CALCULATION OF THE SHORTEST PATH |
A |
AE=50 | EF=50+80=130 | FG=130+60=190 | - | |
AE=50 | EB=50+20=70 | BF=70+70=140 | FG=140+60=200 | ||
AB =10 | BF=10+70=80 | FG=80+60=140 | |||
AB =10 | BC=10+20=30 | CF=30+55=85 | FG=85+60 =145 | ||
AC =40 | CF=40+55=95 | FG=95+60=155 | - | ||
AC =40 | CD=40+30=70 | DG=70+20=90 | |||
AD =70 | DG=70+20=90 | - |
SHORTEST PATH IS SHOWN IN COLORS
Given the nodes and travel times below, determine the shortest route from A to G. You...
7. Using Moore's shortest path algorithm, fill the travel time table below and indicate how they are calculated) for a network of 5 nodes and 7 links, where all links are bidirectional except: 2-to-5, 3-to-5, and 4-to-2. Numbers on each link represent travel times. (20 pts.] OD 12 20 CMM
Please answer neatly and correctly! Amy has two ways to travel from her home in Norco to her office in Los Angeles. One is to go via the 10 Freeway, and the other is to go via 60 Freeway. In order to determine which way she should travel on a daily basis, Amy has recorded the travel times for samples of eight trips via the 10 Freeway and eight trips via the 60 Freeway. The following table gives the travel...
Amy has two ways to travel from her home in Norco to her office in Los Angeles. One is to go via the 10 Freeway, and the other is to go via 60 Freeway. In order to determine which way she should travel on a daily basis, Amy has recorded the travel times for samples of ten trips via the 10 Freeway and ten trips via the 60 Freeway. The following table gives the travel times in minutes) for the...
Problem 3 (Chapter 7: Transport Decisions) Transcontinental Trucking Company wishes to route a shipment from Buffalo to Duluth over major highways. Because time and distance are closely related, the company dispatcher would like to find the shortest route. A schematic network of the major highway links and mileage between city pairs is show in Figure 7-20. Find the shortest route through the network by using the shortest route method. (Hint: View Module 2 Ch07 Part 1 Slide 8 To 11...
Problem 3 (Chapter 7: Transport Decisions) Transcontinental Trucking Company wishes to route a shipment from Buffalo to Duluth over major highways. Because time and distance are closely related, the company dispatcher would like to find the shortest route. A schematic network of the major highway links and mileage between city pairs is show in Figure 7-20. Find the shortest route through the network by using the shortest route method (Hint View Module 2 Ch07 Pert 1 Slide 8 To !!...
Amy has two ways to travel from her home in Norco to her office in Los Angeles. One is to go via the 10 Freeway, and the other is to go via 60 Freeway. In order to determine which way she should travel on a daily basis, Amy has recorded the travel times for samples of ten trips via the 10 Freeway and ten trips via the 60 Freeway. The following table gives the travel times (in minutes) for the...
Twenty-four workers were surveyed about how long it takes them to travel to work each day. The resulting histogram is given below: 11 10 9 CON Workers 6 3 20 60 70 30 40 50 Minutes Which of the following is not true? Four workers stated that it takes them 30 to 40 minutes to reach work. Two workers travel for more than one hour to reach work. It takes 10 workers around 40 to 70 minutes to reach work....
|Determine the displacements of nodes of the spring system shown below K=40 N/mm WW Кз 1 Fi= 60 N 50 N WWw 80 N/mm Ww K2= 50 N/mm |Determine the displacements of nodes of the spring system shown below K=40 N/mm WW Кз 1 Fi= 60 N 50 N WWw 80 N/mm Ww K2= 50 N/mm
Ekle Tasarım Te Duzen 1. Determine the shortest route from node 1 (origin) to node 12 (destination) for the following network Distances are given along the network branches: 5 2 10 8 6 6 3 2 2 12 3 3 4 3 7 9 8 9 7 6 10
6. [20 pts.] Below is the final P matrix after applying Floyd's all pairs shortest path algorith on a graph with nodes (A, B, C, D, E, F, G, H). In the matrix below 1 corresponds o 0 5 0 2 0 5 5 Determine the shortest path between nodes D and F. a) 6. [20 pts.] Below is the final P matrix after applying Floyd's all pairs shortest path algorith on a graph with nodes (A, B, C, D,...