Spot Construction builds roads, bridges, and other infrastructure. The following is the budget for a road...
Spot Construction builds roads, bridges, and other infrastructure. The following is the budget for a road project along with the actual results in thousands of dollars) for the last fifteen months. Month 1 2 3 Budget Cost Complete 0.0% $ 510 5.0% $ 1,020 10.0% $ 1,530 15.0% $ 2,040 20.0% $ 2,550 25.0% $ 3,060 30.0% $ 3,570 35.0% $ 4,080 40.% $ 4,590 45.0% $ 5,100 50.0% $ 5,610 55.0% $ 6,120 60.0% $ 6,630 63.3% $ 7,140...
Spot Construction builds roads, bridges, and other infrastructure. The following is the budget for a road project along with the actual results (in thousands of dollars) for the last fifteen months. Budget Month Cost Complete $ .ex 1 $ 518 5.0% 2 $ 1,020 10.0% 3 $ 1,530 15.0% 4 $ 2,840 20.0% 5 $ 2,55€ 25.0% 6 $ 3,60 38.0% 7 $ 3,578 35.% 8 $ 4,088 48.8% 9 $ 4,592 45.% 10 $ 5,100 50.0% 11 $ 5,610...