Question

Can you walk me through the steps, I'm getting lost on how they get 49/144 and how they get 121/144

Solve by completing the square. 6x2 + 7x=3 To complete the square, the coefficient of x2 must be 1. What number should each s

0 0
Add a comment Improve this question Transcribed image text
Know the answer?
Add Answer to:
Can you walk me through the steps, I'm getting lost on how they get 49/144 and...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Question 10 / Explain in detail CHu Reviey Solve using the square root prope Hr), of...

    Question 10 / Explain in detail CHu Reviey Solve using the square root prope Hr), of the b given by hit a) How lo 5) (b - 3)2 49 6 (6y + 7)2 16 t? b) How 4)2-2 (9.1-9.2) Kee solving quad 9) distance between the points (-8, 3) and (-12,5 completing tions using To A rectangle has a length of 5V2 in and a width of 4 in. How long is its diagonal? Complete the square for each expression...

  • Can someone please walk through the steps on getting the final structure (boxed towards top)? 7...

    Can someone please walk through the steps on getting the final structure (boxed towards top)? 7 IR Spectrum (liquid film) groups: -- 1712 12771254 c=0 4000 3000 1200 800 2000 1600 V (cm) ;C=0 1001 121 Mass Spectrum 80 601 149 % of base peak 12-7=5 M+ 194 40 20 Label C1, H₂ 40₃ 40 80 200 240 280 120 160 m/e 13C NMR Spectrum (50.0 MHz, CDCI, solution) CH CM (Из CH3 Resolves into two signals at higher field...

  • Can someone walk me through manual steps to solve e, f, and g? The Farmer's American...

    Can someone walk me through manual steps to solve e, f, and g? The Farmer's American Bank of Leesburg is planning to install a new computerized accounts system. Bank management has determined the activities required to complete the project, the precedence relationships of the activities, and activity time estimates, as shown in the following table: Time Estimates (weeks) Activity Activity Activity Description Position recruiting System development Predecessor a C A 5 17 ? -- 7 3 12 15 System training...

  • can someone assist me and tell me what I'm missing. I managed to get it this...

    can someone assist me and tell me what I'm missing. I managed to get it this far but still missing two parts to complete it. CENGAGE MINDTAP Programming Exercise 6-4 Tasks main.cpp + 1 #include <iostream r with successful Uses piand 2 #include <cnath> output 5,00 out of 10.00 3 using nanespace std; 4 5 const double PI = 3.1419; 2 out of 4 checks passed. Review 6 the results below for more details. 7 int main() 8 ( Checks...

  • I'm only missing this REQUIREMENT 8. Please let me know how you get the number that...

    I'm only missing this REQUIREMENT 8. Please let me know how you get the number that you multiply with the PDOHR(120%) for Direct Material Cost. Show all calculations please and where you get the numbers. Selected T-accounts of Moore Company are given below for the just completed year: Manufacturing Overhead 203,800 Credits Debits Bal. 1/1 Debits Bal. 12/31 Raw Materials 28,000 Credits 146,000 38,000 Work in Process 33,000 Credits 103,000 189,000 226,800 509,000 Debits Bal. 1/1 Direct materials Direct labor...

  • please show steps cleary 7. Solve the following equations for x: b)3(2x-5)-(2-3x)--2+4x 9 15 5 c)H...

    please show steps cleary 7. Solve the following equations for x: b)3(2x-5)-(2-3x)--2+4x 9 15 5 c)H x-μ e) x3+8x2+15x-0 1 (4x-5)2-5-20 (use the square-root method) g) Solve using the quadratic formula: 3x2+2x -8-0. Show your steps clearly. x+4x-8-0. Show your steps clearly h) Solve by completing the Square: 8. Determine an equation for the line a) with slope of 5/3 and y-intercept of 5: b) with slope 7/6 and passing through the point (6.2) parallel to the line in #...

  • can i get help answering both these questions please i am stuck. Construct a 95% confidence...

    can i get help answering both these questions please i am stuck. Construct a 95% confidence interval for Hy with the sample statistics for mean cholesterol content of a hamburger from two fast food chains and confidence interval construction formula below. Assume the populations are approximately normal with unequal variances Stats X = 68 mg, s, = 3.72 mg, n = 14 x = 53 mg, s, -2.13 mg, n, 16 - + ng ni my Confidence interval when (*-*)-4,...

  • need help solving and checking answers Evaluate each function for the given value of x, and...

    need help solving and checking answers Evaluate each function for the given value of x, and write the input and output as an ordered pair. Need help? Check out these resources: http://virtualnerd.com/algebra 1/linear-equation-analysis/point- slope-standard-form/standard-form-examples/write-linear- equation standard-form-slope-point 27. f(x) = 3x - 7 for x = 6 28.g(x) = 9x - 5 for x = 3 29.h(x) = 12x for x = 4 30.t(x) = 8x - 5 for x = 7 Linear Functions and Slope Intercept Form You can use...

  • This is the sequence 1,3,6,10,15 the pattern is addin 1 more than last time but what is the name for this pattern These are called the triangular numbers The sequence is 1 3=1+2 6=1+2+3 10=1+2+3+4 15=1+2+3+4+5 You can also observe this pattern

    This is the sequence 1,3,6,10,15 the pattern is addin 1 more than last time but what is the name for this patternThese are called the triangular numbers The sequence is 1 3=1+2 6=1+2+3 10=1+2+3+4 15=1+2+3+4+5 You can also observe this pattern x _________ x xx __________ x xx xxx __________ x xx xxx xxxx to see why they're called triangular numbers. I think the Pythagoreans (around 700 B.C.E.) were the ones who gave them this name. I do know the...

  • Battin how many additional consecutiv hits h Jeter would have needed to raise his batting average...

    Please help me on questions 40, 59, and 62. battin how many additional consecutiv hits h Jeter would have needed to raise his batting average in 2004 to that of his average in 2001. b. Write and solve an equatioll SHORTSTOP YEAR 2001 2002 2003 2004 191 191 156 48 188 c. What if.. How many additional hits in a row would Jeter have needed to raise his batting average in 2003 to .500? Check your answer for reasonableness. Solve...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT