworks's controller wishes to apply activity-based...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (382% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,500 6.100 18,388 $ 33,982 10,688 ft. $ 3.20 Squared Edge Total $ 21,500 $ 31,000 11,900 18,00 35.700 54,00 $ 69,182 $183,888 14,288 ft. $ 4.87 Glassworks's controller wishes...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge $21,700 11,900 35,700 $69,300 Total Direct materials $9,400 31,100 17,900 53,700 Direct labor 6,000 Overhead (300% of direct labor cost) 18,000 $33,400 $102,700 Total cost 10,600 ft. $ 3.15 Quantity produced 14,100 ft 4.91 Average cost per ft. (rounded) Glassworks's controller wishes to apply activity-based costing (ABC) to...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge Total Direct materials ...... Direct labor ....... Overhead (300% of direct labor cost) .... Total cost. Quantity produced ...... Average cost per ft. (rounded) ......... $19,000 12,200 36,600 $67,800 10,500 ft. $ 6.46 $ 43,200 23,800 71,400 $138,400 14,100 ft. $ 9.82 $ 62,200 36,000 108,000 $206,200 Glassworks's...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials $ 9,600 $ 21,600 $ 31,200 Direct labor 6,000 11,900 17,900 Overhead (300% of direct labor cost) 18,000 35,700 53,700 Total cost $ 33,600 $ 69,200 $ 102,800 Quantity produced 10,400 ft. 14,000 ft. Average cost per ft. (rounded) $ 3.23 $ 4.94    Glassworks's controller wishes to apply activity-based...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data Direct materials Direct labor Overhead (300x of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,600 6,100 18,309 534,000 10,700 ft. $ 3.18 Squared Edge Total $21,800 $ 31,400 11,900 18.000 35,700 54,000 569,400 $103, 400 14,200 ft. Glassworks's controller wishes to apply activity-based costing...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data 630, 900 $21,400 11.900 Direct materials Direct Labor Overhead (3001 or direct labor coat) Total cost Quantity produced Average cost per ft. (rounded) 633.500 6102.500 669.000 24.100 Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $53,700 of overhead costs incurred by the two product lines to see whether...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT