Question

Hello,

Need to see the solution. How they got these numbers.

Roy Creasey Enterprises, a machine shop, is planning to move to a new larger location. The new building will be 60 feet long

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Based on the flows shown in the matrix, it is likely that the processes Material and Welding are in rooms next to each other as they have the highest number of moves between each other.

(Moves between Material and Welding = 100+25 = 125)

.

Based on the flows shown in the matrix, it is likely that the processes Drills and Grinders are in rooms next to each other as they have the second highest number of moves between each other.

(Moves between Drills and Grinders = 50+70 = 120)

.

The cumulative distance baased on the overall movement of material between processes for this layout

= Movement between Benders and Materials x Distance between Benders and Materials

+ Movement between Benders and Welding x Distance between Benders and Welding

+ Movement between Benders and Drills x Distance between Benders and Drills

+ Movement between Benders and Grinders x Distance between Benders and Grinders

+ Movement between Benders and Lathes x Distance between Benders and Lathes

+ Movement between Materials and Welding x Distance between Materials and Welding

+ Movement between Materials and Drills x Distance between Materials and Drills

+ Movement between Materials and Grinders x Distance between Materials and Grinders

+ Movement between Materials and Lathes x Distance between Materials and Lathes

+ Movement between Welding and Drills x Distance between Welding and Drills

+ Movement between Welding and Grinders x Distance between Welding and Grinders

+ Movement between Welding and Lathes x Distance between Welding and Lathes

+ Movement between Drills and Grinders x Distance between Drills and Grinders

+ Movement between Drills and Lathes x Distance between Drills and Lathes

+ Movement between Grinders and Lathes x Distance between Grinders and Lathes

= (55+5)*20 + (0+0)*40 + (15+0)*20 + (0+0)*40 +(0+0)*60 + (100+25)*20 + (55+25)*40 + (0+55)*20 + (0+0)*40 + (0+0)60 + (0+0)*40 + (45+30)*20 + (50+70)*20 + (0+0)*40 + (20+0)*20

= 12,600 feet

Add a comment
Know the answer?
Add Answer to:
Hello, Need to see the solution. How they got these numbers. Roy Creasey Enterprises, a machine...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Roy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The...

    Roy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The new building will be 60 feet long by 40 feet wide. Creasey envisions the building as having six distinct production areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic. Room Room Room Room Room Room 5 His foreman has completed a...

  • Roy Creasey​ Enterprises, a machine​ shop, is planning to move to a​ new, larger location. The new building will be 60 f...

    Roy Creasey​ Enterprises, a machine​ shop, is planning to move to a​ new, larger location. The new building will be 60 feet long by 40 feet wide. Creasey envisions the building as having six distinct production​ areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic. Room 1Room 2 Room 3 Room 4 Room 5 Room 6 His...

  • .. 9.4 Roy Creasey Enterprises, a machine shop, is planning to move to a new larger...

    .. 9.4 Roy Creasey Enterprises, a machine shop, is planning to move to a new larger location. The new building will be 60 feet Tong by 40 feet wide. Creasey envisions the building as having six distinct production areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic Building Schematic (with work areas 1-6) His foreman has completed...

  • on the work are shown in the buty nithe number of loads of material that have...

    on the work are shown in the buty nithe number of loads of material that have moved from one process to another in the current building. This information is contained in the flow matrix an the left below. Finally, Cransay alsa davnoped a matrix ha indicate distances Roy Cressay Enterprises, a machine shop, is planning to move to a new larger location. The new building wil be 60 feet long by 40 feet wide. Creasey envisions the building as having...

  • Hello, I need to see the solution, how they got these numbers? Will appreciate help. The...

    Hello, I need to see the solution, how they got these numbers? Will appreciate help. The Action Toy Company has decided to manufacture a new train set, the production of which is broken into six steps. The demand for the train is 4,600 units per 40-hour workweek: Predecessors Task A B С D E F Performance Time (seconds) 22 27 14 15 10 28 А A А B, C DE This exercise only contains parts b, c, d, e, and...

  • Hello, I am looking to understand and see the solution to the question 2 for Chapter...

    Hello, I am looking to understand and see the solution to the question 2 for Chapter 16 - Case 1. Could you please help? Cases Questions Case 16-1 Hospital Supply, Inc.* Hospital Supply, Inc., produced hydraulic hoists that were used by hospitals to move bedridden patients. * Copyright © by Michael W. Maher, University of California, Davis the costs of manufacturing and marketing hydraulic hoists at the company's normal volume of 3,000 units The following questions refer only to the...

  • please I need help with this one question. Titration Procedure Prepare your starch solution by dissolving...

    please I need help with this one question. Titration Procedure Prepare your starch solution by dissolving 0.040g of vitex starch in 20 mL of water. Prepare your 3%diluted commercial bleach solution (3% of the concentration of the commercial bleach, by volume.) Do not discard as you will use this solution for each of your trials. Dependingonyourinstructor’schosenmethod;deliverexactly3mLofcommercialbleach solution to a 100mL volumetric flask using the burette that contains the class’s supply of bleach, or pour some from the bottle into a...

  • Working on the questions at the end of this lab report (see above). I need help answering questio...

    Working on the questions at the end of this lab report (see above). I need help answering questions 2, 3, and 4 completely and thoroughly. Thank you! s, until the I hexano 1 clean disti CYCLOHEXENE from CYCLOHEXANOL be dehydrated with solfuric acid to yield cyclohexene and waterf Add a 0°C (record ct and cal H,SO + H20 ainer. s in purification of any crude product are (a) the preliminary separation of the product from the reaction mixture by distillation...

  • Programming Traversal Methods in C++ (depth first & breadth first) Need solution ASAP any help is...

    Programming Traversal Methods in C++ (depth first & breadth first) Need solution ASAP any help is much appreciated. read a set of data representing a directed, unweighted graph build an in-memory graph structure using the data display the graph using depth-first traversal display the graph using breadth-first traversal Input data - The data consists of records like this: 16 3 15 4 -1 This represents a vertex 16 with neighbors 3, 15, and 4. The -1 is the indicator that...

  • Creating a simple graph in C++; need solution ASAP. EDIT: Pls comment letting me know what...

    Creating a simple graph in C++; need solution ASAP. EDIT: Pls comment letting me know what other information you need rather than just "..." Thank you. Here is the assignment: In this final practice problem, you’ll: read a set of data representing a directed, unweighted graph build an in-memory graph structure using the data display the graph using depth-first traversal display the graph using breadth-first traversal Input data - The data consists of records like this: 16 3 15 4...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT