Bardot Marine Company | ||||
Answer 1 a | ||||
Budgeted Direct Labor Hours | Speed Boat | Bass Boat | Total | Note |
Direct Labor Hour per unit | 12.00 | 12.00 | A | |
Number of units | 250.00 | 250.00 | B | |
Budgeted Direct Labor Hours | 3,000.00 | 3,000.00 | 6,000.00 | C=A*B |
Answer 1 b | ||
Calculation of single plant wide OH Rate | Total | Note |
Budgeted Direct Labor Hours | 6,000.00 | See C |
Budgeted Overhead costs | 600,000.00 | D |
Predetermined OH Rate | 100.00 | E=D/C |
Answer 1 c | |||
Overhead allocated to each unit | Speed Boat | Bass Boat | Note |
Direct Labor Hour per unit | 12.00 | 12.00 | See A |
Predetermined OH Rate | 100.00 | 100.00 | See E |
Overhead allocated to each unit | 1,200.00 | 1,200.00 | F=A*E |
Answer 2 a | ||||
Budgeted Direct Labor Hours- Fabricating | Speed Boat | Bass Boat | Total | Note |
Direct Labor Hour per unit | 8.00 | 4.00 | G | |
Number of units | 250.00 | 250.00 | See B | |
Budgeted Direct Labor Hours- Fabricating | 2,000.00 | 1,000.00 | 3,000.00 | H=G*B |
Budgeted Direct Labor Hours- Assembly | Speed Boat | Bass Boat | Total | Note |
Direct Labor Hour per unit | 4.00 | 8.00 | I | |
Number of units | 250.00 | 250.00 | See B | |
Budgeted Direct Labor Hours- Assembly | 1,000.00 | 2,000.00 | 3,000.00 | J=I*B |
Total Budgeted Direct Labor Hours | 3,000.00 | 3,000.00 | 6,000.00 | K=H+J |
Answer 2 b | ||||
Department wide OH Rate | Fabricating | Assembly | Note | |
Machine Hours/ Labor Hours | 3,000.00 | 3,000.00 | 6,000.00 | See K |
Total Overhead costs | 420,000.00 | 180,000.00 | 600,000.00 | L |
Department wide OH Rate | 140.00 | 60.00 | M=K/L | |
Answer 2 c | ||||
Overhead allocated to Speed Boat | Fabricating | Assembly | Total | Note |
Direct Labor Hour per unit | 8.00 | 4.00 | 12.00 | N |
Department wide OH Rate | 140.00 | 60.00 | See M | |
Overhead allocated to Speed Boat | 1,120.00 | 240.00 | 1,360.00 | O=M*N |
Overhead allocated to Bass Boat | Fabricating | Assembly | Total | Note |
Direct Labor Hour per unit | 4.00 | 8.00 | 12.00 | P |
Department wide OH Rate | 140.00 | 60.00 | See M | |
Overhead allocated to Bass Boat | 560.00 | 480.00 | 1,040.00 | Q=P*M |
Answer 3 a | ||||
Calculation of ABC rates for overhead | R | S | T=R/S | |
Activity cost pool | Cost Driver | Cost | Cost Driver | ABC rates |
Fabricating | Direct Labor Hours | 204,000.00 | 3,000.00 | 68.00 |
Assembly | Direct Labor Hours | 105,000.00 | 3,000.00 | 35.00 |
Setup | Number of setups | 156,000.00 | 400.00 | 390.00 |
Inspection | Number of Inspections | 135,000.00 | 1,500.00 | 90.00 |
Total Cost assigned | 600,000.00 |
Answer 3 b | See T | U | V=T*U | W | X=T*W | ||||
Allocation table | Speed Boat | Bass Boat |
|
||||||
Activity cost pool | Cost Driver | ABC Rates | Activity used | Cost assigned | Activity used | Cost assigned | Note | ||
Fabricating | Direct Labor Hours | 68.00 | 2,000.00 | 136,000.00 | 1,000.00 | 68,000.00 | |||
Assembly | Direct Labor Hours | 35.00 | 1,000.00 | 35,000.00 | 2,000.00 | 70,000.00 | |||
Setup | Number of setups | 390.00 | 300.00 | 117,000.00 | 100.00 | 39,000.00 | |||
Inspection | Number of Inspections | 90.00 | 1,100.00 | 99,000.00 | 400.00 | 36,000.00 | |||
Total Cost assigned | 387,000.00 | 213,000.00 | X | ||||||
Units produced | 250.00 | 250.00 | See B | ||||||
Overhead allocated to each unit | 1,548.00 | 852.00 | Y=X/B |
ACCT 2123 - Managerial Accounting Chapter 18 Additional Exercises 1) Single Plantwide Factory Overhead Rate The...
Single Plantwide Factory Overhead Rate The total factory overhead for Bardot Marine Company is budgeted for the year at $600,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboat and bass boat each require 12 direct labor hours for manufacture. Each product is budgeted for 250 units of production for the year. Single Plantwide Factory Overhead Rate The total factory overhead for Bardot Marine Company is budgeted for the year at $600,000. Bardot Marine manufactures two...
Single Plantwide Factory Overhead Rate The total factory overhead for Bardot Marine Company is budgeted for the year at $1,863,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboat and bass boat each require six direct labor hours for manufacture. Each product is budgeted for 9,000 units of production for the year. When required, round all per unit answers to the nearest cent. a. Determine the total number of budgeted direct labor hours for the year....
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $810,875, divided into two departments: Fabrication, $453,375, and Assembly, $357,500 Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require one direct labor hour in Fabrication and four direct labor hours in Assembly. The bass boats require two direct labor hours in Fabrication and one direct labor hour in Assembly. Each product is budgeted for 6,500...
The total factory overhead for Bardot Marine Company is budgeted for the year at $1,027,000, divided into two departments: Fabrication, $526,500, and Assembly, $500,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require one direct labor hour in Fabrication and three direct labor hours in Assembly. The bass boats require two direct labor hours in Fabrication and four direct labor hours in Assembly. Each product is budgeted for 6,500 units of production for the year....
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $1,481,250, divided into two departments: Fabrication, $881,250, and Assembly, $600,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require one direct labor hour in Fabrication and four direct labor hours in Assembly. The bass boats require four direct labor hours in Fabrication and four direct labor hours in Assembly. Each product is budgeted for 7,500...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $1,365,000, divided into two departments: Fabrication, $1,071,000, and Assembly, $294,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require four direct labor hours in Fabrication and three direct labor hours in Assembly. The bass boats require two direct labor hours in Fabrication and one direct labor hour in Assembly. Each product is budgeted for 7,000...
The total factory overhead for Bardot Marine Company is budgeted for the year at $897,000, divided into two departments: Fabrication, $711,000, and Assembly, $186,000. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require three direct labor hours in Fabrication and three direct labor hours in Assembly. The bass boats require three direct labor hours in Fabrication and one direct labor hour in Assembly. Each product is budgeted for 6,000 units of production for the year....
Single Plantwide Factory Overhead Rate The total factory overhead for Bardot Marine Company is budgeted for the year at $646.000. Bardot Marine maractures two types of boots speedboats and bass boats. The speedboat and bass boat each require si direct labor hours for manufacture. Each product is budgeted for 6,000 units of production for the year When required, round all per unit answers to the nearest cent. a. Determine the total number of budgeted direct labor hours for the year...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $495,000, divided into two departments: Fabrication, $382,500, and Assembly, $112,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require four direct labor hours in Fabrication and three direct labor hours in Assembly. The bass boats require two direct labor hours in Fabrication and two direct labor hours in Assembly. Each product is budgeted for 3,000...
Multiple Production Department Factory Overhead Rates The total factory overhead for Bardot Marine Company is budgeted for the year at $505,500, divided into two departments: Fabrication, $321,000, and Assembly, $184,500. Bardot Marine manufactures two types of boats: speedboats and bass boats. The speedboats require two direct labor hours in Fabrication and two direct labor hours in Assembly. The bass boats require two direct labor hours in Fabrication and four direct labor hours in Assembly. Each product is budgeted for 3,000...