Question

4) The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm 0.1 mm. The standard d
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Cpk = minimum of Upper specification limit - X X - Lower specification limit 30

[6.1 - 6.03 6.03 - 5.9 Cpk = minimum of 3 x 0.02 3 x 0.02

Cpk  = minimum of [ 1.17 , 2.17)

Cpk  = 1.17

A Cpk value of 1.17 suggests that the process is capable of producing no more than 6200  defects per million. Hence the process is not capable of producing no more than 3.4 defects per million produced.

Add a comment
Know the answer?
Add Answer to:
4) The specification for a plastic liner for concrete highway projects calls for a thickness of...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The specifications for a plastic liner for a concrete highway project calls for thickness of 5.0mm...

    The specifications for a plastic liner for a concrete highway project calls for thickness of 5.0mm +(with a minus sign or line under it) 0.12mm. The standard devaition of the process is estimated to be 0.02mm. a. The upper specifcation limit for this product = (answer needed) mm (round to 3 decimal places) b. The lower specification limit for this product = (answer needed) mm (round to 3 decimal places) c. The process is known to operate at a mean...

  • of the process is estimated to be 0.02 mm. The specifications for a plastic liner for...

    of the process is estimated to be 0.02 mm. The specifications for a plastic liner for a concrete highway project calls The upper specification limit for this product 5.1 mm (round your response to three decimal places. The lower specification limit for this product·4.9 mm (round your response to three decimal places) The process is known to operate at a mean thickness of 5.0 mm. The process capabilily index for thickness of 5.0 mm ± 0.10 mm. The standard deviation...

  • ) A cable operator’ quality analyst is monitoring calls from hundred customers randomly on a daily...

    ) A cable operator’ quality analyst is monitoring calls from hundred customers randomly on a daily basis. She notes down instances of incorrect information being passed on to customers; the data collected over five days is given below. Day Monday Tuesday Wednesday Thursday Friday Number of instances of incorrect information 5 10 23 20 15 a) Calculate the upper and lower control limits for her c-chart. 4) The specification for a Lyn's stainless steel chimney liner requires a thickness of...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT