Question

A quality control agent tested 8 pints of ice cream during the past hour. She found...

A quality control agent tested 8 pints of ice cream during the past hour. She found that one of the pints was not acceptable. Using the relative frequency probability method, find the probability that the next pint tested will be acceptable.

  1. 0.875
  2. 0.125
  3. 0.25
  4. 0.50
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Total number of pints = 8

Number of acceptable pints = 8 - 1 = 7

P(next pint tested will be acceptable) = Number of acceptable pints / Total number of pints tested

= 7/8

= 0.875

Add a comment
Know the answer?
Add Answer to:
A quality control agent tested 8 pints of ice cream during the past hour. She found...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • During the past 8 hour shift, a patient drinks 3/4 orange juice, 0.5L water, and 3...

    During the past 8 hour shift, a patient drinks 3/4 orange juice, 0.5L water, and 3 oz. ice cream bar.              She has continuous IV infusing at the rate of 50 ml/hr. She has a urinary output of 660 ml, 120 diarrhea, and has had 2T of nemesis. what is the patient 8 hour I and O? record using whole numbers for both intake and output.

  • 10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated...

    10. Write a one-page summary of the attached paper? INTRODUCTION Many problems can develop in activated sludge operation that adversely affect effluent quality with origins in the engineering, hydraulic and microbiological components of the process. The real "heart" of the activated sludge system is the development and maintenance of a mixed microbial culture (activated sludge) that treats wastewater and which can be managed. One definition of a wastewater treatment plant operator is a "bug farmer", one who controls the aeration...

  • SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the...

    SYNOPSIS The product manager for coffee development at Kraft Canada must decide whether to introduce the company's new line of single-serve coffee pods or to await results from the product's launch in the United States. Key strategic decisions include choosing the target market to focus on and determining the value proposition to emphasize. Important questions are also raised in regard to how the new product should be branded, the flavors to offer, whether Kraft should use traditional distribution channels or...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT