Question

ETCM 4330 To develop the Blue Creek mine site, a wash pit area needs to be developed on the east side of the overburden. The area is shown on th Assignment #2 g area has been leased on the south side of the site to stock pile e map. A road must be built to transport materials to the temporary working area using materials from the pit excavation. be 20 wide and 4000 long. The existing clayey-silt topsoil will be compacted in a 6 lift requiring 3 passes of avibratorytampingfootcompactar lob efficency is anticipated to be 75% from the gem bearing strata will be deposited on top of the compacted topsoil to a depth of 18 in 6 lifts. Each lift requires 2 passes of the vibratory tamping foot compactor. Job efficiency is anticipated to be 75% Pit excavation will be done with 2 hydraulic excavators having 4 CY buckets, 2 articulating 20 ton dump trucks, and one crawler tractor dozer with a 10 wide, 4 high universal blade What is the expected production for compacting the topsoil base? What is the expected production for compacting the gravel topping? How many BCY of Gravel will be required to construct the road? (assume only 5 depth of gravel to be removed) How many BCY of topsoil will be removed? 1. 2. 3. 4. 4000 N 3800 00, E2000加… 198.001/ 3000 N 2 N 19 19 2000 10.001- N 1000.00, E0.00 1000€- Temporary Work Area NI0.08, E800.00 100.00] (74,001 5000 6000 74.00) 8 srsa 1000 2000 3000 4000 Note: Elevations in brackets [xxx.xx]

Please help, show work.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Let the point with co-ordinates are designed as follows Co-ordinates 0.0 1950.00 2900.00 3800.00 1000.00 800.00 5800.00 5800.Similarly point BC-950ft CD-3905ft DE 3440.93ft EA 1280.62 ft (1) Surface area of the polygon is calculated by dividing the aΔ ABC For We have AB- 5366ft AB -5366.79ft BC-950ft BC-950ft AC 5780ft AC-5780.14ft So we have to calculate S AB +BC+AC 5366.Similarly remaining two triangle will be calculated ACD 7760000ft ADE-2120000f2 ABCDE 2375000+7760000+212000 ARCD 12255000ft8 Since total gold strata to be removed - 4085000 yd Depth of ges bearing strata is calculated as follows Average depth of be

Add a comment
Know the answer?
Add Answer to:
Please help, show work. ETCM 4330 To develop the Blue Creek mine site, a wash pit...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT