Cpk = minimum of [ 1.17 , 2.17)
Cpk = 1.17
A Cpk value of 1.17 suggests that the process is capable of producing no more than 6200 defects per million. Hence the process is not capable of producing no more than 3.4 defects per million produced.
4) The specification for a plastic liner for concrete highway projects calls for a thickness of...
The specifications for a plastic liner for a concrete highway project calls for thickness of 5.0mm +(with a minus sign or line under it) 0.12mm. The standard devaition of the process is estimated to be 0.02mm. a. The upper specifcation limit for this product = (answer needed) mm (round to 3 decimal places) b. The lower specification limit for this product = (answer needed) mm (round to 3 decimal places) c. The process is known to operate at a mean...
of the process is estimated to be 0.02 mm. The specifications for a plastic liner for a concrete highway project calls The upper specification limit for this product 5.1 mm (round your response to three decimal places. The lower specification limit for this product·4.9 mm (round your response to three decimal places) The process is known to operate at a mean thickness of 5.0 mm. The process capabilily index for thickness of 5.0 mm ± 0.10 mm. The standard deviation...
) A cable operator’ quality analyst is monitoring calls from hundred customers randomly on a daily basis. She notes down instances of incorrect information being passed on to customers; the data collected over five days is given below. Day Monday Tuesday Wednesday Thursday Friday Number of instances of incorrect information 5 10 23 20 15 a) Calculate the upper and lower control limits for her c-chart. 4) The specification for a Lyn's stainless steel chimney liner requires a thickness of...
How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...