Economic Production Quantity is the number of unit that is added to the inventory which minimize the total inventory cost. It maintain a balance between ordering costs and carrying costs.

H = $14 / unit /year p = 960 waits day D = 33000 writs d = 120 units/day 8 = 120 units a sa (120)2 x 14 x (la 120 960) 2 x 33

Add a comment
Know the answer?
Add Answer to:
Problem 16.1 : Question Help Carol Cagle has a repetitive manufacturing plant producing trailer hitches in...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $30 per hour $14 per unit 1,008 units/8 hour day 43,680 (260 days each x daily...

  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one​ component, the safety chain​ clip: Setup labor cost ​$25 per hour Annual holding cost ​$14 per unit per unit Daily production 992 units/8 hour day Annual demand 25300 (275​ days each ×daily demand of...

  • Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has...

    Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $20 per hour $12 per unit 976 units/8 hour day 25,300 (275 days each x daily...

  • gle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has an...

    gle has a repetitive manufacturing plant producing trailer hitches in​ Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one​ component, the safety chain​ clip: Setup labor cost ​$2525 per hour Annual holding cost ​$1212 per unit Daily production 1 comma 0081,008 ​units/8 hour day Annual demand 36 comma 00036,000 ​(250250 days eachtimes ×daily demand...

  • Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to...

    Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to prepare for a reduced lot size. The firm uses a work year of 290 days. Setup labor cost ​$40.00 per hour Annual holding cost ​$16 per unit Daily production​ (8 hours) 960 units/day Annual demand for steering wheels 29,000 ​(290 days×daily demand of 100 ​units) Desired lot size​ (2 hours of​ production) Q= 240 units A) what is the setup cost? B) what is...

  • Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to...

    Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to prepare for a reduced lot size. The firm uses year of 290 days. Setup labor cost $40.00 per hour Annual holding cost $15 per unit Daily production (8 hours) 800 units/day Annual demand for steering wheels 34,800 (290 days x daily demand of 120 units) Desired lot size (2 hours of production) Q = 200 units a) Setup cost = $ (round your response...

  • Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to...

    Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to prepare for a reduced lot size. The firm uses a work year of 290 days. Setup labor cost Annual holding cost $60.00 per hour $13 per unit 960 units/day Daily production (8 hours) Annual demand for steering wheels 31,900 (290 days x daily demand of 110 units) Desired lot size (2 hours of production) Q 240 units a) Setup cost = $ (round your...

  • a) Setup Cost: b) Setup Time: Rick Wing has a repetitive manufacturing plant producing automobile steering...

    a) Setup Cost: b) Setup Time: Rick Wing has a repetitive manufacturing plant producing automobile steering wheels. Use the following data to prepare for a reduced lot size. The firm uses a work year of 305 days. Setup labor cost $40.00 per hour Annual holding cost $16 per unit Daily production (8 hours) 800 units day Annual demand for steering wheels 36,600 (305 days x daily demand of 120 units) Desired lot size (2 hours of production) 0 - 200...

  • 3. A repetitive manufacturing firm is planning on level material use. The following information has been...

    3. A repetitive manufacturing firm is planning on level material use. The following information has been collected. Currently, the firm operates 250 days per year. Annual demand (D) 20,000 Daily demand (d) Daily production (p) 250 Desired lot size (Q) Holding cost per unit per year (H) $50 1) What is the setup cost based on the desired lot size? (10 points) 80 2) What is the desired setup time based on $50 hour setup labor? (10 points) 3) Theoretically,...

  • Homework: HW-CH16 Score: 0 of 1 pt Problem 16.2 2 of 4 (1 complete) Given the...

    Homework: HW-CH16 Score: 0 of 1 pt Problem 16.2 2 of 4 (1 complete) Given the following information about a product, at Michael Gibson's firm, what is the appropriate setup time? Setup labor cost$30.00 per hour Annual holding cost $29 per unit Daily production Annual demand Desired lot size 1,200 units/day 42,000 (280 days each xdaily demand of 150 units) 300 units Setup time-□ minutes (round your response to two decimal places).

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT