Question

3.14 (SI units) Solve the previous problem except that in partToo ting (a), determine the cutting speed for minimum cost. 23.15 (uSCS units) Cemented carbide inserts are used to turn 21.0 in and diameter = 4.0 in. Feed the a part with length incre that f what produ 0.015 in/rev. The parameters in the Taylor equation are n = 0.25 and C =800 (ft/nin) The operator and machine tool rate = S45.00/hr. and the tooling cost per cutting edge = . $2.00. It takes 2.5 min to load and unload the work part and 1.50 min to change inserts. Determine the (a) cutting speed for maximum production rate. (b) tool life. and (c) cycle time and cost per unit of product. 23.20 (A) cylindr loads ar work 23.16 (A) (USCS units) Solve the previous problem except that of the fol in part (a), determine the cutting speed for minimum cost

Please solve 23.15 thank you!

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Please solve 23.15 thank you! 3.14 (SI units) Solve the previous problem except that in partToo...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Work out #5, clearly and with units. Please and thank you! plane of the rectangle? (b)...

    Work out #5, clearly and with units. Please and thank you! plane of the rectangle? (b) How much angular momentum and kinetic energy does the array have if it rotates at an angular velocity of 20 rad/s? 3. Determine the minimum area of a flat ice floe (sheet) 100 cm thick if it must support a 1600-kg truck above seawater. Assume the top of the ice is level with the ocean. (Hint: what is the volume of the ice?) Pice...

  • Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem...

    Please solve problem 1 and show formulas used Tables for reference: Homework 6- Chapter 9 Problem 1: A crawler hoe having a 2 -cy bucket and whose cost per hour, including the wages to an operator, is $109 will excavate and load haul units under each of the stated conditions. The maximum digging depth of the machine is 22 ft. Determine the cost per bank cubic yard for each condition. (Condition 1: 315 bey/hr, S0.346/bcy; condition 2: 289 bey/hr, S0.377/bcy;...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT