Please help, show work.
ETCM 4330 To develop the Blue Creek mine site, a wash pit...
ETCM 4330 To develop the Blue Creek mine site, a wash pit area needs to be developed on the east side of the overburden. The area is shown on th Assignment #2 g area has been leased on the south side of the site to stock pile e map. A road must be built to transport materials to the temporary working area using materials from the pit excavation. be 20' wide and 4000' long. The existing clayey-silt topsoil will be compacted in a 6" lift requiring 3 passes of avibratorytampingfootcompactar lob efficency is anticipated to be 75% from the gem bearing strata will be deposited on top of the compacted topsoil to a depth of 18" in 6" lifts. Each lift requires 2 passes of the vibratory tamping foot compactor. Job efficiency is anticipated to be 75% Pit excavation will be done with 2 hydraulic excavators having 4 CY buckets, 2 articulating 20 ton dump trucks, and one crawler tractor dozer with a 10 wide, 4' high universal blade What is the expected production for compacting the topsoil base? What is the expected production for compacting the gravel topping? How many BCY of Gravel will be required to construct the road? (assume only 5' depth of gravel to be removed) How many BCY of topsoil will be removed? 1. 2. 3. 4. 4000 N 3800 00, E2000加… 198.001/ 3000 N 2 N 19 19 2000 10.001- N 1000.00, E0.00 1000€- Temporary Work Area NI0.08, E800.00 100.00] (74,001 5000 6000 74.00) 8 srsa 1000 2000 3000 4000 Note: Elevations in brackets [xxx.xx]"