Question

Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centersTP = number of straps purchased Min FM + FP SM + SP + TM + ТР s.t. FM SM TM FM SM s FM SM + TM 3 1 FM + 1 FP 1 SM + 1 SP 1 TMb. What is the total cost of the manufacturing and purchasing plan? When required, round your answer to the nearest dollar. $

0 0
Add a comment Improve this question Transcribed image text
Answer #1

Based on the decision variables defined in the question,

Total Cost = 39*FM + 12.5*SM + 7.5*TM + 52*FP + 16*SP + 8.5*TP

We have to minimize this cost

Subject to constraints

3.6*FM + 1.4*SM + 0.9*TM <= 370 hours * 60 minutes i.e. 22200..........Constraint for availability of minutes of Cutting time

2.3*FM + 1.8*SM + 0*TM <= 430 * 60 = 25,800 .....................................Constraint for availability of minutes of Milling time

3.2*FM + 2.7*SM + 1.8*TM <= 690*60 = 41,400......................................Constraint for availability of minutes of Shaping time

Total Demand of final product = 6000 units

FM + FP >= 6000..........Constraint for demand of Frames

SM + SP >= 12000........Constraint for demand of Support (2 supports per 1 Liftmaster)

TM + TP >= 6000..........Constraint for demand of Strap

Hence, we get formulation as

Minimize Total Cost C = 39*FM + 12.5*SM + 7.5*TM + 52*FP + 16*SP + 8.5*TP

Subject to Constraints:

3.6*FM + 1.4*SM + 0.9*TM <= 22200

2.3*FM + 1.8*SM + 0*TM <= 25800

3.2*FM + 2.7*SM + 1.8*TM <= 41400

FM + FP >= 6000

SM + SP >= 12000

TM + TP >= 6000

FM, SM, TM, FP, SP, TP >=0

We solve in Excel using Excel solver as shown below:

Variables FM SM TM FP 6000 429 0 0 SP 11571 6000 ТР Objective Min C $ 4,75,500 Constraints 1 2 3 22200 14571 20357 6000 12000

The above solution in the form of formulas along with Excel Solver extract is shown below for better understanding and reference:

D E F H Solver Parameters Set Objective: $B$10 To: O Max Min O Value of: 0 By Changing Variable Cells: $B$2:$B$7 Subject to t

As seen from the above solution, we get

Frames Supports Straps Manufacture Purchase 6000 0 429 11571 0 6000

b. The total cost of manufacturing and purchasing plan = $475,500

c. Hours used:

Hours of Department Production Time used Cutting 370 Milling 242.86 Shaping 339.29

For part d and e, we generate a sensitivity report as shown below:

Variable Cells Cell Name $B$2 FM $B$3 SM $B$4 TM $B$5 FP $B$6 SP $B$7 TP Final Reduced Objective Allowable Allowable Value Co

d. As seen from the above sensitivity report,

The shadow price for Shaping Department (Cell B15 in Constraints table) is 0. Hence, any increase in the number of hours in the shaping department will lead to a 0 decrease in total cost. Hence, 0 hours should be Frandec should be willing to pay $0.

e. As seen from the above sensitivity report,

The Reduced cost for Frames to be purchased (Cell B5 in Variables table) is 4. In order to make the optimal solution such that Frames are purchased, the price of frames should be reduced by at least $4 i.e. 52-4 = $48. Since the supplier is supplier at $46 which is less than minimum reduced price, Frandec can improve by pursuing this opportunity

Answer: Yes

Because the current purchase price is $52. The reduced cost is $4 which means that the solution may be improved if the cost is $48 or below.

Add a comment
Know the answer?
Add Answer to:
Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...

    Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec’s production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs per unit...

  • Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One...

    Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 6000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps purchased from an outside supplier. Manufacturing and purchase costs per unit are shown. may be either manufactured by the...

  • Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution...

    Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase costs...

  • Need help with part e please Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling...

    Need help with part e please Problem 4-17 Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor, two supports, and a metal strap. Frandec's production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an...

  • Problem 4-17 (Algorithmic) Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and...

    Problem 4-17 (Algorithmic) Frandec Company manufactures, assembles, and rebuilds material handling equipment used in warehouses and distribution centers. One product, called a Liftmaster, is assembled from four components: a frame, a motor two supports, and a metal strap. Frandec's production schedule calls for 5000 Liftmasters to be made next month. Frandec purchases the motors from an outside supplier, but the frames, supports, and straps may be either manufactured by the company or purchased from an outside supplier. Manufacturing and purchase...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,120 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical Industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2.380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,400 hours of welding time is available annually on the machine. Because each drum requires 0.8 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical industry. One of the company’s products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2,240 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

  • TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used...

    TufStuff, Inc., sells a wide range of drums, bins, boxes, and other containers that are used in the chemical Industry. One of the company's products is a heavy-duty corrosion-resistant metal drum, called the WVD drum, used to store toxic wastes. Production is constrained by the capacity of an automated welding machine that is used to make precision welds. A total of 2.380 hours of welding time is available annually on the machine. Because each drum requires 0.4 hours of welding...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT