Sway With the Breeze, LLC builds custom treehouses. On March 1, 2 jobs were in process: Oak, with a beginning balance of $12,000, and Poplar, with a beginning balance of $8,600. During March, two other jobs were started: Magnolia and Pine. During March, Oak and Magnolia were sold at cost plus 30%. Poplar and Pine remained in process at month end.
Job cost details for March | ||||||
Particulars | Oak | Poplar | Magnolia | Pine | Total | |
a | Opening WIP | $ 12,000 | $ 8,600 | $ 20,600 | ||
Costs Incurred in March | ||||||
b | Direct Materials | $ 1,200 | $ 8,000 | $ 2,100 | $ 3,000 | $ 14,300 |
c | Direct Labor cost | $ 1,800 | $ 4,800 | $ 360 | $ 1,200 | $ 8,160 |
d | Direct Labor cost/Hr = | $ 20 | $ 20 | $ 20 | $ 20 | |
e | Direct Labor Hours =c/d | 90.00 | 240.00 | 18.00 | 60.00 | 408.00 |
f | Predetermined Mfg OH applied @$5 /Direct labor Hr =e*5= | $ 450 | $ 1,200 | $ 90 | $ 300 | $ 2,040 |
g | Total Cost Incurred in March =b+c+f | $ 3,450 | $ 14,000 | $ 2,550 | $ 4,500 | $ 24,500 |
h | Total Cost of Jobs =a+g | $ 15,450 | $ 22,600 | $ 2,550 | $ 4,500 | $ 45,100 |
Job status at March end | Sold | WIP | Sold | WIP |
Manufacturing Overhead applied | $ 2,040 |
Actual Manufacturing OH Incurred | $ 2,000 |
Manufacturing OH Overapplied | $ 400 |
Sales Details | Oak | Magnolia | Total |
Cost of Jobs | $ 15,450 | $ 2,550 | $ 18,000 |
Less : Mfg Overhead Overapplied | $ (40) | ||
Net Cost of Goods Sold | $ 17,960 | ||
Sales Price with 30% mark up on Job cost = | $ 20,085 | $ 3,315 | $ 23,400 |
Gross Profit | $ 5,440 | ||
WIP Details | Poplar | Pine | Total |
WIP Inventory cost | $ 22,600 | $ 4,500 | $ 27,100 |
Statements | ||
A: Is incorrect as two jobs were in WIP not "Completed but not sold "at March end. | ||
B: Is incorrect as sales revenue for March is $23,400 | ||
C: Is correct as Gross Profit for March is $5,440 | ||
D: Is incorrect as ending WIP of March is valued at $27,100 | ||
E: Is incorrect as Mfg OG was overapplied by $40 | ||
Sway With the Breeze, LLC builds custom treehouses. On March 1, 2 jobs were in process:...
Sway With the Breeze, LLC builds custom treehouses. On March 1, 2 jobs were in process: Oak, with a beginning balance of $12,000, and Poplar, with a beginning balance of $8,600. During March, two other jobs were started: Magnolia and Pine. During March, Oak and Magnolia were sold at cost plus 30%. Poplar and Pine remained in process at month end. During March, the following costs were incurred for each job: Oak Poplar Magnolia Pine Direct materials $1,200 $8,000 $2,100...
During March, the following costs were incurred for each job: Oak Poplar Magnolia Direct materials $1,200 $8,000 $2,100 Direct labor* $1,800 $4,800 $360 *Direct labor wages average $20 per direct labor hour. Pine $3,000 $1,200 The company uses a traditional, normal costing system to allocate manufacturing overhead to production. The predetermined manufacturing overhead rate calculated at the beginning of the year was $5 per direct labor hour. Actual manufacturing overhead for March was $2,000. Given that MOH is closed to...
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $11 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 30% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Angry Birds, Inc. designs and builds retaining walls for individual customers. On August 1, 2 jobs were in process: Level 1 with a beginning balance of $12,000 and Level 2 with a beginning balance of $8,600. During August, Level 3 and Level 4 were started. Levels 1 and 2 were sold at cost plus 40% during August. All other jobs remained in process at month end. The company applies manufacturing overhead at a rate of $9 per direct labor hour....
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. It started only two jobs during March—Job P and Job Q. Job P was completed and sold by the end of March and Job Q was incomplete at the end of March. The company uses a plantwide predetermined overhead rate based on direct labor-hours. The following additional information is available for the company as a whole and for Jobs P and Q (all data...
apter 21 E2-11 (Algo) Calculating Cost of Jobs in Work in Process, Finished Goods, and Cost of Goods Sold [LO 2- Jenkins Company uses a job order cost system with overhead applied to jobs on the basis of direct labor hours. The direct labor rate is $20 per hour, and the predetermined overhead rate is $15 per direct labor hour. The company worked on three jobs during April Jobs A and B were in process at the beginning of April....