Network analysis is one of the classic methods of planning and controlling the progress of projects. in this regard we would do the critical path analysis. The longest duration path through the network is known as CRITICAL PATH. If we do not want to delay the completion time, activities on the critical path cannot be delayed.
8. You have signed a contract to build a garage for the Simpsons. You will receive...
Project Management Development Ghana Limited is bidding a contract to build a garage for the Minister in Charge of Procurement. The project charter legal application indicates that; the PMD Ghana Ltd will receive $70,000 bonus for completing the project within 15 working days. The contract also contains a penalty clause in which the company will lose $60,000 for each day the project takes longer than 15 working days.a) You have been appointed as the project consultant for Project Management Development Ghana...
Problem 15-7 Consider the following table of precedence relationships for a portion of a house building project: Task Duration Estimates Immediate Predecessor(s) A Prepare Site 3 days None B Install Rough Plumbing 2 days Prepare Site C Pour Concrete Foundation 3 days Install Rough Plumbing D Concrete Curing Time 4 days Pour Concrete Foundation E Preassemble Wall Frames 6 days None F Erect Wall Frames 2 days Preassemble WF, Cure Concrete G Install Roof 1 day Erect Wall Frames H...
can you please answer question 1 and 3 please ABC General Contractors ABC General Contractors was an established construction company handling small-to medium- sized commercial and industrial construction projects. Some recent projects that the company had completed were a 20,000-square-foot factory building, a four-story office building, and a water filtration plant. TELEVISION TOWER BID The company was now in the process of preparing a bid for a television station for the erection of a 225-foot-high television antenna tower and the...