Question 1 At the site of a proposed building, 12 m of sand (k = 3.5...
3) At a construction site, a site investigation has been carried out. At ground level (-1 m NAP) a clay layer with a thickness of 4 m is found (y = 16 kN/m”, k = 2.0x10-12 m/s, Cp = 15), followed by a sand layer of 6 m thickness (y = 20 kN/m², k = 5.0x10-7 m/s), another clay layer of 4m thickness (y = 18 kN/m3, k = 4.5x10-11 m/s, Cp = 25), and finally another sand layer (y...
Question 4 In order to determine the in-situ density of the soil at a site, the sand replacement test conducted and the following results were obtained: 2.12 kg 1.85 kg Mass of soil extracted from the hole Mass of soil after oven drying Mass of sand pouring cylinder initially 5.45 kg Mass of sand pouring cylinder finally 3.27 kg Volume of cone in sand pouring cylinder 0.25x103 m3 Density of sand in cylinder 1579 kg/m If the specific gravity of...
PLEASE SOLVE FOR DAM SITE 4. POND TOP 15 m POND BOTTOM 5m 1 Th= h = 15m Rock 25m below pond bottom h = 3m 25 m h = 12m h = 9m h = 6m EXAM #2 (3-31-2020), SECTION 002 Students, Last Name Begins DAM SITE A TOC D TOL МТО Р O TOZ SOIL PERMEABILITY (Meters/Sec) 1 X 10 -(minus) 5 1 x 10- (minus) 3 4 X 10 - (minus) 6 7 X 10 -(minus) 5...