Reliability of German set = 0.95*0.95 =0.9025
Reliability of US set =0.9x0.9=0.81
Reliability of China set =0.85*0.85 =0.7225
Reliability of a combination where German set is used as main set and other two as backup
= 1- [ (1-0.9025)*(1-0.81)*(1-0.7225)]
= 1- [ 0.0975*0.19*0.2775]
=1-0.00514 =0.99486
Reliability of system of valves = 1-(1-0.95)*(1-0.95) =0.9975
Resultant reliability = 0.99486*0.9975 =0.99237
Diagram
Problem 2: Consider an assembly of 3 major components: electromotor (EM), pump (PIP) and valve (V/V)....
Problem 2: Consider an assembly of 3 major components: electromotor (EM), pump (P/P) and valve (V/V). The EM and pump come always together. EM P/P V/v Valve is separate We buy the EM-Pump assembly from Germany, China, and USA. We run the German set and the others from USA and China 'as backup. The reliability given by the manufacturer from these countries are: Germany: 0.95 for each of the EM and the Pump! USA: 0.90 for each of the EM...