Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared

Required: 1. Assign these three overhead cost pools to each of the two products using ABC. Activity Overhead Cost Activity Dr

0 0
Add a comment Improve this question Transcribed image text
Answer #1
Ans.1 Activity Overhead cost (a) Activity drivers (b) Activity rate (a / b)
Supervision $2,184 $18,200 Direct labor cost 12.00% of Direct labor cost
Depreciation of machinery $29,160 1000 Machine hours $29.16 Per Machine hours
Assembly line preparation $23,256 126 Setups (number) $184.57 Per Setup
Rounded edge Activity rate (a / b) Activity driver Overhead
incurred assigned
Supervision 12% of Direct labor cost $6,200 $744
Depreciation of machinery $29.16 Per Machine hours 300 $8,748
Assembly line preparation $184.57 Per Setup 31 $5,722
TOTAL OVERHEAD ASSIGNED $15,214
Squared edge Activity rate (a / b) Activity driver Overhead
incurred assigned
Supervision 12% of Direct labor cost $12,000 $1,440
Depreciation of machinery $29.16 Per Machine hours 700 $20,412
Assembly line preparation $184.57 Per Setup 95 $17,534
TOTAL OVERHEAD ASSIGNED $39,386
Ans. 2 Rounded edge Squared edge
Direct materials $9,400 $21,700
Direct labor $6,200 $12,000
Overhead assigned $15,214 $39,386
Total manufacturing costs $30,814 $73,086
Quantity produced 10400 14100
Average cost per foot $2.96 $5.18
Average cost per foot   =   Total manufacturing cost / Quantity produced
*Activity rate = Overhead cost / Activity drivers
Add a comment
Know the answer?
Add Answer to:
Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded...
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for? Ask your own homework help question. Our experts will answer your question WITHIN MINUTES for Free.
Similar Homework Help Questions
  • Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded...

    Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materiale Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average coat per ft. (rounded) Rounded Edge Squared Edge Total $ 9,500 $21,500 $ 31,000 6,100 12,000 18,100 18,300 36,000 54,900 $33,900 $69,500 $103,900 10, 400 ft. 14,100 ft $ 3.26...

  • Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded...

    Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,400 6,100 18,300 $ 33,800 10,600 ft. $ 3.19 Squared Edge Total $ 21,700 $ 31,100 11,900 18,000 35,700 54,000 $ 69,300 $...

  • Exercise 4-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded...

    Exercise 4-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (3001 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $9.500 6. 100 18,300 $34,000 10,300 ft. $ 3.30 Squared Edge Total $21.600 31,200 11,900 18,000 35,700 54,000 $69,200 $103,200 14,200 ft. $ 4.87...

  • Exercise 17-17 Activity-based costing LO P3 Glassworks Inc. produces two types of glass shelving, rounded edge...

    Exercise 17-17 Activity-based costing LO P3 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300$ of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,300 6,000 18,000 $33,300 10,700 ft. $ 3.11 Squared Edge Total $21,400 $ 30,700 12,000 18,000 36,000 54,000 $69,400 $102,700 14,200 ft. $ 4.89...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,600 6,200 18.600 $34,400 10,500 ft. $ 3.28 Squared Edge Total $21,500 $ 31,100 11,900 18,100 35,700 54,300 $69,100 $103,500 14,200 ft. $ 4.87 Glassworks's controller wishes to apply activity-based...

  • Question 7 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on...

    Question 7 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,400 6,200 18,600 $34,200 10,600 ft. $ 3.23 Squared Edge Total $21,700 $ 31,100 11,900 18,100 35,700 54,300 $69,300 $ 103,500 14,100 ft. $ 4.91 Glassworks's controller wishes...

  • Need help figuring out this problem. Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces...

    Need help figuring out this problem. Exercise 17-14 Activity-based costing LO P3 A2 Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,500 6,000 18,000 $ 33,500 10,600 ft. $ 3.16 Squared Edge Total $ 21,500 $ 31,000 12,000...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge $ 9,300 6.200 Direct materials Direct labor Overhead (300 of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) 18,600 $34,100 10,600 ft. Squared Edge Total $21.500 11.00 18.000 35,400 $103,100 14,100 ft. Glassworks's controller wishes to apply activity based costing (ABC) to allocate the $54,000 of...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (382% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,500 6.100 18,388 $ 33,982 10,688 ft. $ 3.20 Squared Edge Total $ 21,500 $ 31,000 11,900 18,00 35.700 54,00 $ 69,182 $183,888 14,288 ft. $ 4.87 Glassworks's controller wishes...

  • Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same...

    Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Rounded Edge Squared Edge $21,700 11,900 35,700 $69,300 Total Direct materials $9,400 31,100 17,900 53,700 Direct labor 6,000 Overhead (300% of direct labor cost) 18,000 $33,400 $102,700 Total cost 10,600 ft. $ 3.15 Quantity produced 14,100 ft 4.91 Average cost per ft. (rounded) Glassworks's controller wishes to apply activity-based costing (ABC) to...

ADVERTISEMENT
Free Homework Help App
Download From Google Play
Scan Your Homework
to Get Instant Free Answers
Need Online Homework Help?
Ask a Question
Get Answers For Free
Most questions answered within 3 hours.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT