Activity | Overhead Cost | Activity Driver | Activity Rate = Overhead/Activity Driver | |
Supervision | 2160 | 18000 | 12% | of Direct Labor cost |
Depreciation | 28840 | 1000 | 28.84 | per machine hour |
Assembly line preparation | 23000 | 126 | 182.54 | per setup |
Rounded Edge | Activity Rate | Driver Incurred | Overhead Assigned = Rate*Driver | |
Supervision | 12% | 6000 | 720 | |
Depreciation | 28.84 | 400 | 11536 | |
Assembly line preparation | 182.54 | 31 | 5658.730159 | |
Total | 17914.73016 | |||
Squared Edge | Activity Rate | Driver Incurred | Overhead Assigned = Rate*Driver | |
Supervision | 12% | 12000 | 1440 | |
Depreciation | 28.84 | 600 | 17304 | |
Assembly line preparation | 182.5396825 | 95 | 17341.26984 | |
36085.26984 | ||||
Rounded Edge | Squared Edge | |||
Direct Material | 9500 | 21500 | ||
Direct Labor | 6000 | 12000 | ||
Overheads | 17914.73016 | 36085.26984 | ||
Total Cost | 33414.73016 | 69585.26984 | ||
Quantity Produced | 10600 | 14100 | ||
Average cost per foot | 3.152333034 | 4.935125521 |
Need help figuring out this problem. Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces...
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,400 6,100 18,300 $ 33,800 10,600 ft. $ 3.19 Squared Edge Total $ 21,700 $ 31,100 11,900 18,000 35,700 54,000 $ 69,300 $...
Exercise 17-17 Activity-based costing LO P3 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300$ of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,300 6,000 18,000 $33,300 10,700 ft. $ 3.11 Squared Edge Total $21,400 $ 30,700 12,000 18,000 36,000 54,000 $69,400 $102,700 14,200 ft. $ 4.89...
Exercise 4-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (3001 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $9.500 6. 100 18,300 $34,000 10,300 ft. $ 3.30 Squared Edge Total $21.600 31,200 11,900 18,000 35,700 54,000 $69,200 $103,200 14,200 ft. $ 4.87...
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,400 6,200 18,600 $34,200 10,400 ft. $ 3.29 Squared Edge Total $21,700 $ 31,100 12,000 18,200 36,000 54,600 $69,700 $103,900 14,100 ft. $...
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materiale Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average coat per ft. (rounded) Rounded Edge Squared Edge Total $ 9,500 $21,500 $ 31,000 6,100 12,000 18,100 18,300 36,000 54,900 $33,900 $69,500 $103,900 10, 400 ft. 14,100 ft $ 3.26...
HOW DO I CALCULATE? Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,700 6,100 18,300 $34,100 10,600 ft. $ 3.22 Squared Edge Total $21,600 $ 31,300 11,900 18,000 35,700 54,000 $69,200 $ 103,300 14,200 ft. $ 4.87 Glassworks's...
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (3008 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9, 700 6.100 18,300 $34,100 10,300 ft. $ 3.31 Squared Edge Total $21,700 $ 31,400 11.900 18.000 35,700 54,000 $69,300 $103,400 14,000 ft. S 4.95 Glassworks's controller wishes to apply...
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (382% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,500 6.100 18,388 $ 33,982 10,688 ft. $ 3.20 Squared Edge Total $ 21,500 $ 31,000 11,900 18,00 35.700 54,00 $ 69,182 $183,888 14,288 ft. $ 4.87 Glassworks's controller wishes...
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information. She has also collected the following information about the cost drivers for...
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. ota Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) 6,100 18,300 34,100 10,300 ft. 11,980 5,700 A 18,000 54,000 69,300 103,400 14,000 ft. $ 3.31 4.95 Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs...