Question 24 1 pts You are considering the following two mutually exclusive projects. Which project(s) should...
3. You are considering two mutually exclusive projects with the following cash flows. Which project(s) should you accept if the discount rate is 8.5 percent? What if the discount rate is 13 percent? Year Project A Project B -$80,000 -$80,000 31,000 31,000 0 31,000 110,000 A. accept project A as it always has the higher NPV B. accept project B as it always has the higher NPV C. accept A at 8.5 percent and B at 13 percent D. accept...
You are considering the following two mutually exclusive projects. Which project(s) should be recommended? Project A Project B Year Cash Flow Year Cash Flow 0 -$75,000 0 -$70,000 1 $19,000 1 $10,000 2 $48,000 2 $16,000 3 $12,000 3 $72,000 Required rate of return: 10 percent (for A) 13 percent (for B)
Suppose your firm is considering two mutually exclusive, required projects with the cash flows shown below. The required rate of return on projects of both of their risk class is 11 percent, and that the maximum allowable payback and discounted payback statistic for the projects are 2 and 3 years, respectively. 0 3 8000 1 28.000 2 48.000 19.000 Time: Project A Cash Flow Project B Cash Flow -48,000 28,000 2,000 68,000 Use the payback decision rule to evaluate these...
Consider Project Theta, its time line of cash flows, and one of the project IRRs: Year....................0.............1............2............IRR Cash Flow......($200).....$850....($700)......15% What is the best decision for Project Theta (accept or reject) if the project’s required rate of return is 15% and why? a. Accept the project because the payback is short b. Accept the project because the NPV is greater than zero c. Reject the project because the IRR is less than the required rate of return d. Reject the project because...
Suppose your firm is considering two mutually exclusive, required projects with the cash flows shown below. The required rate of return on projects of both of their risk class is 8 percent, and that the maximum allowable payback and discounted payback statistic for the projects are 2 and 3 years, respectively. Time: 0123 Project -35,000 25,000 45,000 16,000 A Cash Flow Project -45,000 25,000 35,000 B Cash Flow Use the NPV decision rule to evaluate these projects; which one(s) should...
PLEASE ANSWER A-D WITH WORK, THANK YOU! 2. Consider the following two mutually exclusive projects: Year Cash Flow A Cash Flow B 0 $-318,844 $-27,476 1 $27,700 $9,057 2 $56,000 $10,536 3 $55,000 $11,849 4 $399,000 $13,814 The required return is 15 percent for both projects. Based on NPV rule, Reject or Accept? Based on IRR rule, Reject or Accept? Based on PI, Accept or Reject? Which rule in this case would be preferred?
Suppose your firm is considering two mutually exclusive, required projects with the cash flows shown below. The required rate of return on projects of both of their risk class is 8 percent, and that the maximum allowable payback and discounted payback statistic for the projects are 2 and 3 years, respectively. Time: 0 1 2 3 Project A Cash Flow -30,000 20,000 40,000 11,000 Project B Cash Flow -40,000 20,000 30,000 60,000 Use the NPV decision rule to evaluate these...
Suppose your firm is considering two mutually exclusive, required projects with the cash flows shown below. The required rate of return on projects of both of their risk class is 10 percent, and that the maximum allowable payback and discounted payback statistic for the projects are 2 and 3 years, respectively. Time: 0 1 2 3 Project A Cash Flow -37,000 27,000 47,000 18,000 Project B Cash Flow -47,000 27,000 37,000 67,000 Use the NPV decision rule to evaluate these...
Suppose your firm is considering two mutually exclusive, required projects with the cash flows shown below. The required rate of return on projects of both of their risk class is 11 percent, and that the maximum allowable payback and discounted payback statistic for the projects are 2 and 3 years, respectively. 0 Time: 43,000 Project A 33,000 23,000 Flow Project B 43,000 23,000 33,000 63,000 Cash Flow Use the discounted payback decision rule to evaluate these projects; which one(s) should...
Use the following for Questions 1 - 5: You are considering two mutually exclusive projects, A and B. Project A costs $60,000 and generates cash flows of $9,000 for 10 years. Project B costs $60,000 and generates cash flows of $2,000 for seven years and then cash flows of $27,000 for three years. Report rates in percentage form to two decimal places i.e. 10.03% not 10% Question 1 (3 points) Calculate what discount rate would make you indifferent between choosing...