thank you and please do rate.
The wastewater coming from small development was treated by the string of 2 ponds. The initial...
Verizon 6:19 PM @ 82%) D. + Back ClV 340 H 3 due Sept 4.docx Г1 CIV 340 H 3 (10 pts) due September 4 The wastewater coming from small development was treated by the string of 2 ponds. The initial flow to the pond was 21 m/hr, and it was carrying 115 mg/L of nonconservative pollutant. Assume the following: steady state, complete mixed, decay(1 kinetics), k-0.31 d 1. Draw the sketch that express this problem 2. How many systems...