GIVEN DATA
external load applied (p) = 80 kips
bolt stiffness ( Kb ) = 2.6(10^6) Ibf / in
Member stiffness (Km) = 15(10^6) Ibf / in
Diameter of bolts ( d ) = 1/2 in - 13 UNC grade 8
Number of bolts = 6
assumptions
for unified screw threads UNC and UNF
tensile stress area ( A ) = 0.1419 in^2
SAE specifications for steel bolts for grade 8
we have
Minimum proof strength ( Sp) = 120 kpsi
Minimum tensile strength (St) = 150 Kpsi
Load Bolt (p) = external load / number of bolts = 80 / 6 = 13.33 kips
Given the following values
Fi = 75%* Sp*At = (0.75*120*0.1419 ) = 12.771 kip
Preload stress
αi = 0.75Sp = 0.75 * 120 = 90 kpsi
stiffness constant
C = = 2.6/17.6=0.147
A) yielding factor of safety
nP =
nP = 120*0.1419/((0.147*80)+12.771)=50.28/24.531=2.05Ans
Yielding factor of safety =2.05
PLEASE PLEASE BE SURE THE ANSWER IS RIGHT, THANKS ! Required information For a bolted assembly...
PLEASE PLEASE BE SURE THE ANSWER IS RIGHT, THANKS Required information For a bolted assembly with six bolts, the stiffness of each bolt is kb = 2.6 Mlbf/in and the stiffness of the members is km = 15 Mibf/in per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade 8 bolts with rolled threads. Assume the...
PLEASE PLEASE BE SURE THE ANSWER IS RIGHT, THANKS Required information For a bolted assembly with six bolts, the stiffness of each bolt is kb = 2.6 Mlbf/in and the stiffness of the members is = 15 Mlbf/in per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade 8 bolts with rolled threads. Assume the bolts...
Required information For a bolted assembly with six bolts, the stiffness of each bolt is kb=1.8 Mibflin and the stiffness of the members is km=16 Mlbflin per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade 8 bolts with rolled threads. Assume the bolts are preloaded to 75 percent of the proof load. Determine the yielding...
need help on all parts please and thank you ! Required information For a bolted assembly with six bolts, the stiffness of each bolt is kb = 1.8 Mlbt/in and the stiffness of the members is km- 13 Mibf/in per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade 8 bolts with rolled threads. Assume the...
Required Information For a bolted assembly with six bolts, the stiffness of each bolt is kb - 24 Mibf/in and the stiffness of the members is km 13 Mlbflin per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade 8 bolts with rolled threads. Assume the bolts are preloaded to 75 percent of the proof load....
I need help Please, third time posting this question and i keep getting the wrong answer. Required information For a bolted assembly with six bolts, the stiffness of each bolt is kb = 2.6 Mlbf/in and the stiffness of the members is km = 15 Mlbf/in per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in-13 UNC grade...
4) [30 pts] Dynamic bolt factor of safety For a bolted assembly with N = 6 bolts, the stiffness of each bolt is kn = 2 Mibflin and the stiffness of the members is km = 13 Mlbf/in per bolt. A repeated external load of W = 76 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use in-13 UNC grade 8 bolts with rolled threads. Assume...
4) [30 pts] Dynamic bolt factor of safety For a bolted assembly with N = 6 bolts, the stiffness of each bolt is ko = 2 Mibflin and the stiffness of the members is km = 13 Mlbf/in per bolt. A repeated external load of W = 76 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use / in-13 UNC grade 8 bolts with rolled threads....
Please answer this question throughly. Thanks. For a bolted assembly with six bolts, the stiffness of each bolt is kb = 3M1bf/in and the stiffness of the members is km 12Mlbf/in per bolt. An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use in-13 UNC grade 8 bolts with rolled threads. Assume the bolts are preloaded to 75 percent of the proof...
PLEASE PLEASE BE SURE THE ANSWER IS RIGHT, THANKS. Required information For a bolted assembly with eight bolts, the stiffness of each bolt is kb = 1 MN/mm and the stiffness of the members is km = 2.8 MN/mm per bolt. The joint is subject to occasional disassembly for maintenance and should be preloaded accordingly. Assume the external load is equally distributed to all the bolts. It has been determined to use M6 x 1 class 5.8 bolts with rolled...