Question

1. A 15 foot thick doubly drained layer of saturated clay under a surcharge loading underwent 90% primary consolidation in 12

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Given that the tick dabl Saianted clay he. thi C aine 15foot. t he. tion for the. esSure ya dere. T tldr: driange pa : 2o dau10:3 6 06 6-36 for Tickness c5ft Time reqiyeds ickhess) Cy 12S o.DS3 ニ098y 8x (0062.5) 053 O. 053 3 31 25xlo3 0 053 0625 days

Add a comment
Know the answer?
Add Answer to:
1. A 15 foot thick doubly drained layer of saturated clay under a surcharge loading underwent...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • relatively 5E m2/sec The 2. A new, wide highway embankment is planned deposit of doubly-drained, saturated clay soil wi...

    relatively 5E m2/sec The 2. A new, wide highway embankment is planned deposit of doubly-drained, saturated clay soil with c settlement analysis of the 10 m thick clay layer yielded consolidation settlement of 800 mm for the new embankment loading. Determine and plot the settlement of the clay layer (as measured at the ground surface) at 0, 0.49, 3.12, 6.39, 13.44, and 18.44 years. recent across a an estimated relatively 5E m2/sec The 2. A new, wide highway embankment is...

  • The time for 50% consolidation of a 25 mm thick clay specimen (drained at top and bottom) in the laboratory is 1...

    The time for 50% consolidation of a 25 mm thick clay specimen (drained at top and bottom) in the laboratory is 150 sec. How long (in days) will it take for a 3 m thick layer of the same clay in the field under the same pressure increment to reach 75% consolidation? There is an impermeable shale layer at the bottom of the clay layer in the field I. 2. Use Figure 1 for the following Compute the vertical effective...

  • 1. An 8-m thick normally consolidated clay layer is doubly drained as shown below. (This means...

    1. An 8-m thick normally consolidated clay layer is doubly drained as shown below. (This means that a very pervious layer compared to the clay exists on top of and under the clay layer) The embankment applied an average vertical stress increase of 100 kPa to the clay layer. The water table is located at the mid depth of the sand layer. Assume the sand above the water table is dry 0 Pore water pressure, u (kPa) 20 40 60...

  • Q1) An oedometer test was performed on a 2 cm thick clay sample drained on both...

    Q1) An oedometer test was performed on a 2 cm thick clay sample drained on both sides taken from the mid clay layer shown below , after 10 minutes 50% consolidation is reached. a) How long time in days would the same degree of consolidation(50%) be reached in the field ?. b) How much the Final settlement would be reached in the clay layer.? c) How much the preconsolidation pressure of a specimen. ? 3m 2m Sand surcharge Y= 17...

  • soil Q1) An oedometer test was performed on a 2 cm thick clay sample drained on...

    soil Q1) An oedometer test was performed on a 2 cm thick clay sample drained on both sides taken from the mid clay layer shown below, after 10 minutes 50% consolidation is reached . a) How long time in days would the same degree of consolidation(50%) be reached in the field ?. b) How much the Final settlement would be reached in the clay layer.? c) How much the preconsolidation pressure of a specimen. ? 3m 2m Sand surcharge Y...

  • soil mechanics Q1) An oedometer test was performed on a 2 cm thick clay sample drained...

    soil mechanics Q1) An oedometer test was performed on a 2 cm thick clay sample drained on both sides taken from the mid clay layer shown below, after 10 minutes 50% consolidation is reached. a) How long time in days would the same degree of consolidation(50%) be reached in the field ? b) How much the final settlement would be reached in the clay layer.? c) How much the preconsolidation pressure of a specimen. ? Sm 2m Sand surcharge y...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The watertable is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m and a saturated unit weight of 18 kN/m3. The capillary rise in sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m 1. One...

  • The ground profile of a construction site consists of a 3 m thick layer of sand...

    The ground profile of a construction site consists of a 3 m thick layer of sand followed by a 2 m thick layer of clay lying on impervious bedrock. The water table is at a depth of 2 m below the ground surface. The sand has a dry unit weight of 16 kN/m3 and a saturated unit weight of 18 kN/m3. The capillary rise in the sand is 0.5 m. The clay has a bulk unit weight of 19 kN/m3....

  • 3) A geotechnical analysis of a building site reveals that 5 m thick clay layer is...

    3) A geotechnical analysis of a building site reveals that 5 m thick clay layer is underlain by impervious rock. A 50 mm thick sample of the soil is tested in a double drainage apparatus. During the test, 50% of the ultimate consolidation occurs in 30 min. What is the coefficient of consolidation? (b) How long will it take for the 5 m thick layer to achieve 90% of its ultimate primary consolidation?| (a)

  • A new foundation will be built on a 2.5m thick clay layer. The current effective stress in the middle of the clay layer was found to be 200 kPa. During construction, the foundation area will be h...

    A new foundation will be built on a 2.5m thick clay layer. The current effective stress in the middle of the clay layer was found to be 200 kPa. During construction, the foundation area will be heavily loaded with the structure and equipment so that effective stress at the middle of the clay layer will be increased to 800 kPa. After construction is completed, which will take 5 years, the equipment will be removed and the final effective stress in...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT