Use the applet "Mean Control Chart: Out of Control" to answer the following questions. (a) Set...

Use the applet "Mean Control Chart: Out of Control" to answer the following questions.

(a) Set the slider below the graph to 16.05 and push 'Restart'. Observe the simulation of the process. Push 'Restart' several more times. What do you notice about the behavior of the process before and after Period 7?

The sample means are outside the control limits at first but fall within the limits after Period 7.

The sample means are within the control limits at first, but fall outside the limits after Period 7.    

The sample means almost always fall within the control limits for all Periods.

The sample means consistently fall outside the control limits for all Periods.

(b) Set the slider below the graph to 16.21 and push 'Restart'. Observe the simulation of the process. Push 'Restart' several more times. What do you notice about the behavior of the process before and after Period 7?

The sample means are outside the control limits at first but fall within the limits after Period 7.

The sample means are within the control limits at first, but fall outside the limits after Period 7.   

The sample means almost always fall within the control limits for all Periods.

The sample means consistently fall outside the control limits for all Periods.

0 0
Add a comment Improve this question Transcribed image text
Answer #1

(a) The sample means almost always fall within the control limits for all Periods.

(b) The sample means are within the control limits at first, but fall outside the limits after Period 7.

Add a comment
Know the answer?
Add Answer to:
Use the applet "Mean Control Chart: Out of Control" to answer the following questions. (a) Set...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • A control chart is used for monitoring a process mean ( 7 ) that is normally...

    A control chart is used for monitoring a process mean ( 7 ) that is normally distributed with a mean of u and a standard deviation of o, and the sample size is n = 5. A 3-sigma limit (u +30z) is used as control limits. Two decision rules are given here. Rule 1: If one or more of the next seven samples yield values of the sample average that fall outside the control limits, conclude that the process is...

  • A control chart is used for monitoring a process meanl (X) that is normally distributed with a mean of μ and a standard...

    A control chart is used for monitoring a process meanl (X) that is normally distributed with a mean of μ and a standard deviation of σχ , and the sample size is n-5. А 3-sigma limit (μ ±30% ) is used as control limits. Two decision rules are given here. Rule 1: If one or more of the next seven samples yield values of the sample average that fall outside the control limits, conclude that the process is out of...

  • What is a control chart? What are its main features and how is it used? I...

    What is a control chart? What are its main features and how is it used? I included the definition of a control chart so there isn't any confusion. Please include an explantion in your own words. Control Chart Assuming production engineers have gotten everything to work such that the process conforms to specifications (the average of the process is close to the target value and the variability [standard deviation] is very small), after that they have to ensure that the...

  • 1st*variability is: in control/out of control 2nd*no samples fall/one/two/more 3rd* in control/out of control The following...

    1st*variability is: in control/out of control 2nd*no samples fall/one/two/more 3rd* in control/out of control The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. X Sample R 1 95.72 1.0 95.24 2 0.9 0.9 95.18 95.42 0.4 4 5 95.46 0.5 95.32 1.1 6 7 95.40 0.9 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12...

  • Smith and Johnson Industries has decided to use a p-Chart with 3-sigma control limits to monitor...

    Smith and Johnson Industries has decided to use a p-Chart with 3-sigma control limits to monitor the proportion of defective galvanized pipes produced by their production process. The quality control manager randomly samples 150 galvanized pipes at 16 successively selected time periods and counts the number of defective galvanized pipes in the sample. Step 1 of 8: What is the Center Line of the control chart? Round your answer to three decimal places. Step 2 of 8: What value of...

  • I already have calculated for question #4 and got these numbers xdouble bar=28.07 UCL=29.08 LCL=27.08 ,Rbar=1.74,...

    I already have calculated for question #4 and got these numbers xdouble bar=28.07 UCL=29.08 LCL=27.08 ,Rbar=1.74, UCL=3.67, LCL=0 Sample Size=5 Continuing on from question #4, the employee continues to track the same data for 10 weeks after the supplier change, and gets the following data: Sample data: 1 2 3 4 5 6 7 8 9 10 Mean 27.8 28.9 27.4 28.7 28.0 27.1 27.2 27.3 28.0 27.4 Range 2.3 1.5 3.0 2.1 3.2 2.2 3.6 2.0 3.4 1.7 The...

  • Please answer to all parts of the problems. Do not answer if you do not get the right answer. Tha...

    Please answer to all parts of the problems. Do not answer if you do not get the right answer. Thank you! Control charts are to be kept on the thickness measurements for a process that rolls 10-gage copper sheets. The current specification in the sheets is 0.1360+0.0020 inch. After collecting 25 samples of n 5 measurements at approximately half-hour intervals, the data were used to determine Σ L:3.421 inches and R.-0.044 inches, with i1 to 25. Assume that the quality...

  • QUESTIONS 7 - 11 Use the SAME letters above to answer the following questions 7. In...

    QUESTIONS 7 - 11 Use the SAME letters above to answer the following questions 7. In eukaryotic organisms, mRNA that is made from DNA is almost always much larger right after it is synthesized compared to when it finally engages with a ribosome to make a protein. This process is called 8. In the process defined in question 7, is/are cut out of the DNA. 9. In eukaryotic organisms, activators bind to control regions called that are distant from the...

  • The Operations manager at a large widget factory is complaining that since the company has changed...

    The Operations manager at a large widget factory is complaining that since the company has changed to a cheaper supplier for one of the raw materials used for widgets, the quality of their widget has changed. In fact, he has one of the final widgets that has a strength testing below their spec. The new operations employee had previously taken 5 samples each week over a 10-week period, and logged the data in the chart below. Calculate upper and lower...

  • Question 1 For each of the following sub-questions, select the best answer. Each correct answer is...

    Question 1 For each of the following sub-questions, select the best answer. Each correct answer is worth two marks. 1. Neither Chile nor Peru has a mass-market café culture, but this fact has not stopped Starbucks from trying to determine what can be done to make its coffee houses successful in those markets. By recognizing that people in these two South American countries do not drink coffee as people in the United States do and that it needs to change...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT