Temperature is used to measure the output of a production process. When the process is in...

Temperature is used to measure the output of a production process. When the process is in control, the mean of the process is

μ = 123.5

and the standard deviation is

σ = 0.3.

(a)

Compute the upper and lower control limits if samples of size 6 are to be used. (Round your answers to two decimal places.)

UCL= LCL=

Construct the

x

chart for this process.

A graph shows three horizontal lines. The horizontal axis is labeled Sample Number and ranges from 0 to 10. The vertical axis is labeled Sample Mean x bar and ranges from 122.75 to 124.50. The bottom line is labeled LCL and intersects the vertical axis at about 123.13. The middle line intersects the vertical axis at 123.50. The top line is labeled UCL and intersects the vertical axis at about 123.87. The entire region between the LCL line and the UCL line is shaded.

A graph shows three horizontal lines. The horizontal axis is labeled Sample Number and ranges from 0 to 10. The vertical axis is labeled Sample Mean x bar and ranges from 122.75 to 124.50. The bottom line is labeled LCL and intersects the vertical axis at about 123.35. The middle line intersects the vertical axis at 123.50. The top line is labeled UCL and intersects the vertical axis at about 123.65. The entire region between the LCL line and the UCL line is shaded.

A graph shows three horizontal lines. The horizontal axis is labeled Sample Number and ranges from 0 to 10. The vertical axis is labeled Sample Mean x bar and ranges from 122.75 to 124.50. The bottom line is labeled LCL and intersects the vertical axis at about 123.02. The middle line intersects the vertical axis at 123.50. The top line is labeled UCL and intersects the vertical axis at about 123.98. The entire region between the LCL line and the UCL line is shaded.

A graph shows three horizontal lines. The horizontal axis is labeled Sample Number and ranges from 0 to 10. The vertical axis is labeled Sample Mean x bar and ranges from 122.75 to 124.50. The bottom line is labeled LCL and intersects the vertical axis at about 123.24. The middle line intersects the vertical axis at 123.50. The top line is labeled UCL and intersects the vertical axis at about 123.76. The entire region between the LCL line and the UCL line is shaded.


(b)

Consider a sample providing the following data.

123.8 123.2 124.1 123.7 123.4 124.2

Compute the mean for this sample. (Round your answer to two decimal places.)

x

=  

Is the process in control for this sample?

Yes, the process is in control for the sample.No, the process is out of control for the sample.     

(c)

Consider a sample providing the following data.

124.3 123.7 123.6 124.2 124.5 129.0

Compute the mean for this sample. (Round your answer to two decimal places.)

x

=

Is the process in control for this sample?

Yes, the process is in control for the sample.No, the process is out of control for the sample.    

0 0
Add a comment Improve this question Transcribed image text
Answer #1

UCL - M + 3x Zn ANSWER a) Central line M=123.55-0.3, n=6 123.5+ 3 x 0.3 V6 = 123.5 +0.367 =123.867 LIL - M - 3x/ou - 123.5 -

Add a comment
Know the answer?
Add Answer to:
Temperature is used to measure the output of a production process. When the process is in...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Temperature is used to measure the output of a production process. When the process is in...

    Temperature is used to measure the output of a production process. When the process is in control, the mean of the process is p - 124.5 and the standard deviation is o -0.3. (a) Compute the upper and lower control limits if samples of size 6 are to be used. (Round your answers to two decimal places.) UCL - LCL = UCI UCL Construct the chart for this process 125.50+ 125.25 125.00 124.75 124.50 124.25 124.00 123.75 UCL Sample Mean...

  • Temperature is used to measure the output of a production process. When the process is in...

    Temperature is used to measure the output of a production process. When the process is in control, the mean of the process is L= 122.5 and the standard deviation is o 0.4 (a) Compute the upper and lower control limits if samples of size 6 are to be used. (Round your answers to two decimal places.) UCL LCL Construct the x chart for this process. 123.50t 123.50t UCL 123.25- 123.25 UCL 123.00 123.00 122.75 122.75 122.50 122.50 122.25t 122.25 122.00...

  • Temperature is used to measure the output of a production process. When the process is in...

    Temperature is used to measure the output of a production process. When the process is in control, the mean of the process is μ = 126.5 and the standard deviation is σ = 0.4. (a)Compute the upper and lower control limits if samples of size 6 are to be used. (Round your answers to two decimal places.) UCL= LCL= Construct the x bar chart for this process. (b) Consider a sample providing the following data. 126.8 126.2 127.1 126.7 126.4...

  • Q7 A-C Q7. A production process that is in control has a population mean (u )...

    Q7 A-C Q7. A production process that is in control has a population mean (u ) of 10 and a standard deviation (c) of 0.3. Sample of size 9 are used for the inspection process. a) (3pt) Determine the lower control limit (LCL). Please show your work for full credit. b) (2pt) Determine the center line/limit. c) (3pt) Determine the upper control limit (UCL). Please show your work for full credit.

  • The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen...

    The Money Pit Mortgage Company is interested in monitoring the performance of the mortgage process. Fifteen samples of five completed mortgage transactions each were taken during a period when the process was believed to be in control. The times to complete the transactions were measured. The means and ranges of the mortgage process transaction​ times, measured in​ days, are as​ follows: b. Sample123456789 10 11 12 13 14 15 Mean 5 103 7 8 13 14 9 9 9 5...

  • A company that makes car parts. The company control its production process by periodically taking a...

    A company that makes car parts. The company control its production process by periodically taking a sample of 100 units from the production line. Each product is inspected for defective features. Control limits are developed using three standard deviations from the mean as the limit. During the last 12 samples taken, the proportion of defective items per sample was recorded as follows: 0.01 0.01 0.0 0.04 0.01 0.01 0.00 0.01 0.02 0.02 0.03 0.03 a. Determine the mean proportion defective,...

  • A) Set the control limits for the process for the x(bar) chart when the maching is working proper...

    round to 3 decimal places ? A) Set the control limits for the process for the x(bar) chart when the maching is working properly UCL-x-? grams (round to two decimal places) LCL-x grams (round to two decimal places) B) Set the control limits for this process for the R-chart. UCLrgrams (round to two decimal places) LCLr grams (round to two decimal places) Refer to the table Factors for Computing Control Chart Limits (3 sigma) for this problem. Your supervisor, Lisa...

  • The manager of an assembly line took five samples each with six observations, under ideal conditions...

    The manager of an assembly line took five samples each with six observations, under ideal conditions to develop control limits for an X-bar chart and R-chart. The mean and the range for each sample is shown in the table below.    Sample Number         Sample Mean       Sample Range             1                          2.18                          0.33             2                          2.12                    0.38             3                          1.88                    0.44             4                          1.99                    0.38             5                          2.02                    0.32 Calculate the UCL and LCL for the X-bar Chart and...

  • A lumber company makes plywood for residential and commercial construction. Every hour, five pieces of plywood...

    A lumber company makes plywood for residential and commercial construction. Every hour, five pieces of plywood are selected and the thicknesses are measured. The accompanying graphs are the control charts for the first 20 subgroup Suppose this process remained in control for the next 40 hours. The accompanying data are the thickness measurements for hours 41 through 43. Based on these data and the two control charts, what should be concluded about the pro Has the process gone out of...

  • 1- KALI, Inc., manufactures home appliances that are marketed under a variety of trade names. However,...

    1- KALI, Inc., manufactures home appliances that are marketed under a variety of trade names. However, KALI does not manufacture every component used in its products. Several components are purchased directly from suppliers. For example, one of the components that KALI purchases for use in home air conditioners is an overload protector, a device that turns off the compressor if it overheats. The compressor can be seriously damaged if the overload protector does not function properly, and therefore KALI is...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT