Allocation of Janitorial Deptt (basis of Sq. ft) | ||||||
Total Sq. feet area of two production department = 600+2400 = 3000 | ||||||
% of Sq ft area occupied by Cutting =600/3000*100 = 20% | ||||||
% of Sq ft area occupied by Assembly = 2400/3000*100 = 80% | ||||||
Janitorial cost allocated: | ||||||
Cutting department = 290,000*20% = | 58,000 | |||||
Assembly department = 290,000*80% = | 2,32,000 | |||||
Allocation of Cafeteria Department (basis of number of employees) | ||||||
Total Number of employees = 16+4 = 20 | ||||||
% of employees in Cutting = 16/20 *100 = 80% | ||||||
% of employees in Assembly = 4/20*100 = 20% | ||||||
Cafeteria cost allocated | ||||||
Cutting department = 180,000*80% = | 1,44,000 | |||||
Assembly department = 180,000*20% = | 36,000 | |||||
Final Answer: | ||||||
Cutting | Assembly | |||||
Janitorial department cost allocated | 58,000 | 2,32,000 | ||||
Cafeteria department cost allocated | 1,44,000 | 36,000 | ||||
Support department cost allocation-direct method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two...
Support department cost allocation—direct method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Department Cafeteria Department Cutting Department Assembly Department Department costs $280,000 $170,000 $1,480,000 $670,000 Square feet 48 5,200 1,200 1,800 Number of employees 12 2 14 6 Allocate the support department...
Support department cost allocation direct method Becker Tabletops has two support departments (anitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Cafeteria Cutting Assembly Department Department Department Department Department costs $310,000 $169,000 $1,504,000 $680,000 Sare feet 5.000 1,000 4,000 Number of employees 10 3 30 10 Allocate the support department costs to the production...
Support department cost allocation-sequential method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Cafeteria Cutting Assembly Department Department Department Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees 10 3 30 10 Allocate the support department costs to the production...
Support department cost allocation-reciprocal services method Becker Tabletops has two support departments ( Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Department $310,000 50 10 Department costs Square feet Number of employees Cafeteria Department $169,000 5,000 3 Cutting Department $1,504,000 1,000 30 Assembly Department $680,000 4,000 10 Allocate the support department costs to...
Support department cost allocation-direct method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Cafeteria Cutting Assembly Department Department Department Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees 10 3 30 10 Allocate the support department costs to the production...
1. Support department cost allocation—sequential method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Department Cafeteria Department Cutting Department Assembly Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees 10 3 30 10 Allocate the support...
- Show Me How Calculator upport department cost allocation direct method Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Cafeteria Cutting Assembly Department Department Department Department Department costs $290,000 $190,000 $1,490,000 $700,000 Square feet 5,200 1,000 4,000 Number of employees 16 Allocate the support department costs to...
Support department cost allocation—comparison Becker Tabletops has two support departments ( Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Department Cafeteria Department Cutting Department Assembly Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees 10 3 30 10 Allocated the support department costs to the production...
Support department cost allocation—comparison Becker Tabletops has two support departments ( Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevant details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Department Cafeteria Department Cutting Department Assembly Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees 10 3 30 10 Allocated the support department...
Becker Tabletops has two support departments (Janitorial and Cafeteria) and two production departments (Cutting and Assembly). Relevan details for these departments are as follows: Support Department Cost Driver Janitorial Department Square footage to be serviced Cafeteria Department Number of employees Janitorial Cafeteria Cutting Assembly Department Department Department Department Department costs $310,000 $169,000 $1,504,000 $680,000 Square feet 50 5,000 1,000 4,000 Number of employees Allocate the support department costs to the production departments using the sequential method. Allocate the support department...