Q23. Option(B). $56.74 is the correct answer;
Q24. Option(D). $59.23 is the correct answer;
Q25. Option(B). $107,802 is the correct answer;
--
-------------------------------------
If you have any queries/doubts,Immediately drop your
messages in the comment box !!!! I will help you...
Thanks!!!
Accola Company uses activity-based costing. The company has two products: A and B. The annual production...
Abbe Company uses activity-based costing. The company has two products: A and B. The annual production and sales of Product A is 2,200 units and of Product B is 1,250 units. There are three activity cost pools, with estimated costs and expected activity as follows: Activity Cost Pools Estimated Overhead Cost Expected Activity Product A Product B Total Activity 1 $ 66,033 1,700 1,600 3,300 Activity 2 $ 88,929 2,700 1,400 4,100 Activity 3 $ 102,486 880 860 1,740 The...
1.Abbe Company uses activity-based costing. The company has two products: A and B. The annual production and sales of Product A is 1,600 units and of Product B is 950 units. There are three activity cost pools, with estimated costs and expected activity as follows: Activity Cost Pools Estimated Overhead Cost Expected Activity Product A Product B Total Activity 1 $ 38,241 1,100 1,000 2,100 Activity 2 $ 58,551 2,100 800 2,900 Activity 3 $ 72,702 640 620 1,260 The...
Matt Company uses activity-based costing. The company has two products: A and B. The annual production and sales of Product A is 5,000 units and of Product B is 7,000 units. There are three activity cost pools, with estimated total cost and expected activity as follows: Expected Activity Activity Cost Pool Estimated Cost Product A Product B Total Activity 1 $24,000 200 400 600 Activity 2 36,000 700 200 900 Activity 3 81,200 800 3,000 3,800 The cost per unit...
5. Matt Company uses activity-based costing. The company has two products: A and B. The annual production and sales of Product A is 8,000 units and of Product B is 6,000 units. There are three activity overhead cost pools, with estimated total overhead cost and expected activity as follows: Activity Cost Pool Expected Activity Product A Product B Total Estimated Cost $20,000 $37,000 $91,200 Activity 1... Activity 2.......... Activity 3 100 800 800 400 200 3,000 500 1,000 3,800 The...
5. Tanner Company has two products: A and B. The company uses activity-based costing and has prepared the following analysis showing the estimated total cost and expected activity for each of its three activity cost pools: Activity Cost Pool Activity 1 Activity 2 Activity 3 Estimated Overhead Cost $ 40,000 $ 29,200 $180,000 Expected Activity Product A Product B 200 800 1,000 500 600 5,400 Total 1,000 1,500 6,000 The annual production and sales level of Product A is 9,094...
Acton Company has two products: A and B. The annual production and sales of Product A is 800 units and of Product B is 500 units. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. Product A requires 0.3 direct labor-hours per unit and Product B requires 0.2 direct labor-hours per unit. The total estimated overhead for next period is $92,023. The company is considering switching to an activity-based costing system for...
Acton Company has two products: A and B. The annual production and sales of Product A is 800 units and of Product B is 500 units. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. Product A requires 0.3 direct labor-hours per unit and Product B requires 0.2 direct labor-hours per unit. The total estimated overhead for next period is $92,023. The company is considering switching to an activity-based costing system for...
Acton Company has two products: A and B. The annual production and sales of Product A is 800 units and of Product B is 500 units. The company has traditionally used direct labour hours as the basis for applying all manufacturing overhead to products. Product A requires 0.3 direct labour hours per unit, and Product B requires 0.2 direct labour hours per unit. The total estimated overhead for next period is $92,023. The company is considering switching to an activity-based...
Acton Company has two products: A and B. The annual production and sales of Product A is 800 units and of Product B is 500 units. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. The total estimated overhead for next period is $92,023. The company is considering switching to an activity-based costing system for the purpose of computing unit product costs for external reports. The new activity-based costing system would have...
Adelberg Company has two products: A and B. The annual production and sales of Product Ais 2.500 units and of Product Bis 2,000 units. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products Product A requires 0.3 direct labor- hours per unit and Product requires 0.6 direct labor hours per unit. The total estimated overhead for next period is $108,775. The company is considering switching to an activity based costing system for...