Lets calculate the estimate as per the work breakdown structure:
1.1
site
1.1.1
land improvements
2000
600
1200000
1.1.2
roads, parking, and paved areas
1.1.3
railroads
3000000
3000000
Size of the property = 600 acres
Land improvements, roads, parking, and paved areas cost 2000 $ per acre.
Land improvements, roads, parking, & paved areas cost (for 600 acre property) = 2000x600 = $ 1200000
Railroads will cost $ 3000000
1.2
boiler
110000000
4.472727
492000000
0.535887
263656271.8
1.2.1
furnace
1.2.2
pressure vessel
1.2.3
heat exchange system
1.2.4
generators
1.3
boiler support system
1.3.1
coal transport system
1.3.2
coal pulverizing system
1.3.3
instrumentation and control
1.3.4
ash disposal system
1.3.5
transformers and distribution
In 1993, cost of boiler and boiler support system in a coal fired generating plant twice the size of the one you are estimating was $ 110000000
In 2016, cost of boiler and boiler support system in a coal fired generating plant twice the size of the one you are estimating is = 110000000x(492/110) = 110000000x4.472727 = $ 492000000
where cost index for boilers in 2016 is 492 and cost index for boilers in 1993 was 110. Therefore, cost index is 4.472727
In 2016, cost of boiler and boiler support system in a coal fired generating plant half the size of the 1993 plant is determined by the formula
C2 = C1{Q2/Q1}^a
Where C2 = Cost at desired size
C1=Cost at reference size in today’s date=$492000000
Q2=Capacity at desired size=1
Q1=Capacity at reference size=2
a=Cost Capacity Factor=0.9
Therefore C2=492000000x0.535887=$263656271.8
1.4
coal storage facility
5000000
4.472727
22363636.36
1.4.1
stockpile reclaim system
1.4.2
rail car dump
1.4.3
coal handling equipment
Cost of coal storage facility in 1993 = $ 5000000
Cost of same size coal storage facility in 2016 = 5000000x4.472727 = $ 22363636.36
where cost index in 2016 is 492 and cost index in 1993 was 110. Therefore, cost index is 4.472727
1.5
support facilities and equipment
85500
60
5130000
15000000
20130000
1.5.1
hazardous waste systems
1.5.2
support equipment
1.5.3
utilities and communication systems
1.5.4
security systems
1500
600
900000
Total number of hours required to build support facilities and equipment =95000*90% = 85500 hours
Labor cost per hour to build support facilities and equipment = $ 60 per hour
Total labor cost to build support facilities and equipment = 85500x60= $ 5130000
Cost of material for the construction of support facilities and equipment = 15000000
Total cost for the construction of support facilities and equipment = $ 20130000
Costs of security systems = 1500x600 = $ 900000
1.9
project integration
3%
31693636
950809.0909
1.9.1
project management
1.9.2
environmental management
1.9.3
project safety
1.9.4
quality assurance
1.9.5
test, start-up, and transition management
Project integration cost = 3% of all other construction costs.
Assuming all other construction costs include = construction cost of coal storage facility + construction cost of support facilities and equipment + construction cost of railroads + construction cost of Land improvements, roads, parking, and paved areas.
Therefore all other construction costs = $ 31693636
Project integration costs = 3%(31693636) = $950809.0909
Adding all the costs, we get
Estimated 2016 cost for building the coal fired generating faciliity = 1200000+3000000+263656271.8+22363636.36+20130000+900000+950809.0909 = $ 312200717.2
Extended Learning Exercise. You have been asked to prepare a quick estimate of the construction cost...
A Lump of Coal for Christmas You have recently been promoted to audit senior at an international accounting firm, lontana Power Company (MPC), a NYSE client. You were asked to a major portion of the work at Western Energy Co. (WECо), a wholly-owned subsidiary of MPC. Most of the audit work has already been done, but you must stu trip to the site to complete a few procedures. There are some serious audit issues to contend with this year, but...
You have been hired as new analyst at Foxconn Interconnect Technology Limited (FIT) and have been asked to evaluate the new manufacturing plant to produce new state of art internet security system. Suppose that FIT is considering expanding its wireless home networking appliance, called EasyNet, that will provide both the hardware and the software necessary to run an entire home from any Internet connection. EasyNet will also control new Internet-capable stereos, digital video recorders, heating and air-conditioning units, major appliances,...
Suppose you have been hired as a financial consultant to Defense Electronics, Inc. (DEI), a large, publicly traded firm that is the market share leader in radar detection systems (RDSs). The company is looking at setting up a manufacturing plant overseas to produce a new line of RDSs. This will be a five-year project. The company bought some land three years ago for $2.9 million in anticipation of using it as a toxic dump site for waste chemicals, but it...
Summary should briefly analyze the central problems and issues of the case and provide some analysis and suggestions. Thank you. Lean Initiatives and Growth at Orlando Metering Company It was late August 2002 and Ed Cucinelli, vice president of Orlando Metering Company (OMC), sat in his office on a late Saturday morning. He had come in to prepare for some strategic planning meetings that were scheduled for the upcoming week. As he noticed the uncommon silence in the building, Ed...
I have this case study to solve. i want to ask which
type of case study in this like problem, evaluation or decision? if
its decision then what are the criterias and all?
Stardust Petroleum Sendirian Berhad: how to inculcate the pro-active safety culture? Farzana Quoquab, Nomahaza Mahadi, Taram Satiraksa Wan Abdullah and Jihad Mohammad Coming together is a beginning; keeping together is progress; working together is success. - Henry Ford The beginning Stardust was established in 2013 as a...