Question

roblem 1. (50 points) ooulation of a small city in 2018 is estimated at 100,000 people, Knowing that Domestic water use is 300 V(c.d) 2 Non Revenue Water is estimated at 35%, 20% of which are administrative losses 15% are physical losses, 3. The length diameter product of the wastewater collection system is 10,000 km,.mm infiltration to the sewers during the wet season is estimated at 0.35 m2d 4. Outdoor use is 10%. 5, 70% of the indoor water use is grey water, 6. Per capita BOD, is 60 (c.d) 71 m3-1000 L etermine: A. Domestic water use in (m3/d), B. Non revenue water in (m/d), C. Total water demand considering Non Revenue water, use the following formu demand Water use Total demand1. plosical loss 100 D. Raw Water needed assuming 20% loss in the water treatment plant. E. Infiltration/Inflow in (m2/d) F. Wastewater volume in (m/d) during the wet season assuming no grey wat G. BOD, of the wastewater in mg/l assuming no grey water recycle H. Wastewater volume in (m2/d) during the wet season assuming grey water BOD, of the wastewater in mg/l assuming grey water recycle, and J. Comment on BOD, concentration with and without grey water recycle.
0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
roblem 1. (50 points) ooulation of a small city in 2018 is estimated at 100,000 people,...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Please answer question 7.11 that is modified from the book, thank you! uent welr IS located...

    Please answer question 7.11 that is modified from the book, thank you! uent welr IS located on Lle periphery of each tank. Calculate the surface overflow rate, etention time, and weir loading rates. If one tank is taken out of detention time? Is the design adequate for the average flow with the three tanks in service? m3/d. The engineer wishes to use rectangular clarifiers for primary 18 Fundamentals of wastewater treatment and engineering treatment. Design the rectangular tanks for a...

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT