1. The capacity of core manufacturing is = 2 x 14 x 50 carats/hour= 1400 carats/hour
2. The capacity of Ceramic tube manufacturing is = 3 x 16 x 50 carats/hour=2400 carats/hour
3. The capacity of cell assembly is = ((2/3) x 60) x 50 carats/hour = 2000 carats/hour
4. The capacity of pressing is = 22 x 50 carats/hour = 1100 carats/hour
5. The capacity of separation is = ((2/55) x 3600) x 50 carats/ hour = 6545.455 carats/hour . As there are no options match. The correct option is None of these.
Abrasive Corp. (Use this information for the next 6 questions) Abrasives Corp. manufactures industrial diamonds for...
Abrasives Corp. manufactures industrial diamonds for use in the cutting, machining and drilling industries. They produce the highest quality diamonds in the industry, and can sell any amount they can produce for $5 per carat. Abrasive Corp runs 24 hours per day, 7 days per week. Abrasive Corp.’s production process has six steps: Graphite Core Manufacturing: There are two machines, each capable of producing 14 cores per hour. Ceramic Tube Manufacturing: There are three machines, each capable of producing 16...