(b) Compute the cycle time and production rate for a single-machine robotic cell for an 8-...
(a) An overhead trolley conveyor is configured as a continuous closed loop. The delivery loop has a length of 120 m and the return loop 80 m. All parts loaded at the load station are unloaded at the unload station. Each hook on the conveyor can hold one part and the hooks are separated by 4 m. Conveyor speed 1.25 m/s. Determine: (i) maximum number of parts in the conveyor system, (ii) parts flow rate; and (ii) maximum loading and...
Question 1 A turning operation is carried out on aluminum. Based on the specific energy values in Table 20.2, determine material removal rate and cutting power in the operation under the following sets of cutting conditions: (a) Cutting speed 5.6 m/s, feed 0.25 mm/rev, and depth of cut 2.0 mm; and (b) cutting speed- 1.3 m/s, feed 0.75 mm/rev, and depth 4.0 mm. Question 2 Consider a turning operation performed on steel whose hardness 225 HB at a cutting speed...
The Burger Dome waiting line model studies the waiting time of customers at its fast-food restaurant. Burger Dome's single-server waiting line system has an arrival rate of 0.75 customers per minute and a service rate of 1 customer per minute. Adapt the Black Sheep Scarves spreadsheet shown below to simulate the operation of this waiting line. Make sure to use the random values for both interarrival and service times generated in the worksheet_12-23. Assuming that customer arrivals follow a Poisson...