Question

Supply chain 2 B The Importance of Supplier Management and Measurement: Koito Industries Ltd Sometimes it...

Supply chain 2 B The Importance of Supplier Management and Measurement: Koito Industries Ltd Sometimes it is not enough to merely have a supplier performance measurement system in place. The buyer must also ensure that the performance data is accurate and all encompassing. Any given supplier may be able to manipulate or falsify the product performance data that it provides to its customers. Koito Industries Ltd, a Japanese aircraft seat supplier based in Yokohama, admitted to irregularities in certain safety testing data regarding approximately 150,000 aircraft passenger seats supplied to Airbus SAS and Boeing Co., ultimately impacting some 32 airlines worldwide. Due to growing demand of its aircraft passenger seats that had resulted in extremely tight production schedules, Koito utilised a computer program that created false safety data to meet standards regarding seat safety strength. In addition, some safety tests were omitted in their entirety, and in other cases safety data came from tests conducted on different production lots. The Japanese Transport Ministry determined that Koito altered its computer testing programs so that seat shock levels would read higher than they actually were. Additionally, some aircraft seat designs were unilaterally modified without proper notification. This erroneous safety data was revealed only when a whistle-blower made the information available publicly. As a result of this scandal, the president of Koito Industries made a public apology and promised to retest all of the aircraft seats in question, repairing or replacing by the end of the year those that did not meet safety requirements. In addition, he admitted that falsification activities had dated back to the mid-90s and had been ongoing “organizational culture” emanating from the department which oversaw the testing. The European Aviation Safety Industry (EASI) pulled its approval for Koito seats and contemplated issuing an airworthiness directive (AD). The net effect was that Airbus was unable to meet delivery dates for certain aircraft equipped with Koito-sourced seats. For example, Airbus had to delay delivery of Singapore Airlines’11th A-380 and indicated that about 2 per cent of the global Airbus fleet were equipped with Koito sourced seats. In addition, delivery of Boeing aircraft, such as the 777-300ER, was affected as well. Some of the other airlines affected included: Japan Airlines, Air Canada, KLM, All Nippon Airlines, Thai Airways International, and Scandinavian Airlines. In addition to affecting new aircraft production, substantial delays in retrofitting and updating existing aircraft have also occurred. Due to its large number of affected aircraft, including Koito seats installed in first, business and premium economy, and economy classes, Boeing was affected more severely than was Airbus. Therefore, Boeing sent a supplier development team to Koito to assist in reviewing and redeploying its quality management system. In addition, Boeing has had to work individually with each affected airline customers to ensure that no safety of flight issues existed..

Your airline was one of the affected organisations by the Koito problem. Discuss both the quantitative and qualitative variables you would have considered when measuring the performance of Koito industries to avoid the problems caused. (10 Marks)

0 0
Add a comment Improve this question Transcribed image text
Answer #1

The qualitative and quantitative variables which can be considered while measuring the performance of Koito industries are as follows:

  • Rate of defects in aircraft seat: This will help in keeping a check on the defects raised by the products of a particular supplier
  • Longevity of aircraft seats: The effective lifetime of an aircraft seat, provided by the supplier, can be tracked using this factor. This factor would help in evaluating the overall effectiveness of the supplier’s products
  • Rate of adherence to quality standards: The suppliers’ products must adhere to the legal requirements and compliance
  • Timely delivery of orders: The rate of timely delivery of orders must be taken into consideration
Add a comment
Know the answer?
Add Answer to:
Supply chain 2 B The Importance of Supplier Management and Measurement: Koito Industries Ltd Sometimes it...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • The Importance of Supplier Management and Measurement: Koito Industries Ltd Sometimes it is not enough to...

    The Importance of Supplier Management and Measurement: Koito Industries Ltd Sometimes it is not enough to merely have a supplier performance measurement system in place. The buyer must also ensure that the performance data is accurate and all encompassing. Any given supplier may be able to manipulate or falsify the product performance data that it provides to its customers. Koito Industries Ltd, a Japanese aircraft seat supplier based in Yokohama, admitted to irregularities in certain safety testing data regarding approximately...

  • You are to prepare a two-page (single-spaced) paper based on the case assigned. The case is...

    You are to prepare a two-page (single-spaced) paper based on the case assigned. The case is listed below. Do Not Simply Answer The Questions At the End of The Case. Case Note Format Your case analysis should be in the format of a two page (not counting the reference section) single-spaced Executive Summary. The report should follow the following format in sentence/paragraph form using APA format to cite sources. You are required to cite the textbook and at least one...

  • I would like an executive summary on this case study. Thank you! 73 CHAPTER 2 Fatalie...

    I would like an executive summary on this case study. Thank you! 73 CHAPTER 2 Fatalie The Identification of Opportunities and Theats Fiect the fer any re sich im es Closing Case Plane Wreck: The Airline Industry in 2001-2004 Between 2001 and 2003 players in the global line indos iets at the gate. As a result of such flexible work rules, try lost some $30 billion, more money than the industry Southwest needs only 80 employees to support and fly...

  • What happened on United flight 3411?What service expectations do customers have of airlines such ...

    What happened on United flight 3411?What service expectations do customers have of airlines such as United and How did these expectations develop over time? Thank You! In early April 2017, United Airlines (United), one of the largest airlines in the world, found itself yet again in the middle of a service disaster this time for forcibly dragging a passenger off an overbooked flight. The incident was to become a wake-up call for United, forcing it to ask itself what to...

  • Case Study #1 SUPPLY CHAIN MANAGEMENT AT BOSE CORPORATION Bose Corporation, headquartered in Framingham, Massachusetts, offers...

    Case Study #1 SUPPLY CHAIN MANAGEMENT AT BOSE CORPORATION Bose Corporation, headquartered in Framingham, Massachusetts, offers an excellent example of integrated supply chain management.   Bose, a producer of audio premium speakers used in automobiles, high-fidelity systems, and consumer and commercial broadcasting systems, was founded in 1964 by Dr. Bose of MIT.   Bose currently maintains plants in Massachusetts and Michigan as well as Canada, Mexico, and Ireland.   Its purchasing organization, while decentralized, has some overlap that requires coordination between sites.   It...

  • Case 34 Emirates Airline Emirates Airline was one of the three Middle East carriers that were sin...

    Case 34 Emirates Airline Emirates Airline was one of the three Middle East carriers that were singled out by the largest US airlines in the report that was released on March 5, 2015. The report charged that that the flagship airline of Dubai, along with Etihad Airways and Qatar Airways, had received over $42 billion in government subsidies and tax breaks since 2004. Claiming that this gave an unfair advantage to these state-owned airlines, the US airlines demanded that the...

  • 1. Production Labor Sourcing for Supply Chain Management* Over 75 percent of U.S. manufacturers have been reported to o...

    1. Production Labor Sourcing for Supply Chain Management* Over 75 percent of U.S. manufacturers have been reported to outsource some of their business functions. A shift in offshore outsourcing has returned some business activi- ties to the United States even as cost reduction pressure still challenges most U.S businesses. Brook Medical Supplies (BMS), a manufacturer of medical supplies and ambulatory kits, recently ended outsourcing operations overseas as a competitive mea- sure to improve quality and reduce costs. BMS instead selected...

  • This case is in the book, Operations and Supply Chain Management. I need everyone to help...

    This case is in the book, Operations and Supply Chain Management. I need everyone to help me. thank you so much! 36 44 32 20 24 28 8 12 16 On March 31, 2016, Tesla Motors announced the release of its new Model 3 electric oar. Over 276,000 people from around the world put down $1,000 reservations for the car within three days. First deliveries of the car are expected in late 2017. The innovative new car is a follow-up...

  • How can we assess whether a project is a success or a failure? This case presents...

    How can we assess whether a project is a success or a failure? This case presents two phases of a large business transformation project involving the implementation of an ERP system with the aim of creating an integrated company. The case illustrates some of the challenges associated with integration. It also presents the obstacles facing companies that undertake projects involving large information technology projects. Bombardier and Its Environment Joseph-Armand Bombardier was 15 years old when he built his first snowmobile...

  • TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management...

    TORENTO CONSTRUCTION: ETHICAL CONTRACTING On December 27, 2010, Cary Holmes, manager of the Supply Chain Management (SCM) group at Torento Construction Inc. (NCG), was in his office in Torento, Ontario, trying to organize the thoughts running through his head as a result of a recent bidding to save operating costs at NCG. There was no problem in terms of the final outcome; in fact, the bid was going to result in cost savings of 25 per cent, which was exactly...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT