this is the full question tho 3. (20%) A certain wind turbine is rated at 5...
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
Zephyr Farming Pty Ltd is considering the purchase of a wind turbine generator in order to generate electricity and to reduce the electricity costs for their offices, which are located in Toowoomba. Currently the business uses 60,000 kilowatt hours (kWh) per quarter (3 months) at an average cost of $0.30 per kwh, supplied by the local coal fired power station. The current required rate of return used to evaluate projects is 6%, with a required payback period of 3 years....
An industrial wind turbine has blades that are 35 m long. On a 20?C day, wind at atmospheric pressure blows with a velocity of 12 m/s , and wind in the turbine wake only has a velocity of 11 m/s .(a) If we assume that all of the kinetic energy lost by the wind is converted to electrical energy by the turbine, then what is the power generated by this turbine? (density is 1.205 kg/m^3)(b) This turbine is rated as...
319 71% 120:12 3. Present worth (PW) 4 pts A wind farm in Victoria consists of rated wind power of [RP] MW, with a capacity factor of [CF]%. The capital cost is about $[cc]/kW rated power. The electricity produced over one year is sold at $[LCOE]/kWh. The farm needs to spend about [OM]% of the capital cost for maintenance every year and at the end of [n] years it is expected to have a salvage value of [S]% of the...
. A typical commercial wind turbine costs approximately $2 million per MW of installed power and requires 5.76 TJ per million dollars of energy to manufacture the wind turbine. (a) Calculate the amount of energy that is consumed (i.e. energy invested) in the manufacture ofa 1.5 MW wind turbine, assuming that turbine manufacture requires 5.76 TJ per million dollars spent. (TJ Tera-joules 1012 joules) (b) If the wind turbine has blades that are 40 meters (radius) long and the average...
Question 2 Portugal has a typical insolation of 1000 W/m2. A solar PV plant located there has an output of 11 MWp. Since the collectors track the sun, the power output is steady at 11 MW from 09:00 to 16:00 Hrs and almost zero outside this time. The lifetime of the system is 20 years with an annual operating cost and total capital investment of €1 million and €75 million, respectively. The cost of capital is 7% p.a. The efficiency...