As for a given job the direct costs associated with the job are O A. fixed costs O B. actual overhead O C. raw materials D. s
0 0
Add a comment Improve this question Transcribed image text
Answer #1

Answer

C. Raw Material

Explanation:

  1. Fixed costs are costs that do not change with change in production.
  2. Actual overheads are overheads incurred for the job.
  3. Raw Materials are the direct costs that can be traced to the job.
  4. Sunk Costs are costs already incurred.

In case of any doubt or clarification, you're welcome to come back via comments.

Add a comment
Know the answer?
Add Answer to:
As for a given job the direct costs associated with the job are O A. fixed...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • QUESTION 10 For a given job the direct costs associated with the job are actual overhead...

    QUESTION 10 For a given job the direct costs associated with the job are actual overhead that has been applied to the job raw materials that can be traced to the job in an economically feasible way All sunk costs that can be traced to the job in an economicaly feasible way all fixed costs

  • Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead...

    Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. A detailed estimate of what a product should cost.Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows: Standard Costs Actual Costs Direct materials 189,000 lbs. at $6.00 187,100...

  • Which of the following is the O A Direct materials are considered to be fixed costs....

    Which of the following is the O A Direct materials are considered to be fixed costs. OB. The average cost per unit can be used for predicting total costat many different output levels OC. Manufacturing overhead is composed of only variable costs. OD. Fund costs stay constant in total over a wide range of activity levels Multim Chapter Dynal C to select your MacBook Air D BN M MOMO

  • Question 24 2p When direct labor costs are recorded in a job costing O Factory Wages...

    Question 24 2p When direct labor costs are recorded in a job costing O Factory Wages Payable is debited and Work in Process Inventory is credited O Work in Process Inventory is debited and Factory Wages Payable is credited Cost of Goods Manufactured is debited and Direct Labor is credited ODirect Labor and Indirect Labor are debited and Factory Wages Payable is credited O Work in Process Inventory is debited and Factory Overhead is credited costs How much overhead Question...

  • 1. A normal job-order costing system is a system that uses: a. actual costs for direct...

    1. A normal job-order costing system is a system that uses: a. actual costs for direct materials and estimated costs for direct labor and overhead. b. actual costs for direct materials and direct labor and estimated costs for overhead. c. actual costs for direct materials and overhead, estimated costs for direct labor. d. estimated costs for direct materials, direct labor, and overhead. . 2.  Mitchell's Softball Gloves Company estimated the following at the beginning of the year: ​ Assembly Department Testing...

  • 1.Consider a single job at Company B: Direct Materials costs were : 7,882 Direct labor was...

    1.Consider a single job at Company B: Direct Materials costs were : 7,882 Direct labor was 64 hours at a rate of $16/HR MOH is allocated to jobs based on labor hours Budgeted MOH cost is 23,428 Budgeted dl labor hours is 4,622 actual MOH was 28,730 actual direct labor hours was 5,422 If actual costing is used, what is the actual overhead rate? 2. Consider a single job at Company B: Direct Materials costs were : 6,845 Direct labor...

  • Assume Drake Consulting has created a standard cost card for each job. Standard direct materials per...

    Assume Drake Consulting has created a standard cost card for each job. Standard direct materials per job include 14 software packages at a cost of $950 per package. Standard direct labor costs per job include 100 hours at $150 per hour. Drake plans on completing 11 jobs during March 2018. Actual direct materials costs for March included 85 software packages at a total cost of $82,875. Actual direct labor costs included 115 hours per job at an average rate of...

  • Destin Products uses a job-costing system with two direct-cost categories (direct materials and direct manufacturing labor)...

    Destin Products uses a job-costing system with two direct-cost categories (direct materials and direct manufacturing labor) and one manufacturing overhead cost pool. Destin allocates manufacturing overhead costs using direct manufacturing labor costs. Destin provides the following information (Click the icon to view the information) Read the requirements Requirement 1. Compute the actual and budgeted manufacturing overhead rates for 2020. (Enter your answer as a number (not as a percentage] rounded to two decimal places, X.XX.) Actual manufacturing overhead rate Budgeted...

  • In a job-order costing system that is based on machine-hours, which of the following formulas is correct? A) Predeter...

    In a job-order costing system that is based on machine-hours, which of the following formulas is correct? A) Predetermined overhead rate = Actual manufacturing overhead ÷ Actual machine-hours B) Predetermined overhead rate = Actual manufacturing overhead ÷ Estimated machine-hours C) Predetermined overhead rate = Estimated manufacturing overhead ÷ Estimated machine-hours D) Predetermined overhead rate = Estimated manufacturing overhead ÷ Actual machine-hours 41. Which of the following statements about using a plantwide overhead rate based on direct labor is correct? A)...

  • A normal job-order costing system is a system that determines unit cost by using: estimated costs...

    A normal job-order costing system is a system that determines unit cost by using: estimated costs for direct materials, direct labor, and overhead. O actual costs for direct materials and direct labor and estimated costs for overhead. O actual costs for direct materials and estimated costs for direct labor and overhead. actual costs for direct materials and overhead and estimated costs for direct labor.

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT