Difference between activity-based cost and activity cost
management.
Can you say that the activity-based cost system is a mechanism that
refines cost systems?
It argues in terms of the advantages of using the activity-based
cost system (ABC costing) in terms of the allocation of indirect
costs to the products or services and the difference between the
activity-based cost (activity based costing) and activity cost
management (activity based management).
Activity based costing or ABC costing generally use cost drivers as a source to differentiate the overheads and allocate them appropriately.
Difference between activity-based cost and activity cost management. Can you say that the activity-based cost system...
Groleau Corporation has an activity-based costing system with three activity cost pools: Processing, Setting Up, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the...
In the following scenarios, would you recommend that management use a plantwide allocation system or activity based costing? - A. B. In bidding for jobs, managers lost bids they expected to win, and won bids they expected to lose. - A. B. The calculated cost of the products are very similar under different methods of allocating overhead. - A. B....
question 20 an ABC system is one building block of activity - based management (ABM) . the second building block is 1- the ability for managers to understand that the demand for output is central to profitability 2- knowing the limitations of allocating indirect costs 3-automating the costing system 4-that senior management support is crucial 5- understanding the components of indirect cost pools
Activity-based job-costing system. Henriksen AS manufactures and sells packaging machines. It recently used an activity-based approach to refine the job-costing system at its Vejle plant. The resulting job-costing system has one direct-cost category (direct materials) and four indirect manufacturing cost pools. These four indirect- cost pools and their allocation bases were chosen by a team of product designers, manufacturing personnel and marketing personnel: Cost-allocation base Indirect manufacturing cost pool Budgeted cost- allocation rate 1. Materials handling 2. Machining 3. Assembly...
Deemer Corporation has an activity based costing system with three activity cost pools Processing Supervising and Other in the first stage allocations, costs in the two overhead accounts, equipment expense and Indirect laborare allocated to the three activity cost pools based on resource consumption Data used in the first stage allocations follow Overhead costs: Equipment expense Indirect labor $99.00 $12,780 Distribution of Resource Consumption Across Activity Cost Pools Activity Cost Pools Processing Supervising Equipment expense Indirect labor Processing costs are...
Activity-based costing, or ABC, is a costing method that managers can use for internal cost reporting and decision making. While ABC isn't allowed for external financial reporting, companies may find it useful to enact an ABC system to more effectively analyze cost data. ABC systems excel at being able to assign costs to products that are manufactured and supported by many different types of activities. Question is, would this be very expensive? And, is there a lot of training involved?
Groleau Corporation has an activity-based costing system with three activity cost pools--Processing, Setting Up, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other...
Groleau Corporation has an activity-based costing system with three activity cost pools--Processing, Setting Up, and Other. Th company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to t activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-h (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other...
Groleau Corporation has an activity-based costing system with three activity cost pools--Processing, Setting Up, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting Up cost pool are assigned to products based on the number of batches. Costs in the Other...
Which of the following statements is correct about the differences between a volume-based cost system and an ABC system? O The only difference is how the methods assign indirect costs to products. O The only difference is how the methods assign direct costs to products O The methods assign both direct and indirect costs differently to products O There is no difference in how the methods assign direct or indirect costs to products.