PLEASE SOLVE FOR DAM SITE 4. POND TOP 15 m POND BOTTOM 5m 1 Th= h...
50 m Impermeable Concrete dam 6 m 1 m 10 m PtA (at mid-point of layer and centre of base) DATUM Impermeable bedrock Figure 2: Concrete dam (not to scale) Figure 2 shows the cross-section through a long concrete dam in anisotropic soil. The horizontal and vertical permeability of the soil are: K 25 x 10-4 cm/sec and Ky 1 x 10-cm/sec.. (a) Calculate the transform parameter a. In your exam booklet, draw the transformed flow domain to scale and...
hope to get a clear answer Earth dam h 5.6m 0.8 m 0.8 m 0.8 m 0.8 m 0.8 m 08 m Reservoir_ Phreatic surface (u 0) Impermeable foundation Gravel toe drain (flooded) Figure 1 Question 1 What is the estimated seepage through the earth dam per m run: (a) 96 x 10-5 m3/hour (b) 1.92 x 10-5 m3/hour (c) 6.91 x 10-2 m3/hour (d) 115.2 x 10-5 m3/hour er m run)- Question 2 The total head at point A...
The figure below shows the soil profile conditions below a 5-m deep pond. Water is seeping directly downward under steady-state conditions through the clay layer into underlying gravel. Assume the elevation datum at the top of the gravel layer and that the hydrostatic ground water table is also found in the top of the gravel and its position does not change with time or amount of flow. For these flow conditions, calculate the following: a. b. c. d. e. f....
Question 1 At the site of a proposed building, 12 m of sand (k = 3.5 x 10-5 m/s, e = 0.55, Gs = 2.65) overlies impermeable bedrock. A sheet pile wall is installed to a depth of 9 m to facilitate an excavation which is 6 m deep. The water table outside the excavation is at a depth of 2 m, while the excavation is pumped to keep it dry. (a) How might the value of k quoted above...
ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...
ENGINEERING HYDROLOGY CIVL431 Assignment #1 Problem 11 The following data were observed at Demirköprü Dam site on Gediz River in June 1971. Find the monthly evaporation in mm from the reservoir surface of this dam. If there were a Class A pan installed nearby the reservoir, what would be the monthly evaporation observed from this pan? Storage at the beginning of the month : 4XY.Z - 10 m Storage at the end of the month 47x V -10 m Average...