Question

eBook Calculator Box Springs, Inc., makes two sizes of box springs: twin and double. The direct material for the twin is $20
0 0
Add a comment Improve this question Transcribed image text
Answer #1

A 4 1 3 Framing 4 Padding 5 Filling 6 Labelling 7 Inspection Estimated Overhead (a) Use per Twin (b) Use per Double (c) Total

Working note:

1 2 Pools 3 Framing 4 Padding 5 Filling 6 Labelling 7 Inspection Estimated Overhead (a) Use per Twin (b) Use per Double (c) T

Add a comment
Know the answer?
Add Answer to:
eBook Calculator Box Springs, Inc., makes two sizes of box springs: twin and double. The direct...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Box Springs, Inc., makes two sizes of box springs: twin and double. The direct material for...

    Box Springs, Inc., makes two sizes of box springs: twin and double. The direct material for the twin is $20 per unit and $35 is used in direct labor, while the direct material for the double is $40 per unit, and the labor cost is $45 per unit. Box Springs estimates it will make 5,000 twins and 10,000 doubles in the next year. It estimates the overhead for each cost pool and cost driver activities as follows: Activity Cost Estimated...

  • Box Springs, Inc., makes two sizes of box springs: twin and double. The direct material for...

    Box Springs, Inc., makes two sizes of box springs: twin and double. The direct material for the twin is $20 per unit and $45 is used in direct labor, while the direct material for the double is $35 per unit, and the labor cost is $45 per unit. Box Springs estimates it will make 5,000 twins and 10,000 doubles in the next year. It estimates the overhead for each cost pool and cost driver activities as follows: Activity Cost Pools...

  • Box springs makes two sizes of box springs twin and double. The direct material for the...

    Box springs makes two sizes of box springs twin and double. The direct material for the twin is $30 per unit and $45 is used for direct labor while the direct material for the double is $45 per unit and the direct labor cost is $45 per unit. Box Springs Estimates it will make 5000 twins and 10,000 doubles in the next year. it estimates the overhead for each cost for and cause a driver activities as follows. Arty Overhead...

  • Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop...

    Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop cost estimates that she can use to prepare bids on jobs. After analyzing the firm’s costs, Cairns has developed the following preliminary cost estimates for each 1,000 square feet of landscaping. Direct material $ 440 Direct labor (5 direct-labor hours at $10 per hour) 50 Overhead (at $16 per direct-labor hour) 80 Total cost per 1,000 square feet $ 570    Cairns is quite...

  • Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop...

    Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop cost estimates that she can use to prepare bids on jobs. After analyzing the firm’s costs, Cairns has developed the following preliminary cost estimates for each 1,000 square feet of landscaping. Direct material $ 440 Direct labor (5 direct-labor hours at $10 per hour) 50 Overhead (at $16 per direct-labor hour) 80 Total cost per 1,000 square feet $ 570    Cairns is quite...

  • Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop...

    Earth and Artistry, Inc. provides commercial landscaping services. Sasha Cairns, the firm’s owner, wants to develop cost estimates that she can use to prepare bids on jobs. After analyzing the firm’s costs, Cairns has developed the following preliminary cost estimates for each 1,000 square feet of landscaping. Direct material $ 460 Direct labor (5 direct-labor hours at $10 per hour) 50 Overhead (at $16 per direct-labor hour) 80 Total cost per 1,000 square feet $ 590    Cairns is quite...

  • The following data are for the two products produced by Tadros Company. Direct materials Direct labor...

    The following data are for the two products produced by Tadros Company. Direct materials Direct labor hours Machine hours Batches Volume Engineering modifications Number of customers Market price Product A $14 per unit 0.5 DLH per unit 0.4 MH per unit 125 batches 10,000 units 10 modifications 500 customers $35 per unit Product B $25 per unit 1.5 DLH per unit 1.1 MH per unit 250 batches 2,000 units 50 modifications 400 customers 95 per unit per Sunit The company's...

  • Ontario, Inc. manufactures two products, Standard and Enhanced, and applies overhead on the basis of direct-labor...

    Ontario, Inc. manufactures two products, Standard and Enhanced, and applies overhead on the basis of direct-labor hours. Anticipated overhead and direct-labor time for the upcoming accounting period are $800,000 and 25,000 hours, respectively. Information about the company’s products follows. Standard: Est. production volume, 3000 units                     Direct-material cost, $25 per Unit                     Direct Labor per unit, 3 hrs at $12 per hr Enhanced: Est. production volume, 4000 units                      Direct material cost, $40 per Unit                     ...

  • Zack Manufacturing Company makes a product that is processed through two departments: cutting and final. All...

    Zack Manufacturing Company makes a product that is processed through two departments: cutting and final. All materials are added in the first department. During the month of March 2019, the company made 4,400 units of the product. Standard costs and actual costs for materials and labor are given below: STANDARD COSTS Raw materials Framing: 11 square feet at $0.30 per square foot $ 3.30 Filler: 14 pounds at $0.25 per pound 3.50 Standard materials cost per unit $ 6.80 Direct...

  • eBook Calculator Finne Single plantwide factory overhead rate Bach Instruments Inc. makes three musical instruments: flutes,...

    eBook Calculator Finne Single plantwide factory overhead rate Bach Instruments Inc. makes three musical instruments: flutes, darinets, and oboes. The budgeted factory overhead cost is $101.400. Overhead is allocated to the three products on the basis of direct labor hours. The products have the following budgeted production volume and direct labor hours per unit: Budgeted Production Volume Direct Labor Hours Per Unit 0.5 Rutes 2,800 units 700 1.4 Clarinets 1.0 Oboes 1,000 If required, round all per unit answers to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT